Loading...
SC-Coppell HS-CS 920512SHW Group Inc May12,1992 Mr. Wilburn Echols, Jr.,Superintendent Coppelllndependent School District 200 S. Denton Tap Road CoppelI, Texas 75019 RE: Coppell High School Dear Mr. Echols: Enclosed please find letters from K. A. Sparks Contractor and his subcontractor referencing the costs of the work to be done in the City easements. This amount is $3,977.00 for this project. The City requires a fee of 2% of the cost of the construction in the easements for their inspection fee. Please issue a check to the City of Coppell in the amount of $79.54 for this requirement. If you could execute this check as soon as possible, the contractor may continue to work without any adjustments in scheduling. Please send a copy of the attached letters from the contractors along with your check to verify the costs. Should you have any questions, please do not hesitate to call. Sincerely, SHW Group, Inc. Michael L. Elmore Senior Associate ME/kc Enclosures 550 0700 Fax (214) 518-1217 CCN'i-i ACI CI . ISC P.O. BOX 869 HAMILTON, TEXAS 76531 817-386-3181 May 5, 1992 Mr. Mike Elmore S H W Group, Inc. P.O. Box 619087 Dallas, Texas 75261 RE: Coppell High School 1992 Additions Dear Mike: The cost of the utilities which fall within the city's easement is $3,977.00. Trusting this is the information you need. Sincerely, K.A. Sparks Contractor, Inc. J~m Schooler President JS/3s Attachment ,~,~-i~ PLUMBING ,~ AIR CONDITIONING, INC. 39,01 SAN JACINTO PHONE 826-6507 DALLAS, TEXAS 75204 TO: Mr. Jim Schooler President K. A. Sparks Contractors, Inc. FROM: Doug Saffell President Saffell Plumbing Co., ]nc. DATE: May 5, 1992 SUBJECT: COST OF WORK ON CITY MAINS/COPPELL HIGH SCHOOL Dear Jim~ lhls letter is to ~dvise you that the cost of performing work on the 8" water mains within the city easement at the Coppell High School Project will come to a total of $3,977.00. Please contact me with any questions concerning this price.