Loading...
St Ann Catholic-LR001120'CONCRETE COMPRI JSSIVE STRENGTH TES; ENGINEERENG, LNC. a di~ iyion qf'i[erracan 8901 Carpenter Frwy., Suite #100 D',dlas, Texas 752A7 Date of Service: 10/19/2000 Report No.: 0027290 Report Date 11/20/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Centex Construction MIX I.D.: 9507 CONCRETE SUPPLIER: TXI PLACE*IENTDAI'E: 10/19/2000 BATCII TIME: 3:45am PLANT: 41 TIblESAMPLED: 4:30am BY: Darin Mathis SPECIFICATION REQUIREMENTS WEATIIER CONDITIONS: Clear STRENGTH: 4000 psi ~: 28 Days TEMPERATURE (F)- AIR 62 r CONCRF:rE: 75 SLLrMp: 5.0" Max TRUCKNO: 643 TICKETNO: 2763728 AIR: N/A AIR CONTENT (%): ~'/A UNIT WEIGItT {pct): N/A TEST METIIOD: ASTM C- 143 PLACEMENT LOCATION: Lex-el I. building pad (cast wing.~ A to C.4 & 7 to 10.5.N.2 m S, ?.5 to 9 ASTM C-172 ASTM C-39 SAMPLE LOCATION: A-8 REPORT OF TESTS ACCt,~IUI.ATIVE YARDS: 100 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTIt FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE I I 5.00 10/23/2000 4 99390 3510 I 2 5.00 10/26/2000 7 111050 3930 1 3 5.00 10/26/2000 7 120960 4280 Average 4110 I 4 5.00 11/16/2000 28 168040 5940 1 5 5.00 i 1/16/2000 28 178650 6320 Average 6130 This report is exchisively for the use of the client indicated above and shall not be reproduced except m full v, ithout the written approxal of HBC Engineering, Inc. OILL Report No.: 0027290 CYLINDER MEASURED MAXIMUM COMPI~ESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FIL%CTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE Note: Contractor requested early breaks on Sets 1, 3 and 5. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full x~ ithout thc written approval of HBC Engineering. Inc. OIL1. -CONCRETE COMPRL 4SIVE STRENGTH TEL2 ENGhNEERLNG, a division of 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 10/19/2000 Report No.: 0027290 Report Date 11/20/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Centex Construction MtXI.D.: 9507 CONCRETE SUPPLIER: TXI PI.ACEMENTI)ATE: 10/19/2000 BATCHTIME: 5:15am PLANT: 41 TLMF. SAS1PLED: 5:45am Irt': Darin Mathis SPECIFICATION REQUIREMENTS WEATI-IEII CONDITIONS: Clear STRENGTH: 4000 psi @ 28 Days TEMPEIL,'~TURE (F)- AIR 62 [ CONCRETE: 76 F SLUMP: 5.0" Max TRUCK NO: 454 TICKET NO: 2763798 AIR: N/A AIR CONTENT (%): N/A UNIT WEIGHT (pcf): N/A 'rEST METHOD: ASTM C-143 PLACEMENT LOCATION: See page 1 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: 13-8.5 REPORT OF TESTS ACCUMULATIVE YARDS: 200 CYLINDER MEASURED MAXIMUM CO.MPI~rY. SSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches} TESTED (days) (lbs. force) (psi) TYPE 2 I 5.00 10/26/2000 7 114420 4050 2 2 5.00 10/26/2000 7 117760 4160 Average 4110 2 3 5.00 11/16/2000 28 167810 5930 2 4 5.00 11/16/2000 28 161640 5720 Average 5830 This report is exclusively k~r the use of the client indicated ahove and shall not be reproduced except in full without the written approval of HBC Engineering. [nc. 0ILL -CONCRETE COMPRE, oSIVE STRENGTH TES. '_ ENGI N'EERLNG. a divi.~ion off ] r~afl~c_.l~-i 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75*_47 Report Date Date of Service: 10/19/2000 Report No.: 0027290 11/20/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTILS, CTOR: Centex Construction MIX I.D.: 9507 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 10/19/2000 I~ATCH TLME: 6:45am PLA,¥r: 41 TIME SAMPLED: 7:30am BY: Darin Mathis SPECIFICATION REQUIREMENTS WEATIIER CONDITIONS: Clear STRENGTII: 4000 psi @ 28 Days TEMPERATURE(F)-AtR 62 F CONCRETE: 78 F SLtmtP: 5.0" Max TRUCK NO: 804 TICKET NO: 2763905 AIR: N/A AIR CONIENT (%): N/A ENII WEIGHI (pcf): X/A TEST METHOD: ASTM C- 143 PI,ACEMENT LOCAIION: Sec page 1 ASTM C-172 ASIM C-39 SAMPLE LOCATION: S-8.5 REPORT OF TESTS ACCUMULATIVE YARDS: 3 I0 CYLINDER MEASURED MAXIMU.%! COMPRESSIVE I~La.,RKED SLUMP DATE AGE LOAD STRENGTH FI~XCTURE SET NO. (inches) TESTED (days} (lbs. force) (psi) TYPE 3 I 5.00 10/23/2000 4 94790 3350 3 2 5.00 10/26/2000 7 116470 4120 3 3 5.00 10/26/2000 7 117260 4150 Average 4140 3 4 5.00 11/16/2000 28 1594 l0 5640 3 5 5.00 11/16/2000 28 160000 5660 Average 5650 This report is exclusively for thc use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering. Inc. OILL 'CONCRETE COMPRESSIVE STRENGTH TES l' ENGINEERING. 1:~. a division of 1Erracan 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75*..247 Date of Service: 10/19/2000 Report No.: 0027290 Report Date 11/20/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CO~q'aAC'rOR: Centex Construction M~X~.D.: 9507 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 10/19/2000 BATCII TIME: 8:55am PLANT: 4[ TIME SAMPLED: 9:30am BY: Darin Mathis SPECIFICATION REQUIREMENTS WEATIIER CONDITIONS: Clear STRENGTH: 4000 psi @ 28 Days TEMPEIL-VI'URE(F)-AIR 65 F CONCRETE: 80 F SLtrMP: 5.0" Max TRL'CK NO: 804 TICKET NO: 2764203 AIR: N/A AIR CONTENT (%): N/A UNIT WEIGHT (pcl): N/A 'rEST METHOD: ASTM C- 143 PLACEMENT LOCATION: See page 1 ASTM C-172 ASIM C-39 SAMPLE LOCATION: N.2,8 REPORT OF TESTS ACCUMULATIVE'CA,mS: 430 CYLINDER MEASURED MAXLMUM COMI'RESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FIL&CTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 4 I 5.00 10/26/2000 7 113300 4010 4 2 5.00 10/26/2000 7 114090 4030 Average 4020 4 3 5.00 11/16/2000 28 176490 6240 4 4 5.00 11/16/2000 28 170340 6020 Average 6130 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering. Inc. 0ILL 'CONCRETE COMPR ,SSIVE STRENGTH TEL £ ENGLNEERLXG, INC. a division of']~ff'~Cofi 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 10/19/2000 Report No.: 0027290 Report Date 11/20/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Centex Construction MIX I.D.: 9507 CONCRETE SUPPLIER: TXI PLACEMI£NT DATE: 10/19/2000 BATClt TIME: 9:30am PLANT: 41 TINIE SAMPI.ED: 10:00am I~V: Darin Mathis SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear STRENGTH: 4000 psi @ 28 Days TEMPEIL~.I~IRE (}')- AIR 67 V CONCRETE: 85 r SLUMP: 5.0" Max TRUCK NO: 807 TICKET NO: 2764279 AIR: N/A AIR CONTENT (¢~): N/A UNIT WEIGIIT ttpct): N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: See page I ASTM C-172 ASTM C-39 SAMPLE LOCATION: Q9,8.5 REPORT OF TESTS ACCL'MULATIVEYARDS: 450 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTU lie SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 5 1 5.00 10/23/2000 4 79140 2800 5 2 5.00 10/26/2000 7 111280 3940 5 2 5.00 10/26/2000 7 113370 4010 Average 3980 5 3 5.00 11 / 16/2000 28 165760 5860 5 4 5.00 I 1/16/2000 28 161110 5700 Average 5780 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the v, ritten approval of HBC Engineering. Inc. OILL Report No.: 0027290 CYLINDER MEASURED MAXIMIo,'M COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FIL,~CTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE Technician: Darin Mathis Started: 3:00am Finished: 10:30am Report Distribution: ~Illc' (l) St. Ann's Catholic Community (1) Datum Engineering, Inc. ( I ) Centex Construction (1) City of Coppell Eric J. Cle veland, P.E. ( I I City of Coppell Senior Project Engineer (I) Alliance Architects This report is exclusively for the use of the clicut indicated above and shall trot be reproduced except in full without tire ~.-ritteu approval of }lB(,' Engineering. Inc. 0ILL