Loading...
St Ann Catholic-LR001122CONCRETE COMPRE SIVE STRENGTH TES ' a division 8901 Carpenter Frwy., S~ite #100 D~a~, Texas 75247 Date of Service: 11/10/2000 Report No.: 0029425 Report Date ! 1/22/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Communit3' Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations: perform required field test and cast compressive strength samples. PROJECT DATA CO:~TRACrOR: Centex Construction .~I~ ~,D.: 8205 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 11/10/2000 BATCH TLXtE: 10:36am PLA.~r: 41 TI.XtES.~_X~PLED: 12715pm ~x': Albe~ Garcia SPECIHCATION REQUI~MENTS XVEATHER ~NDITIONS: Cloudy STRENGTH: 4000 psi :~, 28 Days TEMPE~TURE (~-Am 60 F C~NCRETE: 60 r SLCMr: 5.0" Max 'rnucK ~o: 451 TICKKr ~O: 2774854 AIR: 3-6% Am CONTENT (%): 4.6 t.:~X ~VE~mT (~07 N/A Tzxr MZXHOO: ASTM C-143 PLACEMENT I.~ATION: G~de ~ ASTM C- 172 s~ aa~h~ sk~ch. ASTM C-39 S.~MPLE L~ATION: S~ pla~ent l~tion REPORT OF TESTS ACCI:MUI.ATIVEYARDS: 10 CYLINDER MEASURED MAXIMUM COMPRESSIVE NLStRKED SLUMP DATE AGE LOAD STRENGTll FRACTURE SET NO. (inches) TE.~fED (days) Obs. force) (pM) TYPE 1 1 6.00 11/17/2000 7 79200 2800 1 2 6.00 11/17/2000 7 87350 3090 Average 2950 I 3 6.00 12/08/2000 28 I 4 6.00 12/08/2000 28 Technician: Albert Gar(ia Started: 1 l:30am Finished: 1:30pm ~~ Report Distribution: Inc. ( 1 ) St..Ann's Catholic Community ( 1 ) Datum Engineering. Inc. (!) Centex Censtmction (1) Cit.,,, of Coppell Eric J. Cleveland, P.E. (1) City. of Coppell Senior Project Engineer (1) .Alliance Architects This n:laorl is exclusively for the use of the client indicated above and shall not be reproduced exo~ in full without the ss~ten approval of tlBC Engineering. Inc. 0ILL Page 1 of 1