St Ann Catholic-LR010102CONCRETE COMPR _3SIVE STRENGTH TEL £
a division of']F~-d~lrl
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 12/20/2000 Report No.: 0033041 Report Date
01/02/2001
Client No.: 2310 Project No.: 94001152
Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church
Attn: Monsignor Kilian Broderick 180 Samuel Boulevard
180 Samuel Boulevard
Coppell TX 75019 Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: Centex Construction MIX I.D.: 9507
CONCRETE SUPPLIER: TXI PLACEMENT DATE: 12/20/2000 BATCIt TIME: 1:30pm
PLANT: 42 TIME SAMPLED: 2:32pm aY: Roy Montgomery
SPECIFICATION REQUIREMENTS WEATiIER CONDITIONS: Clear, windy
STRENGth: 4000 psi @ 28 Days TEMPERATURE (F)- AIR 5 8 F CONCRETE: 64 F
SLt~fP: 3-5" TRUCK NO: 107 TICKET NO: 2798865
AIR: N/A AIR CO1N'TENT (%): N/A UNIT WEIGIIT (pcf): N/A
TEST METHOD: ASTM C- 143 PLACEMEN'r LOCATION:
Ground Level, Columns M/19. F/19, E/19 and D/19
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: See placement location
REPORT OF TESTS ACCUMULATIVE YARDS: 10
CYLINDER MEASURED I~LAXI~-IUM COMPRESSIVE
MARKED SLUI~{P DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
1 1 5.50 12/27/2000 7 121040 4280
1 2 5.50 12/27/2000 7 117290 4150
Average ~1220
1 3 5.50 01/17/2001 28
1 4 5.50 01/17/2001 28
Technician: Roy Montgomery Started: l:00pm Finished: 3:30pm
Report Distribution: ng, Inc.
(1) St. Ann's Catholic Community (I) Datum Engineering, Inc.
(I) Centex Construction (1) City of Coppell
c J. Cleveland, P.E.
(1) City of Coppell Senior Project Engineer
(I) Alliance Architects
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
01SS Page 1 of I