MA 96/97-CS 970506 Abcon Paving, Inc.
1045 E Hvvy. 121
Lewisville, Texas 75057
May 6, 1997
City of Coppell
Engineering Department
P.O. Box 478
Coppell, Texas 75019
Attn: Mr. Ken Griffin
RE: Price Adjustment
Reinforced Concrete Repairs
Bid No. Q-0196-01
Dear Mr. Griffin:
Abcon Paving would like to be considered for a price redetermination
for the above referenced project. Labor costs have risen in the past
year, and there has been a considerable rise in material costs.
We are asking for a price increase of $9.00 per square yard. There-
fore the new price will be $52.50 per square yard.
· cerely
James O. Jenkins
Pre s ident
LewisWile - (214) 221-7535... Metro - 12 141 434-2811... Arlington - (817) 275-2292... l -800-369-9328