Loading...
SC-Coppell HS-CS 901120Jerry Parch Consulting Engineers November 20, 1990 Mr. Buddy Echols Superintendent Coppell Independent School District 1201 Wrangler Drive Coppell, Texas 75019 214/471-1111 RE: JP No. 88023; Construction of Parkway Boulevard and High School Access Road; Coppe11, Texas Dear Buddy: Enclosed is a copy of payment request ("estimate") No. 7 received from L. H. Lacy for work performed on the referenced contract from March 1, 1990 to November 15, 1990. The estimate was received by our office on November 16, 1990. The contractor is requesting payment for Item No. 9 under Paving Improvements - Bermuda Grass In Medians, which was the only item not previously paid for in this contract. The remaining retainage of 2% on previously approved construction items is also requested. Following is a summary of requested payments in the enclosed estimate. Bermuda Grass in Medians 2% Retainage Total Amount Requested 4,729.18 5,050.84 $ 9,780.02 You have advised us that the grass growth in the medians and parkway areas of Parkway Boulevard and the High School Access Road appears adequate. Therefore payment of $9,780.02 is recommended as requested. This payment will complete payments of all amounts due L. H. Lacy Company under the referenced contract. 320 VVestvvay Place, Suite 501 · Arlington, Texas 76018 · Metro (817) 467-2418 · (817) 465-0259 Mr. Buddy Echols JP No. 88023 November 20, 1990 Page 2 of 2 If you have any questions, please call. Sincerely, JP:ch Enclosure: Payment Request No. 7 from L. H. Lacy Company cc: Ms. Mary Hicks/ABQ Federal Savings Bank w/enclosure Mr. Gary Keep/SHWC Architects w/enclosure Mr. Larry Davis/City of Coppell w/enclosure Mr. Curt Oerter/L. H. Lacy Company ...... PADE 1 - RECEi?":D COPPELL iNDEPENDENT SCHOOL DiSTRiCT CIO JERRY PARCXE CONSULTIN6 ENGINEERS 320 MESTMAY PLACE, SUITE 501 ARLINGTON, TEXAS 76016 ATTN~ ~ERRY PARCHE, P.E. L. H. LACY COHPANY HDNTHLY EST]HATE NDVEflBER 1990 NOV 1 6 1990 Jefl~Pl~heConsulting ENID. DR]AiNAL CONTRACT: 256,015.16 TOIAL CHAN6E ORDERS: ' 0.00 TOTAL: 256,015.16 PERCENT CDHPLETE: 100.49! JOB NAHE: PARKMAY BOULEVARD JOB NUHBER= 344 EST]HATE 4:07 & FINAL.( REV]SED) CUSTDNER NUNBER: 21027 NOVEHBER 15, 1990 PROJECT HONTHLY MORK TOTAL MORK CONTRACT MONTHLY TOTAL HEN UNIT EST. DUANTITY ON CONTRACT DN CONTRACT UNiT PRICE AHOUNT AHOUNT PART A NATER SYSTEH 1. 16' DUCTILE IRON PIPE LF 916.00 0.00 916.00 26,00 0.00 2. B' PVC NATER LF 766.00 0.00 766.00 14.00 0.00 3, 16" BUTTERFLY VALVE EA 3.00 0.00 3.00 4,8BB.O0 0.00 4, 8" Ha 6ATE VALVE EA 4.00 0.00 4.00 390.00 0.00 5. 8" FLNBED H~ 6ATE VALVE EA 5.00 0.00 5.00 390.00 0.00 6. 6" BATE VALVE EA 4.00 0.00 4,00 291,00 0.00 7, FIRE HYDRANTS EA 4.00 0.00 q,O0 99B,00 0,00 B. 42" RCCP LF 66.00 0.00 66,00 50.00 0.00 9. DUCTILE IRON FITTINAS TN 4,40 0.00 4,40 3,120,00 0.00 10. RHV PLUO & CONN TO EXIST MATER EA 2.00 0.00 2.00 260.00 0,00 11. 2' NATER SERVICE EA 1.00 0.00 1,00 J,672,00 0,00 12. TRENCH SAFETY LS 1.00 O.O0 1.00 104.00 0.00 13. 2" HETER SETTER ER 1.00 0.00 1.00 410.00 0.00 tOTAL PART A 23 816.00 10 724.00 14 664.00 I 560.00 ! 950.00 I 164,00 3 992.00 3 300.00 13 728.00 520.00 1,B72.00 104.00 410.00 0.00 77,804.00 PART B SE~ER SYSTEH 1. B' SEWER O' TO 6' DEEP LF 2. 8" SE#ER 6' TO 8' DEEP LF 3. 8" SEMER B' TO 10' DEEP LF 4. B" SE~ER 10' TO 12' DE£? LF 5. 4' HRNHOLES EA 6. 4' HANHOLE (EXTRA DEPTH ) 6') LF 7. 4' HA~HDLE ON EXIST 2A' SE~ER EA 0. 2000 PS] COHCRETE ENCASEHENT CY ~. T~£HCH SAFETY LS PART S 0.00 23.00 1,048.00 373.00 6.00 23.00 1.00 3.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 23.00 1,068.00 373.00 6.00 23.00 1.00 3.00 1.00 9.00 9.00 10.80 11.00 B32.00 104.00 1,560,00 94.00 520.00 0.00 0.00 0.00 207.00 0.00 11,534.40 0.00 4,103.00 0.00 4,992.00 0.00 2,392.00 0.00 1,560.00 0.00 282.00 0.00 520.00 0.00 25,5?0.40 DRRINASE IHPRDVEHENTS 1. 36' RCP 2. 30' RCP 3, 27' 4, 24' RCP 5. 21" RCP 6. lB" RCP 7. TND 30' HEADMALL B, 20' REC CURB INLET LF LF LF LF LF EA EA EA 0.00 75.00 70.00 68.00 121.00 40.00 1.00 1.00 0.00 0.00 O.O0 0.00 0.00 0.00 0.00 0.00 0.00 75.00 70.00 68.00 12i.00 40.00 1.O0 1.00 45.00 34.00 29.00 25.00 22.00 19.00 395.00 3,536.00 0.00 0.00 0.00 2,550.00 0.00 2,030.00 0.00 1~700.00 0.00 2,662.00 0.00 7&O.O0 0,00 395.00 0.00 3,536,00 PA6E 2 CDPPELL INDEPENDENT SCHOOL DISTRICT C/O JERRY PARCHE CONSULTING ENGINEERS 320 NESTNAY PLACE, SUITE 50! ARt.]NSTON, TEXAS 76018 ATTN= JERRY PARCHE, P.E. L. H. LACY COHPANY HONTHLY EST]HATE NOVEHBER 1990 ORI6]NAL CONTRACT: 256,015.16 TOTAL CHAN6E ORDERSL 0.00 TOTAL: 256,0J5.1& PERCENT CDHPLETE= 100.q9l JOB NAHE: PARKWAY BOULEVARD JOB NUMBER~ 344 EST]HATE i= 07 & FINAL ( REVISED ) CUSTOHER NUHBER: 2!027 NOVEHDER 15, 1990 PROJECT HONTHLY ~ORK TOTAL WORK CONTRACT HDNTHLY TOTAL ITEH UNIT EST. DUANTITY DN CONTRACT ON CONTRACT UNIT PR]CE AHOUNT ANOONT 9. 14' REC CURB INLET EA 2.00 0.00 2.00 2~75.00 0.00 q,950.00 I0. 6' REC CURB INLET EA 2.00 0.00 2.00 1,061.00 0.00 2,122.00 11. TRENCH S~FETY LS l.O0 0.00 1.00 104.00 0.00 104.00 TOTAL PART C 0.00 20,O09.00 PAVIN6 IHPROVEHENTS 1. 7' 3000 PSI CONCRETE PAVEMENT SY 4~518.00 0.00 4,518.00 1~.20 0.00 6~,155.60 2. 7' ~000 PSI OR 6' 650 FLEX PVHT SY 2,6~.00 0.00 2,693.00 14.20 0.00 ~S,240.60 3. LIME IN 90.00 0.00 86.30 65.00 0.00 5,607.50 4. LI~E SUBBRADE SY 7,503.00 0.00 7,503.00 0.90 0.00 6,752.70 5. )lEADER LF 128.00 0.00 128.00 2.00 0.00 256.00 6. STREET BARRICADE LF 66.00 0.00 66.00 15.00 0.00 990.00 7. CONCRETE PAVINB STONES SF 1,602.10 0.00 1,602.10 2.90 0.00 4,4~5.BB 8. WIRE FENCING LF 2~503.00 0.00 2,503.00 2.60 0.00 6,507.B0 9. DER~UDA GRASS IN HEDIANS AC 1.79 1.79 1.79 2,642.00 4~729.18 (,729.18 10. 2' PVC CONDUIT LF 235.00 0.00 ~05.00 2.00 0.00 810.00 11, TRANSITION BUTTONS LS 1.00 0.00 1.00 530.~0 0.00 530.40 TOTAL PART D 4,729.18 133,067.66 TOTAL AMOUNT OF WORK PERFDRHD LESS 2~ REIAIHAGE NET AMUUNT PAYABLE ON CONTRACT LESS: SPECIAL DEDUCTIONS PLUS~ EX)RA WORK NET A~OUNT ~UE DH PROJECT LESS PAYHENTS RECEIVED lO DAlE CURRENT A,DUNT DUE ON PROJECt AHOUNTS UNPAD FROH PRIOR ESTIMAlES AHOUNIS DUE FRDH CURRENT ESTIMATE CURBENT AHDUNT DUE I. H. LACY COMPANY 4,729.1B 257,271.06 0.00 257~271,06 O,O0 0,00 2~7~271,06 9,7~0.02 0.00 9,780.02 9,780.02 PA6E 3 COPPELL INDEPENDENT SCHOOL DISTRICT CIO JERRY PARCHE CDNSULTIN6 ENGINEERS 320 #ESTNAY PLACE, SUITE 501 ARLINGTON, TEXAS 76018 ATTN) JERRY PARCHE, P.E. L. H. LACY COMPANY MONTHLY EST]MATE NOVEMBER 1990 DR]6]NAL CONTRACT: 256~015.J6 TOTAL CHANGE ORDERS: 0.00 TOTAL: 256,015.16 PERCENT COMPLETE: lO0.49Z JOB NAME: PARKNAY BOULEVARD JOB NUHBER: 344 EST]MATE i: 07 & FINAL ( REVZSED ) CUSTOMER NUMBER: 2]027 NOVEMBER ~5~ ~0 PROJECT HONTHLY NORK TOTAL NORK CONTRACT MONTHLY TOTAL ]TEH UNIT EST. OUANT]TY ON CONTRACT DN CONTRACT UNIT PR]CE AHD~NT AHOUNT PLEASE DIRECT ANY DUEST]DNS DR CORRESPNDENCE CONCERN]NS THIS PROGRESS ESTiNATE TO: L. H. LACY COMPANY 10988 SHADY TRAIL P.O. BOX 5qJ2~7 DALLAS~ TEXAS 75354-12~7 (214) 357-0146 ATTNA CURT OERTER PROJECT ADMINISTRATOR