Loading...
WA9601-CS 990621 (4)LANDMARK 1665 Harmon Road Fort Worth, Texas U.S.A. 76177 June 21, 1999 Tel: (817) 439-8888 Fax: (817) 439-9001 City of Coppell 255 Parkway Building Coppell, Texas 75019 Attn: Larry Davis Re: Wagon Wheel Ranch 2.0 MG Elevated Storage Tank Dear Mr. Davis: We opt to use Chlodnation Method No. 3. Which entails for the water and chlodne to be added to the storage facility in amounts such that the solution will initially contain 50 MG/L available chlodne and will fill approximately 5 percent of the total storage volume. This solution shall be held in the storage facility for a period of not less that 6 hours. The storage facility shall then be filled to the overflow level by flowing potable water into the higher chlodnated water. It shall be held for a period of not less that 24 hours. All highly chlodnated water shall then be purged through the drain piping. Following this procedure, and subject to satisfactory bacteriological testing and acceptable aesthetic quality, the remaining water may be delivered to the distribution system. We will dose the tank from the 8" lateral line at the point where we tied onto existing 12" waredine. Therefore chlodnation of all piping on the project along with the chlodnation of the tank. Very truly yours, LANDMARK STRUCTURES, INC. Jason Davis Project Manager /Cm Design Innovation. Construction Excellence