Loading...
St Ann Catholic-LR001103'CONCRETE COMpResSIVE STRENGTH TE 'r ENGINEERD~, IN~. a division of l~ft'-~l~l~ 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 10/05/2000 Report No.: 0025993 Report Date 11/03/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTIL~CTOR: Centex Construction MIXI.D.: 9507 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 10/05/2000 BATCH TlblE: 3: 14am PLANT: 41 TIME SAMPLED: 3:45am nY: Greg Dimock SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear STRENGTIt: 4000 psi @ 28 Days TES-IPEIL&TURE (F) - Am 79 F CONCRETE: 82 r SLUMP: 5.0" Max TRUCKNO: 39 TICI~TNO: 2752620 AIR: N/A AIR CONTENT (%): N/A UNII WEIGHT {pcf}: N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Elevated deck ground level. F.5-K.5/I 1.6-15.6 & A-F/6.8- l 1.4 ASTM C-172 ASTM C-39 Sampled from truck. SAMPLE LOCATION: 1.5/12 REPORT OF TESTS ACCUMULATIVE YARDS: 10 CYLINDER MEASURED MAXL~,-IUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE I 1 4.50 10/08/2000 3 108160 3820 I 2 4.50 10/12/2000 7 144020 5090 l 3 4.50 10/12/2000 7 145590 5150 Average 5120 I 4 4.50 11/02/2000 28 191420 6770 I 5 4.50 11/02/2000 28 190090 6720 Average 6750 This report is exclusively for the use of the client indicated above and shall not be reprcxluced except in full without the written approval of HBC Engineering. lnc_ 0ILL 'CONCRETE COMPR._,SSIVE STRENGTH 1' ENGL\T.~r. RLNG, 1NC. a division of 8901 'Carpenier Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 10/05/2000 Report No.: 0025993 Report Date 11/03/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Centex Construction M~XI.D.: 9507 CONCRE_TE SUPPLIER: TXI PLACEMENT DATE: 10/05/2000 hATeR TI~tE: 4:25am PLANT: 41 TIME SAMPLED: 4:45am BY: Greg Dimock SPECIFICATION REQUIREMENTS WEATHER CONmTIONS: Clear STRENaTH: 4000 psi @ 28 Days T£MP~RnTUm~ (F)- AIR 78 F CO~Cm~TE: 82 F SLUMP: 5.0" Max T~OCKNO: 474 TICKETNO: 2752678 AIR: N/A AIR CONTENT (%-): N/A UNIT WEIGIII (pcf): N/A TEST METItOD: ASTM C- 143 PLACEMENT LOCATION: See page I ASTM C-172 ASTM C-39 Sampled from truck. SAMPLE LOCATION: Fl14 REPORT OF TESTS ACCUMULATIVE YARDS: 10 CYLLNDER MEASURED MAX~-IUM COMPRESSIVE I~LS, RKED SLUMP DATE AGE LOAD STRENGTtt FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 2 I 4.25 10/08/2000 3 97810 3460 2 2 4.25 10/1~2000 7 1211 I0 4280 2 3 4.25 10/12/2000 7 119860 4240 Average 4260 2 4 4.25 11/02/2000 28 172780 6110 2 5 4.25 11/02/2000 28 172940 6120 Average 6120 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. OILL · CONCRETE COMPR .$SIVE STRENGTH TE _ £ E~GINEERLNG, LNC a division 8901 ~arpent'er Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 10/05/2000 Report No.: 0025993 Report Date 11/03/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 CoppelL Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Centex Construction MIX I.D.: 9507 CONCRETESUPI'LIER: TXI PLACEMENT DATE: 10/05/2000 BATCHTIME: 5:49am PLANT: 41 TIME SAMPLED: 6:25am BY: Greg Dimock SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear STRENGTH: 4000 psi @ 28 Days TEMPEIL6,TURE (V)- AIR 76 V CONCRETE: 82 V SLUMP: 5.0" Max TRUCK NO: 37 TICKET NO: 2752785 AIR: N/A AIR CONTENT (%): N/A UNIT WEIGHT (pcD: N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: See page 1 ASTM C-172 ASTM C-39 Sampled from truck. SAMPLE LOCATION: D/7 REPORT OF TESTS ACCUMULATIVE YARDS: 10 CYLINDER MEASURED ,~LAXI~IUM COMPRESSIVE I~L~,RKED SLUMP DATE AGE LOAD STRENGTH FIL,~CTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 3 I 5.00 10/12/2000 7 112320 3970 3 2 5.00 10/12/2000 7 120340 4260 Average 4120 3 3 5.00 11/02/2000 28 154390 5460 3 4 5.00 11/02/2000 28 159280 5630 Average 5550 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering. Inc. 0ILL CONCRETE COMPRx_ASIVE STRENGTH TE _ ENGINEERLNG, LNC. a divLvion of '[~rl?t~rl 8901 ~arpent~r Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 10/05/2000 Report No.: 0025993 Report Date 11/03/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Centex Construction MIX I.D.: 9507 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 10/05/2000 BATCH TI.ME: 7:15am PLANT: 41 TIME SAMPLED: 7:35am BY: GregDimock SPECIFICATION REQUIREMENTS WEATIIER CONDITIONS: Clear STRENGTH: 4000 psi @ 28 Days TEMPEIL¥I'URE (F) o AIR 76 F CONCRETE: 83 ~' SLUSh': 5.0" Max TRUCK NO: 716 TICKET NO: 2752927 AIR: N/A AIR CONTENT (%): N/A UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C- 143 PLACE.",IENT LOCATION: See page 1 ASTM C-172 ASTM C-39 Sampled from truck. SAMPLE LOCATION: BI10.5 REPORT OF TESTS ACCUMULATIVE YARDS: l0 CYLINDER MEASURED MAXI~'IUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FIL~CTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 4 I 4.75 10/12/2000 7 115910 4100 4 2 4.75 10/12/2000 7 117320 4150 Average 4130 4 3 4.75 11/02/2000 28 154190 5450 4 4 4.75 11/0~2000 28 157160 5560 Average 5510 eTechnician: Greg Dimock Started: 2:00am Finished: 9:00am ring, Inc. Report Distribution: (I) St. Ann's Catholic Community (1) Datum Engineering. Inc. (1) Centex Construction (1) City of Coppell Eric J. Cleveland, P.E. (1) City of Coppell Senior Project Engineer (1) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL REPORT OF DRILLED BELLED PIER INSPEC ;ION a division 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 10/27/2000 Report No.: 0028094 Report Date 11/03/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Drilled belled pier inspection. On this date, an HBC Engineering cechnician arrived ac the above referenced jobsite as scheduled for drilled belled pier inspection. See attacked sheet for recorded da~a. Technician Time: 6:00 a.m. to 1:00 p.m. Technician: Shane Spinks /~~~ln~g, Inc. Report Distribution: (1) St. Ann's Catholic Community (1) Datum Engineering. Inc. (1) Centex Construction (1) City of Coppell Eric J. Cleveland, P.E. ( 1 ) City of Coppell Senior Project Engineer (1) Alliance Architect~ This report is exclusively for thc use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering. Inc. 99SDS Page 1 of 1