St Ann Catholic-LR001107CONCRETE COMPRLSSIVE STRENGTH TE . £
a division
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 10/27/2000 Report No.: 0028095 Report Date
11/07/2000
Client No.: 2310 Project No.: 94001152
Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church
Attn: Monsignor Kilian Broderick 180 Samuel Boulevard
180 Samuel Boulevard
Coppell TX 75019 Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: Centex Construction MIX I.D.: N/A
CONCRETE SUPPLIER: TXI PLACEMENT OATE: 10/27/2000 BATCH Yl>IE: 11:00am
PriNT: 38 TIME SAMPLED: 1 l:50am BY: Shane Spinks
SPECIFICATION REQUIREMENTS WEATIIER CONDITIONS: Partly cloud),, warm
STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F) - AIR N/A F CONCRETE: N/A F
SLLrMp: 3-5" TRUCK NO: N/A TICKET NO: N/A
AIR: N/A AIR CONTENT (%): 1.8 UNIT WEIGHT (pc0: N/A
TEST METiIOD: ASTM C- 143 PLACEMENT LOCATION:
Pier information and technician time: See Report #0028094
ASTM C-172
ASTM C-39
SAMPLE LOCATION: B-2. C-2. D-2
REPORT OF TESTS ACCUMULATIVE YARDS: 10
CYLINDER MEASURED MAXIa. MUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTII FR_&CTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
I I 5.25 11/03/2000 7 112570 3980
1 2 5.25 11/03/2000 7 120250 4250
Average 4120
I 3 5.25 11/24/2000 28
1 4 5.25 11/24/2000 28
Technician: Shane Spinks Started: Finished: ~n
Report Distribution: eering, Inc.
(1) St. Ann's Catholic Community (I) Datum Engineering, Inc.
(1) Centex Construction (I) City of Coppell Eric J. Cleveland, P.E.
(I) City of Coppcll Senior Project Engineer
(I) Ailiaace Architects
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC En~ncering, Inc.
O1LL Page 1 of 1