Loading...
St Ann Catholic-LR001016'CONCRETE COMPR -3SIVE STRENGTH TEL"' TM a division of'l~n'tacrm 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 10/05/2000 Report No.: 0025993 Report Date 10/16/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Centex Construction MIX I.D.: 9507 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 10/05/2000 BATCH TIME: 3:14am PLA~rr: 41 TrMESAMPLED: 3:45am BY: GregDimock SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear STRENGTH: 4000 psi @ 28 Days X~MPERATVRE (F) - AIR 79 g CONCRETe: 82 V SL~IP: 5.0" Max TgVCK NO: 39 TICKET NO: 2752620 AIR: N/A AIR co~x~rE~-r (%): N/A UNIT WEIGHT (pcO: N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Elevated deck ground level, F.5-K.5/11.6-15.6 & A-F/6.8-11.4 ASTM C-172 ASTM C-39 Sampled from truck. SAMPLE LOCATION: 1.5/12 REPORT OF TESTS ACCUMULATIVE YARDS: l0 CYLINDER MEASURED blAXD, IUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 4.50 10/08/2000 3 108160 3820 1 2 4.50 10/12/2000 7 144020 5090 1 3 4.50 10/12/2000 7 145590 5150 Average 5120 I 4 4.50 11/02/2000 28 1 5 4.50 11/02/2000 28 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 1 of 4 CONCRETE COMPRCSIVE STRENGTH TEL-' _ E lXC_,I N F_~F. RI~, I NC. a division ofl~--~lall 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 10/05/2000 Report No.: 0025993 Report Date 10/16/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Centex Construction Mix I.D.: 9507 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 10/05/2000 BATCH TIME: 4:25am PLANT: 41 TIME SAMPLED: 4:45am BY: Greg Dimock SPECIFICATION' REQUIREMENTS WEATHER CONDITIONS: Clear STRENGTH: 4000 psi @ 28 Days TEMPERATURE (F)- AIR 78 V CONCRETE: 82 F SLLmfP: 5.0" Max TRUCK NO: 474 TICKET NO: 2752678 AIR: N/A AIR CoN-rENT (~): N/A UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C-143 PLACEMENT LOCATION: See page ! ASTM C- 172 ASTM C-39 Sampled from truck. SAMPLE LOCATION: Fl14 REPORT OF TESTS ACCUMULATIVE YARDS: 10 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLLrMp DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 2 i 4.25 10/08/2000 3 97810 3460 2 2 4.25 10/12/2000 7 121110 4280 2 3 4.25 10/12/2000 7 119860 4240 Average 4260 2 4 4.25 11/02/2000 28 2 5 4.25 11/02/2000 28 This report is exclusively for the usc of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 2 of 4 CONCRETE COMPRL, SIVE STRENGTH TEE a division 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date Date of Service: 10/05/2000 Report No.: 0025993 10/16/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA coNTgnc~oR: Centex Construction MIX I.D.: 9507 CONCRETE SUPPLIER: TXI PLACEMENT OnTE: 10/05/2000 BATCH T~m: 5:49am PLANT: 41 TII~fESAMPLED: 6:25am BY: Greg Dimock SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear STRENGTH: 4000 psi @ 28 Days TEMPERATURE (~3- AIR 76 F CONCRETE: 82 F SLt~U': 5.0" Max TRUCK NO: 37 TICIC~T r~O: 2752785 AIR: N/A AIR CONTENT (%): N/A UNIT WEIGIIT (pcf): N/A TEST METHOD: ASTM C- 143 PLACESmNT LOCATION: See page 1 ASTM C-172 ASTM C-39 Sampled from truck. SAMPLE LOCATION: D/7 REPORT OF TESTS ACCUMULATIVE YARDS: 10 CYLIaNDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 3 1 5.00 I0/12/2000 7 112320 3970 3 2 5.00 10/12/2000 7 120340 4260 Average 4120 3 3 5.00 11/02/2000 28 3 4 5.00 11/02/2000 28 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 3 of 4 'CONCRETE COMPR _$SIVE STRENGTH TE /' a division ofl~ff-~ 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 10/05/2000 Report No.: 0025993 Report Date 10/16/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Centex Construction MIX I.D.: 9507 " CONCRETE SUPPLIER: TXI PLACEMENT DATE: 10/05/2000 BATCH TIME: 7:15am PLANT: 41 TIME SAMPLED: 7:35am BY: Greg Dimock SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear STRENGTH: 4000 psi @ 28 Days TEMPERATURE (F)- AIR 76 F CONCRETE: 83 }' SLUMP: 5.0" Max TRUCK NO: 716 TICKET NO: 2752927 AIR: N/A AIR CONTENT (%): N/A UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: See page I ASTM C- 172 ASTM C-39 Sampled from truck. SAMPLE LOCATION: B/10.5 REPORT OF TESTS ACCUMULATIVE YARDS: 10 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 4 1 4.75 10/12/2000 7 115910 4100 4 2 4.75 10/12/2000 7 117320 4150 Average 4130 4 3 4.75 11/02/2000 28 4 4 4.75 11/02/2000 28 Technician: Greg Dimock Started: 2:00am Finished: 9:00am ~e Report Distribution: ' ring, Inc. (!) St. Ann's Catholic Community (I) Datum Engineering, Inc. (I) Centex Construction (I) City of Coppell Eric J. Cleveland, P.E. (I) City of Coppell Senior Project Engineer (I) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 4 of 4