St Ann Catholic-LR001127CONCRETE COMPR 'SSIVE STRENGTH TE. r
a division of ] ~
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 10/25/2000 Report No.: 0027870 Report Date
11/27/2000
Client No.: 2310 Project No.: 94001152
Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church
Attn: Monsignor Kilian Brodcrick 180 Samuel Boulevard
180 Samuel Boulevard
Coppell TX 75019 Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: Centex Construction MIX I.D.: 8205
CONCRETE SUPPLIER: TXI PLACEMEN"r DATE: 10/25/2000 BATCIt TIME: 10:34am
PLANT: 41 TIME SAMPLED: 1 1:25am BY: Steve Campbell
SPECIFICATION REQUIREMENTS WEATHER CONmTIONS: Cloudy
STRENI;'m: 4000 psi @ 28 Days TEMPERATURE (v)-AIR 76 F CONCRETE: 76 F
SLUMP: 5.0" Max TRUC~: NO: 70 TICIO~T NO: 2767817
AIR: N/A AIR CONTENT (%): N/A UNIT WEIGHT (pcf): N//A
TEST METHOD: ASTM C- 143 PLACEMENT LOCATION:
Grade beam for W wall 0-3.5 thru 5.5, 0.9-3.5 thru 5.5
ASTM C-172
ASTM C-39
SAMPLE LOCATION: 0-4 Grid Line
REPORT OF TESTS ACCtmrOLnTIVE YARDS: 10
CYLINDER MEASURED MAX~IUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
1 1 5.50 11/01/2000 7 96870 3430
1 2 5.50 11/01/2000 7 92890 3280
Average 3360
I 3 5.50 11/22/2000 28 122970 4350
1 4 5.50 11/22/2000 28 115960 4100
Average 4230
Technician: Steve Campbell Started: 10:30am Finished: l:30pm ~erlng, Inc.
Report Distribution:.
(1) St. Ann's Catholic Community ( 1 ) Datum Engineering, Inc.
(1) Centex Construction (1) Cits' of Coppell Cleveland, P.E.
(!) City of Coppell Senior Project Engineer
(I) Alliance Architects
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without thc written approval of HBC Engineering, Inc.
01LL Page 1 of 1