Loading...
Shadydale 1stP-CS 990305 · . Coppell, Texas 75019 Feb.4, 1999 Dan M. Dowdey, P.E. Dowdey, Anderson and Associates 5225 Village Creek Drive, Suite 200 '---' -- Piano, Texas 75093 'l RE: Shadydale Acres Development Fee Assessment Dear Mr. Dowdey: Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Coppell in the amount of ~ and forward to the Finance Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees which need to be paid prior to Council approval. Please refer to attached table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Department will help us to verify the payment of required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Kenneth M. G~i~, ~.E. Director of Engineering & Public Works cc: Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Glenn Hollowell, Assistant Director of Public Works Greg Jones, Chief Building Official Gary Sims, Director of Leisure Services DEVELOPMENT FEE TABLE Project: Shadydale Acres Date: 3/5/99 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $5,400.00 $5,400.00 (100% due prior to Council Approval) Water Tap Inspection Fee $600.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $297.96 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $0.00 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $420.00 (100% due at Issuance of Water Meter) IrrigatiordFireline Meter Deposit $0.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $5,400.00 $5,400.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $600.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $600.00 (100% due at Issuance of Building Permit) Park Fee $16,705.00 $16,705.00 (100% due prior to Council Approval) Roadway Impact Fee $11,115.00 $11,115.00 (100% due prior to Council Approval) Street Light Fee $0.00 (100% due prior to Acceptance of Project Street Sign Fee $0.00 (100% due prior to Acceptance of Project Construction Inspection Fee $0.00 TOTAL $41,137.96 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $38,620.00 DEVELOPMENT FEE WORKSHEET : rVl, rl PROJECT: $1mdyd~de Acres DATE: 3/5/99 Water Impact Fee: Domestic Meter(s): 12 - 5/8 inch X 3/4 inch = 12 ESU's Irrigation Meter(s): 0 = 0 ESU's 0 = 0 ESU's Fireline Meter(s): 0 = 0 ESU's Total #: 12 ESU's @ $450.00 ea. $5,400.00 (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 12 Connections @ $50.00 ea. $600.00 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: 12 Domestic Meter(s) @ $24.83 $297.96 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Irrigation/Fireline Water Meter Fee: Total #: 0 Irrigation Meter(s) @ $0.00 $0.00 Total #: 0 Additional Irrigation Meter(s) @ $0.00 $0.00 Total #: 0 Fireline Meter(s) @ $0.00 $0.00 (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: 12 Meter(s) @ $35.00 ea. $420.00 (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 0 Meter(s) @ $30.00 ea. $0.00 (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 12 @ $450.00 ea. $5,400.00 Wastewater Tap Inspection Fee: Total #: 12 Connections @ $50.00 ea. $600.00 (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 12 Lots @ $50.00 ea. $600.00 (100% due prior to issuance of building permit) Page 1 DEVELOPMENT FEE WORKSHEET ;FVI. FI Park Fee (For Residential Developments Only): * Preliminary plat approved: After October 26, 1993 Park Development Zone: Zone 1 13 Single-family @ $1,285.00 per lot $16,705.00 0 Multi-family @ $1,285.00 per unit $0.00 (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) Roadway Impact Fee: (See attached fee calculations) $2,184.00 Street Lighting Fees: Assessed for lighting in the City's right-of-way. N/A This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right-of-way. N/A (See attached fee calculations if applicable) Construction Inspection Fees: A copy of the development contract must be submitted for assessment. N/A The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Page 2 ROADWAY IMPACT FEE CALCULATIONS PROJECT: Shad~da/, Act,, FVI FI DATE: 3/5/99 ROADWAY IMPACT Service Area * 1 Category ** Residential Land Use ** Single-Family Detached Development Units ** 13 Vehicle Miles per Development Unit ** 2.85 Fee per Vehicle Mile *** $300 Roadway Impact Fee due = (Development Units) x I (Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $1 I, 115.00 I * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study) Amount due is the lesser of the Street Escrow or the Roadway Impact Fee.