St Ann Catholic-LR010103CONCRETE COMPR 3SIVE STRENGTH TEoI'
a division of~tl-~l~rl
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 12/01/2000 Report No.: 0031293 Report Date
01/03/2001
Client No.: 2310 Project No.: 94001152
Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church
Attn: Monsignor Kilian Broderick 180 Samuel Boulevard
180 Samuel Boulevard
Coppell TX 75019 Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: Centex Construction MIX I.D.: 8205
CONCRETE SUPPLIER: TXI PLACEMENT DATE: 12/01/2000 BATCH TrME: 5:00am
PLANT: 41 TIME SAMPLED: 5:35am BY: Ervin Fan-is
SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cloudy
STRENGTH: 4000 psi @ 28 Days TEMPERATURE (F)- AIR 49 g CONCRETE: 63 F
SLUMP: 5.0" max TRUCK NO: 640 TICKET NO: 2786370
AIR: 3-6% AIR CONTENT (%): 3.9 UNIT WEIGHT (pcf): N/A
TEST METHOD: ASTM C- 143 PLACV, SmNT LOCATION:
Structural slab meeting rooms I to 3- B to R & fountain on Line 4
ASTM C-172
ASTM C-39
SAMPLE LOCATION: 1.5-C
REPORT OF TESTS ACCUI fULATIVE YARDS: 30
CYLINDER MEASURED MAXIMU31 COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
1 1 4.75 12/08/2000 7 108280 3830
1 2 4.75 12/08/2000 7 114500 4050
Average 3940
I 3 4.75 1 2/29/2000 28 154350 5460
1 4 4.75 12/29/2000 28 151780 5370
Average 5420
Technician:Report Distribution:Ervin Farfis Started: 4:30am Finished: 9:30am ~~Inc.
(1) St. Ann's Catholic Community (1) Datum Engineering, Inc.
(I) Centex Construction (1) City of Coppell Eric J. Cleveland, P.E.
(I) City of Coppell Senior Project Engineer
(1) Alliance Architects
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
0ILL Page 1 of 1