Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
St Ann Catholic-LR001027
REPORT OF DRILLED BELLED PIERS ENGINEERING, INC. 8901 Carpenter Frwy., Sui'.e al(X) Dallas, Texas 75247 Project: St. Ann's Catholic Church Report No.: 0028094 180 Samuel Boulevard, Coppell, Texas Date of Service: 10/27/00 Project No.: 94001152 Technician: S. Spinks Driller: N.L. Schutte Page: 1 of 1 II Pier Identification B-2 C-2 D-2 II Pier Diameter (in.) 30 30 30 Bell Diameter (in.) 66 66 66 *Top of Pier Elevation (ft) 96.7 96.7 96.7 Req. Depth from Exist. Grade (ft) 8.0 8.0 8.0 Initial Depth of Pier from Existing Grade (ft) 15.0 11.0 11.7 Final Depth of Pier from Existing Grade (ft) 15.2 11.2 11.7 Depth from Top of Concrete (ft) 13.2 11.7 12.2 Condition of Bottom (wet or dry) Dry Dry Dry Plumb Within Tolerance (yes or no) Yes Yes Yes Casing Diameter (in) N/A N/A N/A Cased Depth (ft) N/A N/A N/A Number of Vertical Bars (ea.) 6 6 6 Reinforcing Bar Size (#) 7 7 7 Length of Vertical Bars (ft.) 11.5 11.5 11.5 Time Drilling was Completed 9:45 a.m. 9:55 a.m. 10:10 a.m. Time Concrete was Placed 11:40 a.m. 11:50 a.m. 12:20 p.m. *Top of Pier Elevation was provided by others.