Loading...
St Ann Catholic-LR010103CONCRETE COMPR 3SIVE STRENGTH TEoI' a division of~tl-~l~rl 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 12/01/2000 Report No.: 0031293 Report Date 01/03/2001 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Centex Construction MIX I.D.: 8205 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 12/01/2000 BATCH TrME: 5:00am PLANT: 41 TIME SAMPLED: 5:35am BY: Ervin Fan-is SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cloudy STRENGTH: 4000 psi @ 28 Days TEMPERATURE (F)- AIR 49 g CONCRETE: 63 F SLUMP: 5.0" max TRUCK NO: 640 TICKET NO: 2786370 AIR: 3-6% AIR CONTENT (%): 3.9 UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C- 143 PLACV, SmNT LOCATION: Structural slab meeting rooms I to 3- B to R & fountain on Line 4 ASTM C-172 ASTM C-39 SAMPLE LOCATION: 1.5-C REPORT OF TESTS ACCUI fULATIVE YARDS: 30 CYLINDER MEASURED MAXIMU31 COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 4.75 12/08/2000 7 108280 3830 1 2 4.75 12/08/2000 7 114500 4050 Average 3940 I 3 4.75 1 2/29/2000 28 154350 5460 1 4 4.75 12/29/2000 28 151780 5370 Average 5420 Technician:Report Distribution:Ervin Farfis Started: 4:30am Finished: 9:30am ~~Inc. (1) St. Ann's Catholic Community (1) Datum Engineering, Inc. (I) Centex Construction (1) City of Coppell Eric J. Cleveland, P.E. (I) City of Coppell Senior Project Engineer (1) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 1 of 1