Loading...
MA FY 97/98-LR 980916 Maxim Technologies Inc. 2575 Lone Star Dr. · P.O. Box 224227 Dallas, Texas 75222 Telephone: (214) 631-2700 FAX: (214) 920-1891 REPORT OF CONCRETE COM PRESSIVE STRENGTH CLIENT: ABCON CONSTRUCTION Attn: Rusty Whitaker PAGE 1 OF 1 1045 E. HWY 121 Lewisville, TX 75057 PROJECT NO.: 9710310 REPORT NO.: 140204 PROJECT: Pavement Renovation -Coppell DATE OF SERVICE: 9/03/98 Texas, Various AUTHORIZATION: Rue ;y 719 I{AWK REPORT DATE'. 9/16/98 SERVICES: Sample concrete at location of placement, perform required field tests, prepare and test concrete compressire strength specimens. PROJECT DATA CONTRACTOR: ABCON CONTRUCTION CLASS OF CONCRETE: Mix #8203 CONCRETE SUPPLIER: TXI DATE OF PLACEMENT: 9/03//98 PLANT: ~31 TIME SAMPLED: 12:30PM BY: CME Division SPECIFICATION REQUIREMENTS TEMPERATURE (DegF) - AIR: 99 CONCRETE: 93 STRENGTH: 3000psi @ 28 DAYS TRUCK NO: ?38 TICKET NO: 21133150 SLUMP: 4" AIR: 3-6 MEASUREDSLUMP(in,): 4.00 METHOD OF TEST AIR CONTENT(%): 5.30 UNIT WEIGHT(pcf): N/A SAMPLING: ASTM C-172 LOCATION OF PLACEMENT: MOLDING & CURING: ASTM C31 SLUMP: ASTM C143 20x13 Concrete section street paving TEMPERATURE: ASTM C1064 positioned dead center of side walk from AIR CONTENT: 718 Hawk Road, right section of right (con'd) UNIT WEIGHT: N/A CAPPING/PADS: ASTM C617 TESTING: ASTM C39 REPORT OF TESTS CONCRETE COMPRESSIVE STRENGTH - 6 X 12 CYLINDERS CYLINDER MAXIMUM COMPRESSIVE MARKED DATE AGE DIAMETER AREA LOAD STRENGTH SET NO. TESTED (days) (in.) (sq.in.) fibs. force) (psi) FRACTURE TYPE REMARKS 1 1 9/10/98 7 6.00 28.27 70170 2480 UNBONDED CAP i 2 10/01/98 28 1 3 10/01/98 28 ADDITIONAL COMMENTS: LOCATION OF PLACEMENT: section of street looking west. Technician: CME Division Report Distribution: (1 I ABCON CONSTRUCTION ~ ~~ m city of co..en M TEC L(2~/S INC. /CME Di~is:~ Our ietters and reports are for the exclusive use of the client ~o whom they are addressed and shall no~ be reDroduced exceDz in