Loading...
SC-Coppell HS-CS 99111111/17/99 ~972 FUGRO SOUTH, INC. Report Nc. 0791-1060 November 1 I, '! 999 Coppetl c/o SHW Group, Inc. 4000 N. McF..wen Road, Oallas, Texas 75344-5109 Attention: Mr. Mike Elmore 732 $ FUGRO ( SW ) DALLAS Supplement No. 2 GeotechnicaI Investig .on Coppell High School Addition Coppell, Texas ?..~,BO Vtrgo Lane Dallas, Texas 75229 Tel : (972) 484-S301 Fax: (972) e20-7325 Dear Mr. Elmore: A paverr~nt section consisting of 7-i~ch of reinforced concrete pavement over S-inch of compacted Subgrade can be used in lieu of a pavement sectio~ consisting of 6-inch of reinforced concrete pavement on top of 6-inch of lime-stabil[zed subgrade. The compacted subgrade should be prepared in accordance with the recommendations provided in the General Site preparation and Subgrade Preparation Sections of our original geotechnicai report (Fugro-South. Inc. Report No. 0791-1060, datecJ June 15, 1999). We appreciate the opportunity to be of assistance on this project. Please feel free to contact us if you have any questions cr if we can be of further service. Very truly yours i=UGRO SOUTH, INC. Ralph B. Mans , - Project Enginee( Seed M. Hineidi, P,E. Senior Vice President RBM/SMH/bg Copy to: SHW Group, Inc., Mr. Mike Elmore (1) [)al-Mac Construction Company, Damon Norman (~) A memoer ot the Fugro group of cornpan[es with offices t~roug'aoul the