Loading...
SC-Coppell HS-CS 990823COPPELL, TEXAS 75019 P.O. Box 478 Coppell, Texas 75019 972-462-0022 August 23, 1999 DALMAC Construction Don Ivy P.O. Box 830160 Richardson, TX 75083-0160 RE: Coppell High School, 185 W. Parkway Dear Don Ivy: In accordance with your request, inspection service was provided by the City of Coppell Engineering Department at the referenced location on Monday, August 16, 1999. The overtime rate including salary and benefits is $30.00 per hour. Two hours were charged to your company on that date. Please send a check for $60.00 payable to the City of Coppell to the following address: City of Coppell Finance Departmem P.O. Box 478 Coppell, TX 75019 Attention: Jennifer Armstrong, Finance Director If you should have any questions, please contact me at (972) 304-3679. ~~Cor~amct~on I~nspector CCi Finance Department Doug Stevens, Engineering Technician Pcrocker/subdivisrVschools/highschool/overtime ~8/i6/1995 15:17 9727d57~93 972745759J P~GE 01 Leury Davis Coppen Contraction Inspector 255 Pario~y Blvd. PO Box 475 Coppell, Texas 75019-4409 Fax # 9'/2-304-3570 DALMAO 08/16/99 Mr. Davis, Dai Mac Construction Co. is requesting an aRer hours inspection for August 16, 1999, at 185 W. Parkway Blvd., the Coppell High School project. ~ Mac agrees to pay the inspeaion fee of $30.00 per ho~. We request this inspectie~ for thc tie in of the g" fire line at the South side of the 9~' grade center, reE. C2.5. Please advise as to our request. .~~iy Submi~/~ D~I Ma~ Cc: T. Don Ivy file