SC-Coppell HS-CS 901120Jerry Parch Consulting Engineers
November 20, 1990
Mr. Buddy Echols
Superintendent
Coppell Independent School District
1201 Wrangler Drive
Coppell, Texas 75019
214/471-1111
RE:
JP No. 88023; Construction of Parkway Boulevard and
High School Access Road; Coppe11, Texas
Dear Buddy:
Enclosed is a copy of payment request ("estimate") No. 7 received
from L. H. Lacy for work performed on the referenced contract from
March 1, 1990 to November 15, 1990. The estimate was received by
our office on November 16, 1990.
The contractor is requesting payment for Item No. 9 under Paving
Improvements - Bermuda Grass In Medians, which was the only item
not previously paid for in this contract. The remaining retainage
of 2% on previously approved construction items is also requested.
Following is a summary of requested payments in the enclosed
estimate.
Bermuda Grass in Medians
2% Retainage
Total Amount Requested
4,729.18
5,050.84
$ 9,780.02
You have advised us that the grass growth in the medians and
parkway areas of Parkway Boulevard and the High School Access Road
appears adequate. Therefore payment of $9,780.02 is recommended as
requested.
This payment will complete payments of all amounts due L. H. Lacy
Company under the referenced contract.
320 VVestvvay Place, Suite 501 · Arlington, Texas 76018 · Metro (817) 467-2418 · (817) 465-0259
Mr. Buddy Echols
JP No. 88023
November 20, 1990
Page 2 of 2
If you have any questions, please call.
Sincerely,
JP:ch
Enclosure: Payment Request No. 7 from L. H. Lacy Company
cc:
Ms. Mary Hicks/ABQ Federal Savings Bank w/enclosure
Mr. Gary Keep/SHWC Architects w/enclosure
Mr. Larry Davis/City of Coppell w/enclosure
Mr. Curt Oerter/L. H. Lacy Company
...... PADE 1
- RECEi?":D
COPPELL iNDEPENDENT SCHOOL DiSTRiCT
CIO JERRY PARCXE CONSULTIN6 ENGINEERS
320 MESTMAY PLACE, SUITE 501
ARLINGTON, TEXAS 76016
ATTN~ ~ERRY PARCHE, P.E.
L. H. LACY COHPANY
HDNTHLY EST]HATE
NDVEflBER 1990
NOV 1 6 1990
Jefl~Pl~heConsulting ENID.
DR]AiNAL CONTRACT: 256,015.16
TOIAL CHAN6E ORDERS: ' 0.00
TOTAL: 256,015.16
PERCENT CDHPLETE: 100.49!
JOB NAHE: PARKMAY BOULEVARD
JOB NUHBER= 344 EST]HATE 4:07 & FINAL.( REV]SED)
CUSTDNER NUNBER: 21027 NOVEHBER 15, 1990
PROJECT HONTHLY MORK TOTAL MORK CONTRACT MONTHLY TOTAL
HEN UNIT EST. DUANTITY ON CONTRACT DN CONTRACT UNiT PRICE AHOUNT AHOUNT
PART A NATER SYSTEH
1. 16' DUCTILE IRON PIPE LF 916.00 0.00 916.00 26,00 0.00
2. B' PVC NATER LF 766.00 0.00 766.00 14.00 0.00
3, 16" BUTTERFLY VALVE EA 3.00 0.00 3.00 4,8BB.O0 0.00
4, 8" Ha 6ATE VALVE EA 4.00 0.00 4.00 390.00 0.00
5. 8" FLNBED H~ 6ATE VALVE EA 5.00 0.00 5.00 390.00 0.00
6. 6" BATE VALVE EA 4.00 0.00 4,00 291,00 0.00
7, FIRE HYDRANTS EA 4.00 0.00 q,O0 99B,00 0,00
B. 42" RCCP LF 66.00 0.00 66,00 50.00 0.00
9. DUCTILE IRON FITTINAS TN 4,40 0.00 4,40 3,120,00 0.00
10. RHV PLUO & CONN TO EXIST MATER EA 2.00 0.00 2.00 260.00 0,00
11. 2' NATER SERVICE EA 1.00 0.00 1,00 J,672,00 0,00
12. TRENCH SAFETY LS 1.00 O.O0 1.00 104.00 0.00
13. 2" HETER SETTER ER 1.00 0.00 1.00 410.00 0.00
tOTAL PART A
23 816.00
10 724.00
14 664.00
I 560.00
! 950.00
I 164,00
3 992.00
3 300.00
13 728.00
520.00
1,B72.00
104.00
410.00
0.00 77,804.00
PART B SE~ER SYSTEH
1. B' SEWER O' TO 6' DEEP LF
2. 8" SE#ER 6' TO 8' DEEP LF
3. 8" SEMER B' TO 10' DEEP LF
4. B" SE~ER 10' TO 12' DE£? LF
5. 4' HRNHOLES EA
6. 4' HANHOLE (EXTRA DEPTH ) 6') LF
7. 4' HA~HDLE ON EXIST 2A' SE~ER EA
0. 2000 PS] COHCRETE ENCASEHENT CY
~. T~£HCH SAFETY LS
PART S
0.00
23.00
1,048.00
373.00
6.00
23.00
1.00
3.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
23.00
1,068.00
373.00
6.00
23.00
1.00
3.00
1.00
9.00
9.00
10.80
11.00
B32.00
104.00
1,560,00
94.00
520.00
0.00 0.00
0.00 207.00
0.00 11,534.40
0.00 4,103.00
0.00 4,992.00
0.00 2,392.00
0.00 1,560.00
0.00 282.00
0.00 520.00
0.00 25,5?0.40
DRRINASE IHPRDVEHENTS
1. 36' RCP
2. 30' RCP
3, 27'
4, 24' RCP
5. 21" RCP
6. lB" RCP
7. TND 30' HEADMALL
B, 20' REC CURB INLET
LF
LF
LF
LF
LF
EA
EA
EA
0.00
75.00
70.00
68.00
121.00
40.00
1.00
1.00
0.00
0.00
O.O0
0.00
0.00
0.00
0.00
0.00
0.00
75.00
70.00
68.00
12i.00
40.00
1.O0
1.00
45.00
34.00
29.00
25.00
22.00
19.00
395.00
3,536.00
0.00 0.00
0.00 2,550.00
0.00 2,030.00
0.00 1~700.00
0.00 2,662.00
0.00 7&O.O0
0,00 395.00
0.00 3,536,00
PA6E 2
CDPPELL INDEPENDENT SCHOOL DISTRICT
C/O JERRY PARCHE CONSULTING ENGINEERS
320 NESTNAY PLACE, SUITE 50!
ARt.]NSTON, TEXAS 76018
ATTN= JERRY PARCHE, P.E.
L. H. LACY COHPANY
HONTHLY EST]HATE
NOVEHBER 1990
ORI6]NAL CONTRACT: 256,015.16
TOTAL CHAN6E ORDERSL 0.00
TOTAL: 256,0J5.1&
PERCENT CDHPLETE= 100.q9l
JOB NAHE: PARKWAY BOULEVARD
JOB NUMBER~ 344 EST]HATE i= 07 & FINAL ( REVISED )
CUSTOHER NUHBER: 2!027 NOVEHDER 15, 1990
PROJECT HONTHLY ~ORK TOTAL WORK CONTRACT HDNTHLY TOTAL
ITEH UNIT EST. DUANTITY DN CONTRACT ON CONTRACT UNIT PR]CE AHOUNT ANOONT
9. 14' REC CURB INLET EA 2.00 0.00 2.00 2~75.00 0.00 q,950.00
I0. 6' REC CURB INLET EA 2.00 0.00 2.00 1,061.00 0.00 2,122.00
11. TRENCH S~FETY LS l.O0 0.00 1.00 104.00 0.00 104.00
TOTAL PART C 0.00 20,O09.00
PAVIN6 IHPROVEHENTS
1. 7' 3000 PSI CONCRETE PAVEMENT SY 4~518.00 0.00 4,518.00 1~.20 0.00 6~,155.60
2. 7' ~000 PSI OR 6' 650 FLEX PVHT SY 2,6~.00 0.00 2,693.00 14.20 0.00 ~S,240.60
3. LIME IN 90.00 0.00 86.30 65.00 0.00 5,607.50
4. LI~E SUBBRADE SY 7,503.00 0.00 7,503.00 0.90 0.00 6,752.70
5. )lEADER LF 128.00 0.00 128.00 2.00 0.00 256.00
6. STREET BARRICADE LF 66.00 0.00 66.00 15.00 0.00 990.00
7. CONCRETE PAVINB STONES SF 1,602.10 0.00 1,602.10 2.90 0.00 4,4~5.BB
8. WIRE FENCING LF 2~503.00 0.00 2,503.00 2.60 0.00 6,507.B0
9. DER~UDA GRASS IN HEDIANS AC 1.79 1.79 1.79 2,642.00 4~729.18 (,729.18
10. 2' PVC CONDUIT LF 235.00 0.00 ~05.00 2.00 0.00 810.00
11, TRANSITION BUTTONS LS 1.00 0.00 1.00 530.~0 0.00 530.40
TOTAL PART D
4,729.18 133,067.66
TOTAL AMOUNT OF WORK PERFDRHD
LESS 2~ REIAIHAGE
NET AMUUNT PAYABLE ON CONTRACT
LESS: SPECIAL DEDUCTIONS
PLUS~ EX)RA WORK
NET A~OUNT ~UE DH PROJECT
LESS PAYHENTS RECEIVED lO DAlE
CURRENT A,DUNT DUE ON PROJECt
AHOUNTS UNPAD FROH PRIOR ESTIMAlES
AHOUNIS DUE FRDH CURRENT ESTIMATE
CURBENT AHDUNT DUE I. H. LACY COMPANY
4,729.1B
257,271.06
0.00
257~271,06
O,O0
0,00
2~7~271,06
9,7~0.02
0.00
9,780.02
9,780.02
PA6E 3
COPPELL INDEPENDENT SCHOOL DISTRICT
CIO JERRY PARCHE CDNSULTIN6 ENGINEERS
320 #ESTNAY PLACE, SUITE 501
ARLINGTON, TEXAS 76018
ATTN) JERRY PARCHE, P.E.
L. H. LACY COMPANY
MONTHLY EST]MATE
NOVEMBER 1990
DR]6]NAL CONTRACT: 256~015.J6
TOTAL CHANGE ORDERS: 0.00
TOTAL: 256,015.16
PERCENT COMPLETE: lO0.49Z
JOB NAME: PARKNAY BOULEVARD
JOB NUHBER: 344 EST]MATE i: 07 & FINAL ( REVZSED )
CUSTOMER NUMBER: 2]027 NOVEMBER ~5~ ~0
PROJECT HONTHLY NORK TOTAL NORK CONTRACT MONTHLY TOTAL
]TEH UNIT EST. OUANT]TY ON CONTRACT DN CONTRACT UNIT PR]CE AHD~NT AHOUNT
PLEASE DIRECT ANY DUEST]DNS DR CORRESPNDENCE CONCERN]NS THIS PROGRESS ESTiNATE TO:
L. H. LACY COMPANY
10988 SHADY TRAIL
P.O. BOX 5qJ2~7
DALLAS~ TEXAS 75354-12~7
(214) 357-0146
ATTNA CURT OERTER
PROJECT ADMINISTRATOR