Loading...
SC-Coppell HS-CS000214February 14, 2000 BO. Box 478 CoppelI, Texas 75019 972-462-0022 Tri Dal Ltd. James Cofer 540 Commerce Southlake, TX 76092 RE: Coppell High School Stadium Expansion Dear Mr. Cofer: In accordance with your request, inspection service was provided by the City of Coppell Engineering Department at the referenced location on Saturday, February 12, 2000. The overtime rate including salary and benefits is $30.00 per hour. Two hours were charged to your company on that date. Please send a copy of this letter along with your check for $60.00, payable to the City of Coppell to the following address: City of Coppell Finance Department P.O. Box 478 Coppell, TX 75019 Attention: Jennifer Armstrong, Finance Director If you should have any questions, please contact me at (972) 304-3679. Sincere~ i~'nspector CC: Finance Department Debi Ingram, Engineering Secretary 8174818195 ~ 8174816195 OZ-Og-O0 15:Z6 T-703 PO! F-3~1 540 Commerce Southlake, 'IX 76092 Metro (817) 481-2886 Fax (817) 481-8195 Larry Davis Construction Inspector City of Coppell Fax: 972-304-3570 Reference: Saturday Work Subiec~: Coppell Stadium Expansion TI) #99178 Mr. Dav~s, Please accept this letter as notification ~ha~ Tri Dal Ltd. would like ~ work ~his Saturday, the .12th of February, 2000, on the above mentioned project. Please call me if you have any questions or concerns sir. Respectfully, ]ames Corer Project Flanager