Shadydale 1stP-CS 990305 · . Coppell, Texas 75019
Feb.4, 1999
Dan M. Dowdey, P.E.
Dowdey, Anderson and Associates
5225 Village Creek Drive, Suite 200 '---' --
Piano, Texas 75093
'l
RE: Shadydale Acres
Development Fee Assessment
Dear Mr. Dowdey:
Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy
of the Development Fee calculations for the referenced development.
Please make payment to the City of Coppell in the amount of ~ and forward to the
Finance Department along with a copy of the Fee Assessment table. This amount is a portion
of the assessed fees which need to be paid prior to Council approval. Please refer to attached
table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office
so the construction inspection fee can be verified.
Providing a copy of your paid receipt to the Engineering Department will help us to verify the
payment of required fees and insure a successful beginning of this project. We look forward
to working with you on this project. If you have any questions, please contact me.
Kenneth M. G~i~, ~.E.
Director of Engineering & Public Works
cc: Jennifer Armstrong, Finance Director
Doug Stevens, Engineering Technician
Glenn Hollowell, Assistant Director of Public Works
Greg Jones, Chief Building Official
Gary Sims, Director of Leisure Services
DEVELOPMENT FEE TABLE
Project: Shadydale Acres
Date: 3/5/99
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee $5,400.00 $5,400.00
(100% due prior to Council Approval)
Water Tap Inspection Fee $600.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $297.96
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $0.00
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $420.00
(100% due at Issuance of Water Meter)
IrrigatiordFireline Meter Deposit $0.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $5,400.00 $5,400.00
(100% due prior to Council Approval)
Wastewater Tap Inspection Fee $600.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $600.00
(100% due at Issuance of Building Permit)
Park Fee $16,705.00 $16,705.00
(100% due prior to Council Approval)
Roadway Impact Fee $11,115.00 $11,115.00
(100% due prior to Council Approval)
Street Light Fee $0.00
(100% due prior to Acceptance of Project
Street Sign Fee $0.00
(100% due prior to Acceptance of Project
Construction Inspection Fee $0.00
TOTAL $41,137.96
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $38,620.00
DEVELOPMENT FEE WORKSHEET : rVl, rl
PROJECT: $1mdyd~de Acres
DATE: 3/5/99
Water Impact Fee:
Domestic Meter(s): 12 - 5/8 inch X 3/4 inch = 12 ESU's
Irrigation Meter(s): 0 = 0 ESU's
0 = 0 ESU's
Fireline Meter(s): 0 = 0 ESU's
Total #: 12 ESU's @ $450.00 ea. $5,400.00
(100% due prior to Council approval of the final plat)
Water Tap Inspection Fee:
Total #: 12 Connections @ $50.00 ea. $600.00
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Domestic Water Meter Fee:
Total #: 12 Domestic Meter(s) @ $24.83 $297.96
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Irrigation/Fireline Water Meter Fee:
Total #: 0 Irrigation Meter(s) @ $0.00 $0.00
Total #: 0 Additional Irrigation Meter(s) @ $0.00 $0.00
Total #: 0 Fireline Meter(s) @ $0.00 $0.00
(100% due prior to issuance of water meters)
Domestic Water Meter Deposit Fee:
Total #: 12 Meter(s) @ $35.00 ea. $420.00
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 0 Meter(s) @ $30.00 ea. $0.00
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU's: 12 @ $450.00 ea. $5,400.00
Wastewater Tap Inspection Fee:
Total #: 12 Connections @ $50.00 ea. $600.00
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: 12 Lots @ $50.00 ea. $600.00
(100% due prior to issuance of building permit)
Page 1
DEVELOPMENT FEE WORKSHEET ;FVI. FI
Park Fee (For Residential Developments Only):
* Preliminary plat approved: After October 26, 1993
Park Development Zone: Zone 1
13 Single-family @ $1,285.00 per lot $16,705.00
0 Multi-family @ $1,285.00 per unit $0.00
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
Roadway Impact Fee:
(See attached fee calculations) $2,184.00
Street Lighting Fees:
Assessed for lighting in the City's right-of-way. N/A
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
Street Sign Fees:
Assessed for signage in the City's right-of-way. N/A
(See attached fee calculations if applicable)
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment. N/A
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Page 2
ROADWAY IMPACT FEE CALCULATIONS
PROJECT: Shad~da/, Act,, FVI FI
DATE: 3/5/99
ROADWAY IMPACT
Service Area * 1
Category ** Residential
Land Use ** Single-Family Detached
Development Units ** 13
Vehicle Miles per Development Unit ** 2.85
Fee per Vehicle Mile *** $300
Roadway Impact Fee due = (Development Units) x I
(Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $1 I, 115.00
I
* (Figure 2 - Roadway Impact Fee Study)
** (Table 3 - Roadway Impact Fee Study)
*** (Schedule 2, Page 3 - Roadway Impact Fee Study)
Amount due is the lesser of the Street Escrow or the Roadway Impact Fee.