St Ann Catholic-LR001102CONCRETE COMPRL_,SIVE STRENGTH TEL ._
ENGINEERLNG, 1NC.
a division of'l~!fl'-~.Otl
8901 ~arpent~r Frwy., Suite #I00
Dallas, Texas 75247
Date of Service: 10/25/2000 Report No.: 0027870 Report Date
11/02/2000
Client No.: 2310 Project No.: 94001152
Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church
Attn: Monsignor Kilian Broderick 180 Samuel Boulevard
180 Samuel Boulevard
Coppell TX 75019 Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: Centex Construction MIX I.D.: 8205
CONCRETE SUPPLIER: TXI I'LACEMENT DATE: 10/25/2000 BATCH TIME: 10:34am
PLANT: 41 TI.XiE SAMPLEO: 11:25am nY: Steve Campbell
SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cloudy
STRENGTH: 4000 psi @ 28 Days TEMPERATe'RE (F)- AIR 76 F CONCRETE: 76 g
SLt,*-IP: 5.0" Max TRUCK NO: 70 TICKET NO: 2767817
AIR: N/A AIR CONTENT (%): N/A UNIT WEIGHT (pcf): N//A
TEST METHOD: ASTM C- 143 PLACEMENT LOCATION:
Grade beam for W wall O-3.5 thru 5.5.0.9-3.5 thru 5.5
ASTM C-172
ASTM C-39
SAMPLE LOCATION: 0-4 Grid Line
REPORT OF TESTS ACCUMULAT1VI~; YARDS: l0
CYLINDER MEASURED MAXIML31 COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTIt FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
1 1 5.50 11/01/2000 7 96870 3430
1 2 5.50 11/01/2000 7 92890 3280
Average 3360
I 3 5.50 11/22/2000 28
1 4 5.50 11/22/2000 28
Technician: Steve Campbell Started: 10:30am Finished: l:30pm
Report Distribution: neering, Inc.
( I ) St. Ann's Catholic Community (1) Datum Engineering. Inc.
(I) Centex Construction (I) CiD, of Coppell C::ll'iC J. Cleveland, P.E.
(I) City of Coppell Senior Project Engineer
(I) Alliance Architects
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
0ILL Page 1 of 1