Loading...
SC-Coppell HS-CS000208  COPPELL, TEXAS 75019 Feb~uaz7 8, 2000 P.O. Box 478 Coppell, Texas 75019 972-462-0022 Tri Dal Ltd. James Cofer 540 Commerce Southlake, TX 76092 RE: Coppell High School Stadium Expansion Dear Mr. Corer: In accordance with your request, inspection service was provided by the City of Coppell Engineering Department at the referenced location on Saturday, February 5, 2000. The overtime rate including salary and benefits is $30.00 per hour. Four hours were charged to your company on that date. Please send a copy of this letter along with your check for $120.00, payable to the City of Coppell to the following address: City of Coppell Finance Department P.O. Box 478 Coppell, TX 75019 Attention: Jennifer Armstrong, Finance Director If you should have any questions, please contact me at (972) 304-3679. Sincere Construction Inspector CC: Finance Department Debi Ingram, Engineering Secretary IT:05 From-TRI DAL L** $174015Tg5 ?-638 P. 02/02 F-640 540 Commerce Souzhlake, TX 76092 Metro (817) ,~81-2886 Fax (817) ,[81-8195 Larry Davb Construction Inspector City of Coppell Fax: 972-30'1-3570 ReFerence: Saturclay Worlc Subiect: Coppell Sr. adium Expansion TD #99178 lv[r. Davis, Please accept ~is let~r as nodficadon r~a[ Trt Dal Ltd. would tike to work r~is Saturday, d~e 5th of February, 2000, on ~he above mentioned prolec~. Please call me if you have any questions or concerns sir. Respectfully, Project Manager