Loading...
St Ann Catholic-LR001129CONCRETE COMPK_.,SSIVE STRENGTH TE , F a division 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 10/27/2000 Report No.: 0028095 Report Date 11/29/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Centex Construction MIX i.D.: N/A CONCRETE SUPPLIER: TXI PLACEMENT DATE: 10/27/2000 BATCH TI3IE: 11:00am PLANT: 38 TIME SAMPLED: 11:50am BY: Shane Spinks SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Partly cloudy, warm STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F) - AIR N/A F CONCRETE: N/A r SLUMe: 3-5" TRUCK NO: N/A TICKET NO: N/A AIR: N/A AIR CONTENT (%): 1.8 UNIT WEIGIIT (pcf): N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Pier information and technician time: See Report #0028094 ASTM C-172 ASTM C-39 SAMPLE LOCATION: B-2, C-2, D-2 REPORT OF TESTS ACCUMULATIVE YARDS: 10 CYLINDER MEASURED MAXI3'IU~! COMPRESSIVE MARKED SLU3'IP DATE AGE LOAD STRENGTH FP,~.*,CTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 5.25 11/03/2000 7 112570 3980 1 2 5.25 11/03/2000 7 120250 4250 Average 4120 1 3 5.25 11/24/2000 28 158250 5600 1 4 5.25 11/24/2000 28 158260 5600 Average 5600 Technician: Shane Spinks Started: Finished: Report Distribution: leering, Inc. (I) St. Ann's Catholic Community ( I ) Datum Engineering, Inc. (1 } Centex Construction (I) City of Coppell leveland, P.E. (I) City of Coppell Senior Project Engineer ( I ) Alliance Architects This report is exclusively for the use of the client indicated above and shall not bc reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page I of 1