Loading...
St Ann Catholic-LR001212CONCRETE COMPRV SIVE STRENGTH TE? ENGINEERING, a division of 8901 Carpenter Fr~.'., Suite #100 Dalla% Texas 7~247 Date of Service: 12/01/2000 Report No.: 0031293 Report Date 12/12/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Brod6rick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at thc placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONT~,~CrOR: Centex Construction s;Ix i.rz: 8205 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 12/01/2000 BATCti TreE: 5:00am PLA. NT: 41 IIMESA.MPLED: 5:35am m': Ervin Farris SPECIFICATION REQUIREMENTS WEATilER CONDITIONS: Cloudy STRENgTh: 4000 psi '~: 28 Days TEMPE~n'rCm~ (~-Am 49 ~ coNc~x~: 63 SLt~MP: 5.0" m~x TRUCK NO: 640 X~C~ET TO: 2786370 Am: 3-6% Am ~X~T (%): 3.9 t'~rr xx'r:l~a'r (~0: N/A TEST M~T~lOO: ASTM C- 143 PLACEMENT I.~ATiON: S~ctural slab me~ing r~ 1 to 3- B lo R & l~unlain on I .hie 4 ASTM C- 172 ASTM C-39 S.~M PLE I,(~:ATION: 1.5-C REPORT OF TESTS ACCUMULATIVE YARDS: 30 CYLINDER MEASURED M.~XI.MUM COMPRESSIVE .~LMIKED SLUMP DATE AGE IA)AD STRENGTII FI~XCFURE SET NO. (inches) TES~FED (days) (lbs. force) (psi) TYPE I I 4.75 12/08/2000 7 108280 3830 I 2 4.75 12/08/2000 7 114500 4050 Average 3940 I 3 4.75 12/29/2000 28 I 4 4.75 12/29/2000 28 ReportTechnician: Ervin Farris Distribution: Started: 4:30am Finished: 9:3Oam ~~tg, lnc. (1) st. Aan's Catholic Communit2y (1) Datum Engineering. Inc. (1) Centex Construction (1) CiW of Coppell Eric J. Cleveland, P.E. ( 1 ) ciD, of Coppell Senior t'roject Engineer (I) Alliance Arehiteots This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the v~witlen approval of HBC Engineering, Inc. 0ILL Page I of I · 'CONCRETE COMP[x SSIVE STRENGTH r a division of]~lJal~ 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 11/10/2000 Report No.: 0029425 Report Date 12/12/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Centex Construction MIX I.D.: 8205 CONCRETE SUPPLIER: TXI PLACEMEN~F DATE: 11/10/2000 aATCH TIME: 10:36am PLANT: 41 TIME SAMPLED: 12:15pm aY: Albert Garcia SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cloudy STRENGTH: 4000 psi @ 28 Days TES-~v. RA~JRE (F)- AIR 60 F CONCRETE: 60 F SLU~blP: 5.0" Max TRUCK NO: 451 TICKET NO: 2774854 AIR: 3-6% AIR CONTENT (%): 4.6 UNIT WEIGItT (pcB: N/A TEST METHOD: ASTM C-143 PLACEMENT LOCATION: Grade Beams ASTM C-172 See attached sketch. ASTM C-39 SAMPLE LOCATION: See placement location REPORT OF TESTS ACCUI¥1ULATIVE YARDS: 10 CYLIN~)ER MEASURED .MA XI~IIV~,I COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 6.00 11/17/2000 7 79200 2800 1 2 6.00 11/17/2000 7 §7350 3090 Average 2950 I 3 6.00 12/08/2000 28 112870 3990 1 4 6.00 12/08/2000 28 115710 4090 Average 4040 Technician: Albert Garcia Started: l l:30am Finished: l:30pm Report Distribution: :ring, Inc. (1) St. Ann's Catholic Community (1) Datum Engineering, Inc. (1) Centex Construction ( I ) Ci~' of Coppell Eric J. C e~eland, P.E. (I) City of Coppell Senior Project Engineer (1) Alliance Architects This report is exclusively for the usc of the client indicated above and shall not be reproduced except in full without thc written approval of HBC En~neering. Inc. 01LL Page I of I ........ m ................ ................... _. ..... ....................... ..................................... ................................. r....,~.~.~ ......................... ~ ~...~ .............................