Loading...
St Ann Catholic-LR001127CONCRETE COMPR 'SSIVE STRENGTH TE. r a division of ] ~ 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 10/25/2000 Report No.: 0027870 Report Date 11/27/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Brodcrick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Centex Construction MIX I.D.: 8205 CONCRETE SUPPLIER: TXI PLACEMEN"r DATE: 10/25/2000 BATCIt TIME: 10:34am PLANT: 41 TIME SAMPLED: 1 1:25am BY: Steve Campbell SPECIFICATION REQUIREMENTS WEATHER CONmTIONS: Cloudy STRENI;'m: 4000 psi @ 28 Days TEMPERATURE (v)-AIR 76 F CONCRETE: 76 F SLUMP: 5.0" Max TRUC~: NO: 70 TICIO~T NO: 2767817 AIR: N/A AIR CONTENT (%): N/A UNIT WEIGHT (pcf): N//A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Grade beam for W wall 0-3.5 thru 5.5, 0.9-3.5 thru 5.5 ASTM C-172 ASTM C-39 SAMPLE LOCATION: 0-4 Grid Line REPORT OF TESTS ACCtmrOLnTIVE YARDS: 10 CYLINDER MEASURED MAX~IUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 5.50 11/01/2000 7 96870 3430 1 2 5.50 11/01/2000 7 92890 3280 Average 3360 I 3 5.50 11/22/2000 28 122970 4350 1 4 5.50 11/22/2000 28 115960 4100 Average 4230 Technician: Steve Campbell Started: 10:30am Finished: l:30pm ~erlng, Inc. Report Distribution:. (1) St. Ann's Catholic Community ( 1 ) Datum Engineering, Inc. (1) Centex Construction (1) Cits' of Coppell Cleveland, P.E. (!) City of Coppell Senior Project Engineer (I) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without thc written approval of HBC Engineering, Inc. 01LL Page 1 of 1