SC-Coppell HS-CS 991202DE VEL OPMENT RE VIE W COMMITTEE
ENGINEERING COMMENTS
ITEM: PD-183, Copper High School, a zoning change request from "C and SF-12'
Commercial and Single-Family-12 to "PD-C" Planned Development,
Commercial, to allow a 6' high decorative metal screening fence with
landscaping along the northern edge of the new parking lot, as well as
incorporate the previously approved site plan allowing the construction of
concession stands, a press box, additional seating at the existing football
stadium, as well as a multipurpose building, tennis court, tennis center, storage
facility and additional parking on property to this planned development to be
located at 185 IF. Parkway Boulevard, at the request of Glenn Engineering,
Inc.
DRC DA TE: November 23, 1999 and December 2, 1999
CONTA CT: Mike Martin, P.E., Assistant City Engineer (972-304-3679)
COMMENTSTATU$: ~wr ra~rrnrn r~v ,/FINAL r~wt;rcwr~
1. No improvements will be allowed in the lO0-year floodplain until a flood study is approved
by the City.