Loading...
SC-Coppell HS-CS 920402SHW group Inc April 2, 1992 Mr. Ken Griffin Department of Engineering City of Coppell P. O. Box 478 Coppell, Texas 75019 RE: CoppeA High School Addition Engineering Drawings Dear Ken: Attached are three (3) corrected copies of the engineering drawing submittal as re- quested. These drawings reflect the following changes: 1. The corrected final plat is attached to these sets. 2. The lawn irrigation meter is attached to the water line before the detector check. Sheet 8.0 has been revised to reflect this. I have talked to Howard Pafford and he indicated that that is the correct way to do this. Ken, I have returned the redmarked set as well as the three corrected sets. I would greatly appreciate your quick re- review and approval of these drawings as soon as pos- sible as the contractor is ready to go to work on these items. Thanks for your assistance in this matter, and if you can call me at 550 -0700 when the sets can be picked up, I will come over and get them. Should you have any questions, please do not hesitate to call. Sincerely, SHWC, Inc. Michael L. Elmore Senior Associate M E /kc Attachments