Loading...
St Ann Catholic-LR010102CONCRETE COMPR _3SIVE STRENGTH TEL £ a division of']F~-d~lrl 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 12/20/2000 Report No.: 0033041 Report Date 01/02/2001 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Centex Construction MIX I.D.: 9507 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 12/20/2000 BATCIt TIME: 1:30pm PLANT: 42 TIME SAMPLED: 2:32pm aY: Roy Montgomery SPECIFICATION REQUIREMENTS WEATiIER CONDITIONS: Clear, windy STRENGth: 4000 psi @ 28 Days TEMPERATURE (F)- AIR 5 8 F CONCRETE: 64 F SLt~fP: 3-5" TRUCK NO: 107 TICKET NO: 2798865 AIR: N/A AIR CO1N'TENT (%): N/A UNIT WEIGIIT (pcf): N/A TEST METHOD: ASTM C- 143 PLACEMEN'r LOCATION: Ground Level, Columns M/19. F/19, E/19 and D/19 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: See placement location REPORT OF TESTS ACCUMULATIVE YARDS: 10 CYLINDER MEASURED I~LAXI~-IUM COMPRESSIVE MARKED SLUI~{P DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 5.50 12/27/2000 7 121040 4280 1 2 5.50 12/27/2000 7 117290 4150 Average ~1220 1 3 5.50 01/17/2001 28 1 4 5.50 01/17/2001 28 Technician: Roy Montgomery Started: l:00pm Finished: 3:30pm Report Distribution: ng, Inc. (1) St. Ann's Catholic Community (I) Datum Engineering, Inc. (I) Centex Construction (1) City of Coppell c J. Cleveland, P.E. (1) City of Coppell Senior Project Engineer (I) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01SS Page 1 of I