Loading...
St Ann Catholic-LR001102CONCRETE COMPRL_,SIVE STRENGTH TEL ._ ENGINEERLNG, 1NC. a division of'l~!fl'-~.Otl 8901 ~arpent~r Frwy., Suite #I00 Dallas, Texas 75247 Date of Service: 10/25/2000 Report No.: 0027870 Report Date 11/02/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Centex Construction MIX I.D.: 8205 CONCRETE SUPPLIER: TXI I'LACEMENT DATE: 10/25/2000 BATCH TIME: 10:34am PLANT: 41 TI.XiE SAMPLEO: 11:25am nY: Steve Campbell SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cloudy STRENGTH: 4000 psi @ 28 Days TEMPERATe'RE (F)- AIR 76 F CONCRETE: 76 g SLt,*-IP: 5.0" Max TRUCK NO: 70 TICKET NO: 2767817 AIR: N/A AIR CONTENT (%): N/A UNIT WEIGHT (pcf): N//A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Grade beam for W wall O-3.5 thru 5.5.0.9-3.5 thru 5.5 ASTM C-172 ASTM C-39 SAMPLE LOCATION: 0-4 Grid Line REPORT OF TESTS ACCUMULAT1VI~; YARDS: l0 CYLINDER MEASURED MAXIML31 COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTIt FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 5.50 11/01/2000 7 96870 3430 1 2 5.50 11/01/2000 7 92890 3280 Average 3360 I 3 5.50 11/22/2000 28 1 4 5.50 11/22/2000 28 Technician: Steve Campbell Started: 10:30am Finished: l:30pm Report Distribution: neering, Inc. ( I ) St. Ann's Catholic Community (1) Datum Engineering. Inc. (I) Centex Construction (I) CiD, of Coppell C::ll'iC J. Cleveland, P.E. (I) City of Coppell Senior Project Engineer (I) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 1 of 1