Loading...
St Ann Catholic-LR001026COI ICRETE COMPRL ,SIVE STRENGTH TEL .' a division ofl~ 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 09/26/2000 Report No.: 0025062 Report Date 10/26/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Centex Construction MIX I.D.: 9507 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 09/26/2000 }~n'rcn TIblE: 3:1 lam PLANT: 41 TIME SAMPLED: 3:35am BY: GregDimock SPECIFICATION REQUIREMENTS WEAIHER CONOITIO.~S: Clear STRENGTH: 4000 psi @ 28 Days TEMPERATURE (F)- AIR 56 F CONCRETE: 71 F SLtrMp: 5.0" Max TRUCK NO: 474 TICKET NO: 2743143 AIR: N/A AIR CONTENI {%): N/A UNIT WEIGI1T (pcO: N/A TEST METIIOD: ASTM C-143 PLACEMENT LOCATION: Elevated slab, ground level C-Q/16-20 ASTM C-172 ASTM C-39 SAMPLE LOCATION: D/I 7 REPORT OF TESTS ACCU3,1ULATIVE YARDS: 10 CYLINDER MEASURED MAXIMUM COMPRESSIYE MARKED SLLrMP DATE AGE LOAD STRENGTII FIL4,CTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE I I 5.75 09/30/2000 4 76360 2700 1 2 5.75 10/03/2000 7 l 13900 4030 I 3 5.75 10/24/2000 28 153550 5430 1 4 5.75 10/24/2000 28 153770 5440 Average 5440 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 1 of 5 CONCRETE COMPR;JSSIVE STRENGTH TEL £ ENGL\'EERL~G, I.NC. a division 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 09/26/2000 Report No.: 0025062 Report Date 10/26/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Centex Construction MIX I.D.: 9507 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 09/26/2000 BATCH TIME: 4:36am PLANT: 41 TIME SAMPLED: 5:50am BY: Greg Dimock SPECIFICATION REQUIREMENTS WEAl'HER CONDITIONS: Clear STRENGTH: 4000 psi @ 28 Days TEMPERATURE (F)-AIR 55 F CONCRETE: 72 F SLCrMp: 5.0" Max TRUCK NO: 643 TICKET NO: 2743212 AIR: N/A AIR CONTENT (%): N/A UNIT WEIGHT (pcf): N/A TEST METIIOD: ASTM C- 143 PLACEMENT LOCATION: See page 1 ASTM C-172 ASTM C-39 SAMPLE LOCATION: F.2/17.5 REPORT OF TESTS ACCUMULATIVE YARDS: l0 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 2 1 6.00 09/30/2000 4 84550 2990 2 2 6.00 10/03/2000 7 110800 3920 2 3 6.00 10/24/2000 28 155420 5500 2 4 6.00 10/24/2000 28 159510 5640 Average 5570 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 2 of 5 ' CONCRETE COMPR,-$SIVE STRENGTH £ a divi.*ion 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 09/26/2000 Report No.: 0025062 Report Date 10/26/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CON'tRACTOR: Centex Construction MIX I.D.: 9507 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 09/26/2000 BATCH TIME: 6:04am PLANT: 4 1 TIME SAMPLED: 6:25am BY: Greg Dimock SPECIFICATION REQUIREMENTS WEATItER CONDITIONS: Clear STRENGTH: 4000 psi @ 28 Days TEMPERATURE (F)- AIR 52 g CONCRETE: 71 F SLUMP: 5.0" Max TRUCK NO: 803 TICKET NO: 2743305 AIR: N/A AIR CONTENT (%): N/A UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: See page I ASTM C-172 ASTM C-39 SAMPLE LOCATION: J/l 7.5 REPORT OF TESTS ACCCLMIJLATIVEYARDS: 10 CYLINDER MEASURED MAXLMU3I COMPRESSIVE MARKED SLU3,1P DATE. AGE LOAD STRENGTH F1Lz, CTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 3 1 6.00 09/30/2000 4 68680 2430 3 2 6.00 10/03/2000 7 105610 3730 3 3 6.00 10/24/2000 28 144630 5110 3 4 6.00 10/24/2000 28 146420 5180 Average 5150 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 3 of 5 ' CONCRETE COMPR, 3SIVE STRENGTH TE . £ ~NGINEERLNG, L. NU. a division 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 09/26/2000 Report No.: 0025062 Report Date 10/26/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Centex Construction MIX I.D.: 9507 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 09/26/2000 BATCH TIME: 8:04am PLANT: 41 TIME SAMPLED: 8:45am BY: Greg Dimock SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear STRENGTH: 4000 psi @ 28 Days TEMPERATURE (F)-AIR 58 V CONCRETE: 72 ~' SLt~IP: 5.0" Max TRUC~: NO: 643 TIC~CET NO: 2743530 AIR: N/A AIR CONTENT (%): N/A UNIT WEIGHT (pcO: NN/A TEST M~rHOD: ASTM C- 143 PLACEMENT LOCATION: See page 1 ASTM C-172 ASTM C-39 SAMPLE LOCATION: M/19.5 REPORT OF TESTS ACCUMULATIVE YAROS: 10 CYLINDER MEASURED ~La. XI3-1U3-1 COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 4 1 5.50 09/30/2000 4 135890 48 i0 4 2 5.50 10/03/2000 7 137000 4840 4 3 5.50 10/24/2000 28 162110 5730 4 4 5.50 10/24/2000 28 165310 5850 Average 5790 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 4 of 5 cONCRETE COMPRLSSIVE STRENGTH TEL £ a division of]~'~t3~l 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 09/26/2000 Report No.: 0025062 Report Date 10/26/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Centex Construction MIX I.D.: 9507 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 09/26/2000 BATCII TLX-m: 9: 17am PLAN~r: 41 TIME SAMPLED: 9:40am BY: Greg Dimock SPECIFICATION REQUIREMENTS WEATItER CONDITIONS: Clear STRENGTH: 4000 psi @ 28 Days TEMPV. RATURE (F)- AIR 73 F CONCRETE: 74 F SLUMP: 5.0" Max TRUCK NO: 803 TICKET NO: 2743707 AIR: N/A AIR CONTENT (%): N/A UNIT WEIGIIT (pc/): N/A TEST METIIOD: ASTM C-143 PLACEMENT LOCATION: See page I ASTM C- 172 ASTM C-39 SAMPLE LOCATION: P/16.3 REPORT OF TESTS ACCCqMULATIVE YARDS: l0 CYLINDER MEASURED ~L~XIML.~I COMPRESSIVE MARKED SLU3iP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 5 I 6.00 09/30/2000 4 78400 2770 5 2 6.00 10/03/2000 7 109100 3860 5 3 6.00 10/24/2000 28 143610 5080 5 4 6.00 10/24/2000 28 145550 5150 Average 5120 Technician: Greg Dimock Started: 2:00am Finished: l:30pm Report Distribution: ~' eering, Inc. (1) St. Ann's Calholic Community (I) Datum Engineering, Inc. (1) Centex Construction (I) City of Coppell Eric J. Cleveland, P.E. (I) City of Coppell Senior Project Engineer (I) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 5 of 5 CONCRETE COMPRL SIVE STRENGTH TEL .' a division of l~r~-~con 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 09/26/2000 Report No.: 0025122 Report Date 10/26/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Centex Construction MIX l.D.: 8273 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 09/26/2000 BATCII TIME: 10:49am PLANT: 41 TIME SAMPLED: I l:30am BY: Greg Dimock SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear STRENGTIt: 3500 psi @ 28 Days TEMPERATURE (F)- AIR 77 V CONCRETE: 80 F SLUMP: 5.0" Max TRUCK NO: 927 TICKET NO: 2743887 AIR: 3-5% AIR CONTENT (%): 4.0 UNIT WEIGHT (per): NIA TEST METHOD: ASTM C-143 PLACEMENT LOCATION: Paving- fire lane at south side of existing building ASTM C- 172 ASTM C-39 Sampled from truck, Technician Time: See Report #0025062 SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 10 CYLINDER MEASURED MAXLMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FIL&CTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE I I 4.75 10/03/2000 7 99750 3530 1 2 4.75 10/03/2000 7 98430 3480 Average 3510 I 3 4.75 10/24/2000 28 140390 4960 I 4 4.75 10/24/2000 28 143390 5070 Average 5020 Sample location: From SE corner of building, 35'S x !0' W~ ~C Technician: Greg Dimock Started: Finished: Report Distribution: ' (I) St. Ann's Catholic Community (1) Datum Engineering, Inc. (1) Centex Construction (I) CiB, of Coppell Eric J. Cleveland, P.E. (l) City of Coppell Senior Project Engineer (1) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 1 of 1