St Ann Catholic-LR001129CONCRETE COMPK_.,SSIVE STRENGTH TE , F
a division
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 10/27/2000 Report No.: 0028095 Report Date
11/29/2000
Client No.: 2310 Project No.: 94001152
Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church
Attn: Monsignor Kilian Broderick 180 Samuel Boulevard
180 Samuel Boulevard
Coppell TX 75019 Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: Centex Construction MIX i.D.: N/A
CONCRETE SUPPLIER: TXI PLACEMENT DATE: 10/27/2000 BATCH TI3IE: 11:00am
PLANT: 38 TIME SAMPLED: 11:50am BY: Shane Spinks
SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Partly cloudy, warm
STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F) - AIR N/A F CONCRETE: N/A r
SLUMe: 3-5" TRUCK NO: N/A TICKET NO: N/A
AIR: N/A AIR CONTENT (%): 1.8 UNIT WEIGIIT (pcf): N/A
TEST METHOD: ASTM C- 143 PLACEMENT LOCATION:
Pier information and technician time: See Report #0028094
ASTM C-172
ASTM C-39
SAMPLE LOCATION: B-2, C-2, D-2
REPORT OF TESTS ACCUMULATIVE YARDS: 10
CYLINDER MEASURED MAXI3'IU~! COMPRESSIVE
MARKED SLU3'IP DATE AGE LOAD STRENGTH FP,~.*,CTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
1 1 5.25 11/03/2000 7 112570 3980
1 2 5.25 11/03/2000 7 120250 4250
Average 4120
1 3 5.25 11/24/2000 28 158250 5600
1 4 5.25 11/24/2000 28 158260 5600
Average 5600
Technician: Shane Spinks Started: Finished:
Report Distribution: leering, Inc.
(I) St. Ann's Catholic Community ( I ) Datum Engineering, Inc.
(1 } Centex Construction (I) City of Coppell leveland, P.E.
(I) City of Coppell Senior Project Engineer
( I ) Alliance Architects
This report is exclusively for the use of the client indicated above and shall not bc reproduced except in full without the written approval of HBC Engineering, Inc.