Loading...
SC-Coppell HS-CS000131January 31, 2000 P.O. Box 478 Coppell, Texas 75019 972-462-0022 Tri Dal Ltd. James Cofer 540 Commerce Southlake, TX 76092 RE: Coppell High School Stadium Expansion Dear Mr. Cofer: In accordance with your request, inspection service was provided by the City of Coppell Engineering Department at the referenced location on Saturday, January 29, 2000. The overtime rate including salary and benefits is $30.00 per hour. Four hours were charged to your company on that date. Please send a copy of this letter along with your check for $120.00, payable to the City of Coppell to the following address: City of Coppell Finance Department P.O. Box 478 Coppell, TX 75019 Attention: Jennifer Armstrong, Finance Director If you should have any questions, please contact me at (972) 304-3679. Sincere.15 Construc fi.on Inspector cc: Finance Department Debi Ingram, Engineering Secretary -.-. 8174818195 ~ Jan-ZG-O0 O~:54pm From-TRI DAL L 8174618T95 T-369 P.01/02 F-362 540 Comme~e Southlake, TX 76092 LTD. Metro (817) 481-2886 Fax (817) 481-8195 Larry Davis Consffucdon Inspector City of Coppell Fax: 972-304-3570 Reference: Saturday Work Subject: Coppell Stadium Expansion TD//99 ! 78 Mr. Davis, Please accept this letter as notification that Tri Dal Ltd. would like to work this Saturday, the ~ of January, 2000, on the above menrJoned project. Please call me if you have any quesdons or concerns sir. ', ]ames Cofer Project Manaser