Loading...
St Ann Catholic-LR001013 a di,.ision of'l~wracxm 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 09/13/2000 Report No.: 0023946 Report Date 10/13/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Centex Construction MIX I.D.: 8205 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 09/13/2000 BATCH TIME: PLANT: 41 TIME SAMPLED: I .'50p BY: Roy Montgomery SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear STRENGTH: 4000 psi @ 28 Days TEMPERATURE (F)-AIR 90 F COb'CRETE: 90 r SLUMP: 3-5" TRUCK N'O: 937 TICKET NO: 2733626 AIR: N/A AIR CONTENT (%): N/A UNIT WEIGHT (pcf): N/A TEST METItOD: ASTM C- 143 PLACEMENT LOCATION': Grade Beams at line 4.7, lines A-B; line 10.5. lines Y-A; line A, lines 8.4-10..5; line Y, ASTM C-172 lines 8.8-10.5; line X, lines 7-8.8; line 7, lines X-A; line A, lines 8.4-4.7 and line B, lines ASTM C-39 4.3-6.8 SAM. PLE LOCATION: Grid line B/4.5 REPORT OF TESTS ACCL~iULATIVE YARDS: CYLINDER MEASURED MAX~IUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 I 5.50 09/20/2000 7 99940 3530 1 2 5.50 09/20/2000 7 102280 3620 Average 3580 1 3 5.50 10/11/2000 28 132750 4690 I 4 5.50 10/11/2000 28 133130 4710 Average 4700 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01SDS Page 1 of 2 .CONCRETE COMPRk SIVE STRENGTH a division 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 09/13/2000 Report No.: 0023946 Report Date 10/13/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Centex Construction MIX I.D.: 8205 " CONCRETE SUPPLIER: TXI PLACEMENT DATE: 09/13/2000 BATCHTIME: 3:08p PLA~rr: 41 TIME SAMPLED: 3:50p BY: Roy Montgomery SPECIFICATION REQUIREMENTS WEATHER coNa)rrloNs: Clear STREN(;TH: 4000 psi @ 28 Days TEMPERATURE (~- AIR 90 F COts'CRETE: 91 F SLUMP: 3-5" TRUCK NO: N/A TICKET NO: N/A AIR: N/A AIR CONTENT (%): N/A UNiT WEIGHT (pc0: N/A TEST METIIOD: ASTM C-143 PLACEMENT LOCATION: See page 1 ASTM C-172 ASTM C-39 SAMPLE LOCATION: Grid line A/9 REPORT OF TESTS ACCUMULATIVE YARDS: 100 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 2 I 6.00 09/20/2000 7 97170 3440 2 2 6.00 09/20/2000 7 92280 3260 Average 3350 2 3 6.00 10/11/2000 28 112630 3980 2 4 6.00 10/! 1/2000 28 114660 4050 Average 4020 Technician: Roy Montgomery Started: 12:00p Finished: 4:30p ~~Eng' Report Distribution: lneerlng,' Inc. (1) St. Ann's Catholic Community (1) Datum Engineering, Inc. (!) Centex Construction (1) City of Coppell Eric J. Cleveland, P.E. (I) City of Coppell Senior Project Engineer (1) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC En~n~ering, Inc. 01SDS Page 2 of 2