Loading...
St Ann Catholic-LR001227CONCRETE COMPRESSIVE STRENGTH TE.'-"r ENGLNEEI~NG, INC. a division of'l~l~g:l:gl 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 12/15/2000 Report No.: 0032614 Report Date 10_/27/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Centex Construction MIX I.D.: 8205 CONCRETE SUPPLIER: TXI PLACEMENT DATE: ! 2/15/2000 BATCH TIME: 9: 14am PLANT: 41 TIME SAMPLED: 9:55am BY: Ervin Farris SPECIFICATION REQUIREMENTS WEATHER CO.X~ITIONS: Cloudy STRENGTH: 4000 psi @ 28 Days TEMPEgnTURE ~F) - AIR 44 F CONCRETE: 63 F SL~,*IP: 5.0" Max TRVC~ NO: 644 TLCKET NO: 2795004 AIR: 3-6% AIR CONTENT (%): 3.8 UNIT WEIGIIT (pc0: N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Switch-back ramp east of A-I line to courtyard ASTM C-172 ASTM C-39 SAMPLE LOCATION: Area above first lift REPORT OF TESTS ACCUMULATIVE YARDS: 10 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLL~'IP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE I I 6.50 12/22/2000 7 99010 3500 1 2 6.50 12/22/2000 7 96680 3420 Average 3460 I 3 6.50 01/12/2001 28 I 4 6.50 01/12/2001 28 Technician: Ervin Fan'is Started: 8:30am Finished: 12:00pm ~Jg~ Report Distribution: Inc. (I) St. Ann's Catholic Community ( I ) Datum Engineering, Inc. (1) Centex Construction (!) City of Coppell [. Cleveland, P.E. (1) City of Coppell Senior Project Engineer (I) Alliance Architects This report is exclusively for the usc of thc client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 1 of 1