St Ann Catholic-LR001122CONCRETE COMPRE SIVE STRENGTH TES '
a division
8901 Carpenter Frwy., S~ite #100
D~a~, Texas 75247
Date of Service: 11/10/2000 Report No.: 0029425 Report Date
! 1/22/2000
Client No.: 2310 Project No.: 94001152
Client: St. Ann's Catholic Communit3' Project: St. Ann's Catholic Church
Attn: Monsignor Kilian Broderick 180 Samuel Boulevard
180 Samuel Boulevard
Coppell TX 75019 Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations: perform required field test and cast compressive
strength samples.
PROJECT DATA
CO:~TRACrOR: Centex Construction .~I~ ~,D.: 8205
CONCRETE SUPPLIER: TXI PLACEMENT DATE: 11/10/2000 BATCH TLXtE: 10:36am
PLA.~r: 41 TI.XtES.~_X~PLED: 12715pm ~x': Albe~ Garcia
SPECIHCATION REQUI~MENTS XVEATHER ~NDITIONS: Cloudy
STRENGTH: 4000 psi :~, 28 Days TEMPE~TURE (~-Am 60 F C~NCRETE: 60 r
SLCMr: 5.0" Max 'rnucK ~o: 451 TICKKr ~O: 2774854
AIR: 3-6% Am CONTENT (%): 4.6 t.:~X ~VE~mT (~07 N/A
Tzxr MZXHOO: ASTM C-143 PLACEMENT I.~ATION:
G~de ~
ASTM C- 172 s~ aa~h~ sk~ch.
ASTM C-39
S.~MPLE L~ATION: S~ pla~ent l~tion
REPORT OF TESTS ACCI:MUI.ATIVEYARDS: 10
CYLINDER MEASURED MAXIMUM COMPRESSIVE
NLStRKED SLUMP DATE AGE LOAD STRENGTll FRACTURE
SET NO. (inches) TE.~fED (days) Obs. force) (pM) TYPE
1 1 6.00 11/17/2000 7 79200 2800
1 2 6.00 11/17/2000 7 87350 3090
Average 2950
I 3 6.00 12/08/2000 28
I 4 6.00 12/08/2000 28
Technician: Albert Gar(ia Started: 1 l:30am Finished: 1:30pm ~~
Report Distribution: Inc.
( 1 ) St..Ann's Catholic Community ( 1 ) Datum Engineering. Inc.
(!) Centex Censtmction (1) Cit.,,, of Coppell Eric J. Cleveland, P.E.
(1) City. of Coppell Senior Project Engineer
(1) .Alliance Architects
This n:laorl is exclusively for the use of the client indicated above and shall not be reproduced exo~ in full without the ss~ten approval of tlBC Engineering. Inc.
0ILL Page 1 of 1