SC-Coppell HS-CS000208
COPPELL, TEXAS 75019
Feb~uaz7 8, 2000
P.O. Box 478
Coppell, Texas 75019
972-462-0022
Tri Dal Ltd.
James Cofer
540 Commerce
Southlake, TX 76092
RE: Coppell High School Stadium Expansion
Dear Mr. Corer:
In accordance with your request, inspection service was provided by the City of Coppell
Engineering Department at the referenced location on Saturday, February 5, 2000. The overtime
rate including salary and benefits is $30.00 per hour. Four hours were charged to your company
on that date.
Please send a copy of this letter along with your check for $120.00, payable to the City of
Coppell to the following address:
City of Coppell
Finance Department
P.O. Box 478
Coppell, TX 75019
Attention: Jennifer Armstrong, Finance Director
If you should have any questions, please contact me at (972) 304-3679.
Sincere
Construction Inspector
CC:
Finance Department
Debi Ingram, Engineering Secretary
IT:05 From-TRI DAL L**
$174015Tg5
?-638
P. 02/02
F-640
540 Commerce
Souzhlake, TX 76092
Metro (817) ,~81-2886
Fax (817) ,[81-8195
Larry Davb
Construction Inspector
City of Coppell
Fax: 972-30'1-3570
ReFerence: Saturclay Worlc
Subiect: Coppell Sr. adium Expansion
TD #99178
lv[r. Davis,
Please accept ~is let~r as nodficadon r~a[ Trt Dal Ltd. would tike to work r~is Saturday,
d~e 5th of February, 2000, on ~he above mentioned prolec~. Please call me if you have any
questions or concerns sir.
Respectfully,
Project Manager