Loading...
St Ann Catholic-LR001107CONCRETE COMPRLSSIVE STRENGTH TE . £ a division 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 10/27/2000 Report No.: 0028095 Report Date 11/07/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Centex Construction MIX I.D.: N/A CONCRETE SUPPLIER: TXI PLACEMENT OATE: 10/27/2000 BATCH Yl>IE: 11:00am PriNT: 38 TIME SAMPLED: 1 l:50am BY: Shane Spinks SPECIFICATION REQUIREMENTS WEATIIER CONDITIONS: Partly cloud),, warm STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F) - AIR N/A F CONCRETE: N/A F SLLrMp: 3-5" TRUCK NO: N/A TICKET NO: N/A AIR: N/A AIR CONTENT (%): 1.8 UNIT WEIGHT (pc0: N/A TEST METiIOD: ASTM C- 143 PLACEMENT LOCATION: Pier information and technician time: See Report #0028094 ASTM C-172 ASTM C-39 SAMPLE LOCATION: B-2. C-2. D-2 REPORT OF TESTS ACCUMULATIVE YARDS: 10 CYLINDER MEASURED MAXIa. MUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTII FR_&CTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE I I 5.25 11/03/2000 7 112570 3980 1 2 5.25 11/03/2000 7 120250 4250 Average 4120 I 3 5.25 11/24/2000 28 1 4 5.25 11/24/2000 28 Technician: Shane Spinks Started: Finished: ~n Report Distribution: eering, Inc. (1) St. Ann's Catholic Community (I) Datum Engineering, Inc. (1) Centex Construction (I) City of Coppell Eric J. Cleveland, P.E. (I) City of Coppcll Senior Project Engineer (I) Ailiaace Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC En~ncering, Inc. O1LL Page 1 of 1