Loading...
St Ann Catholic-LR001030· CONCRETE COMPRE SSIVE STRENGTH TES. a division of ]~ 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 10/19/2000 Report No.: 0027290 Report Date 10/30/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Anffs Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTILa, CTOR: Centex Construction MIX I.D.: 9507 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 10/19/2000 BATCIt TD, IE: 3:45am PLANT: 41 TIME SAMPLEI): 4:30am nY: Darin Mathis SPECIFICATION RI-:QUIREMENTS WEATIIER CONDITIONS: Clear STR~NaT}I: 4000 psi @ 28 Days TEMPEIraTVR~ (F)- AIR 62 l: CO.~Cm~TE: 75 l: SLUMP: 5.0" Max 'r~tCCK NO: 643 'rlC~X ~'O: 2763728 AIR: N/A AIR CONTENT (%): N/A UNIT WEIGIIT (pcB: N/A TEST METHOD: ASTM C- 143 PLACEME.N~r LOCATION: Level I, building pad (east wing) A to C.4 & ? to 10.5:N.2 to S, 7.5 to 9 ASTM C-172 ASTM C-39 SAMPLE LOCATION: A-8 REPORT OF TESTS ACCUMULATIVE YARDS: 100 CYLINDER MEASURED MAXIMU,%I COMPRESSIVE MARKED SLUI~IP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE I 1 5.00 10/23/2000 4 99390 3510 I 2 5.00 10/26/2000 7 111050 3930 I 3 5.00 10/26/2000 7 120960 4280 Average 4110 1 4 5.00 11/16/2000 28 1 5 5.00 11/16/2000 28 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 1 of 6 · Report No.: 0027290 Note: Contractor requested early breaks on Sets 1, 3 and 5. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering. Inc. 0ILL Page 2 of 6 'CONCRETE COMPRESSIVE STRENGTH TES l a di~,'ision of'l~fl'-~l~fl 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: I0/I9/2000 Report No.: 0027290 Report Date 10/30/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CO.X~rRACTOR: Centex Construction MIX I.D.: 9507 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 10/19/2000 BATCII TIME: 5: 15am PI~rr: 41 TIME SAMPLED: 5:45am BY: Darin Mathis SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear STRENGTH: 4000 psi @ 28 Days TEMPEI~Tt~mi (F)- AIR 62 ~ CO,CreaTE: 76 ~: SLtmlP: 5.0" Max TRt~CK NO: 454 TICmiT NO: 2763798 AIR: N/A AIR CONTENT (%): N/A UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: See page I ASTM C-172 ASTM C-39 SAMPLE LOCATION: B-8.5 REPORT OF TESTS ACCUMULATIVE YARDS: 200 CYLINDER MEASURED l~tS, XBIL'M COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 2 ! 5.00 10/26/2000 7 114420 4050 2 2 5.00 10/26/2000 7 117760 4160 Average 4110 2 3 5.00 11/16/2000 28 2 4 5.00 11/16/2000 28 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering. Inc. 0ILL Page 3 of 6 · CONCRETE COMPRLoSIVE STRENGTH TEL" a division 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 10/19/2000 Report No.: 0027290 Report Date 10/30/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Centex Construction MIX I.D.: 9507 CONCRETE SL'PPLIER: TXI PI.ACEMENT DATE: 10/19/2000 BATCII TIME: 6:45am PLAN-T: 41 TIME SAMPLEI): 7:30am BY: Darin Mathis SPECIFICATION REQUIREMENTS WEATItER CONDITIONS: Clear STRENGTH: 4000 psi @ 28 Days TEMPEIL4,TURE (F)- AIR 62 F CONCRETE: 78 E SL~*IP: 5.0" Max TRUCK NO: 804 TICKET NO: 2763905 AIR: N/A AIR CONTENT (%): N/A UNIT WEIGIIT (pcf): N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: See page 1 ASTM C-172 ASTM C-39 SAMPLE LOCATION: S-8.5 REPORT OF TESTS ACCUMULATIVE YAR S: 310 CYLINDER MEASURED ~L~kXI~IL'bl COMPRESSIVE I~LSsRKED SLL~vIP DATE AGE LOAD STRENGTH FIL4.CTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 3 1 5.00 10/23/2000 4 94790 3350 3 2 5.00 10/26/2000 7 116470 4120 3 3 5.00 10/26/2000 7 117260 4150 Average 4140 3 4 5.00 11/16/2000 28 3 5 5.00 11/16/2000 28 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 4 of 6 'CONCRETE COMPRI , SIVE STRENGTH TES.. a division of lrL:'fl-'~gaarl 8901 Carpenter Frwy., SuRe #100 Dallas, Texas 75247 Date of Service: 10/19/2000 Report No.: 0027290 Report Date 10/30/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Cen[ex Construction MIX I.D.: 9507 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 10/19/2000 BATCII TIME: 8:55am PLANT: 41 TIME SAMPLED: 9'30am BY: Darin Mathis SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear STRENGTH: 4000 psi @ 28 Days TEMPERAI1JRE (Fl- AIR 65 F COXCRETE: 80 F SLUMP: 5.0" Max TRUCK NO: 804 TICKET NO: 2764203 AIR: N/A AIR CONTENT (%): N/A UNIT WEIGIIT (pcfl: N/A TEST METIIOD: ASTM C- 143 PLACEMENT LOCATION: See page 1 ASTM C-172 ASTM C-39 SAMPLE LOCATION: N.2,8 REPORT OF TESTS ACCUMULATIVE YARDS: 430 CYLINDER MEASURED MAXE~IL~-I COMPRESSIVE IYLS, RKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 4 1 5.00 10/26/2000 7 113300 4010 4 2 5.00 10/26/2000 7 114090 4030 Average 4020 4 3 5.00 11/16/2000 28 4 4 5.00 11 / 16/2000 28 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 5 of 6 'CONCRETE COMPRESSIVE STRENGTH TES.' ENGLNEE, RING, INC. a division 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 10/19/2000 Report No.: 0027290 Report Date 10/30/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Centex Construction MIX I.D.: 9507 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 10/19/2000 BATCHTI3LE: 9:30am PLANT: 41 TI3,-IE SAMPLED: 10:00am BY: Darin Mathis SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear STRENGTII: 4000 psi @ 28 Days TEMPERATURE (F)- AIR 67 F CONCRETE: 85 F SLtn~IP: 5.0" Max TRUCK NO: 807 TICKET NO: 2764279 AIR: N/A AIR CONTENT (%): N/A UNIT WEIGIIT (pcf}: N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: See page 1 ASTM C-172 ASTM C-39 SAMPLE LOCATION: Q9,8.5 REPORT OF TESTS ACCL*-IULATIVE YAm)S: 450 CYLINDER MEASURED *IAXIMUM COMPRESSIVE MARKED SLL,'~'IP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 5 1 5.00 10/23/2000 4 79140 2800 5 2 5.00 10/26/2000 7 111280 3940 5 2 5.00 10/26/2000 7 113370 4010 Average 3980 5 3 5.00 11/16/2000 28 5 4 5.00 11/16/2000 28 Technician: Darin Mathis Started: 3:00am Finished: 10:30am ~/~41~'~i Report Distribution: 'neering, Inc. (1) St. Ann's Catholic Community (I) Datum Engineering. Inc. (1) Centex Construction (I) City of Coppell Eric J. Cleveland, P.E. (1) City of Coppell Senior Project Engineer (1) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 6 of 6