Loading...
SC-Coppell HS-CS 910418 Spaw-G ass April 18, 1991 SHWC, Inc. P.O. Box 619087 Dallas, Texas 75261 ATTN: Mike Elmore REF: COPPELL HIGH SCHOOL FINAL CERTIFICATE OF OCCUPANCY Spaw-G lass Inc. 2120 Walnut Hiil Lane Suite 100 irving, TX 75038 214 580-2855 Fax 214 518-I163 Dear Mike: This letter is to document my April 17, 199i telephone conversation with the City of Coppell's construction inspector, Mr. Larry Davis. According to Mr. Davis, the final -changc ordar on °th'e above referenced project could not be issued until all outstanding final requirements are met. The requirements are as follows: 1) A 12 month maintenance bond on utility installation at city easement and right-of-way. Bond should be active from date of final acceptance by the city for a duration of 1 year. 2) As-built of all Civil Drawings (1 sepia and 2 blueline copies). As you are aware, Spaw-Glass was only responsible for construction of the utility lines within the private property limits to the extent of the contract, and all pertinent as-built drawings have been transmitted to SHWC to CISD for quite sometime. We are under the assumption that the above requirements are the responsibility of the Owner unless we are notified otherwise. Please request the Owner to fulfill his requirement with the City as expeditiously as possible. Our final payment is dependent on Owner's action. Should you have any questions, please do not hesitate to call. Sincerely, SPAW-GLASS INC. Reza Shirmanesh Project Engineer cc: Larry Davis Butch Kuester Pat Hilderbrand File