Loading...
MA 96/97-CS 970506 Abcon Paving, Inc. 1045 E Hvvy. 121 Lewisville, Texas 75057 May 6, 1997 City of Coppell Engineering Department P.O. Box 478 Coppell, Texas 75019 Attn: Mr. Ken Griffin RE: Price Adjustment Reinforced Concrete Repairs Bid No. Q-0196-01 Dear Mr. Griffin: Abcon Paving would like to be considered for a price redetermination for the above referenced project. Labor costs have risen in the past year, and there has been a considerable rise in material costs. We are asking for a price increase of $9.00 per square yard. There- fore the new price will be $52.50 per square yard. · cerely James O. Jenkins Pre s ident LewisWile - (214) 221-7535... Metro - 12 141 434-2811... Arlington - (817) 275-2292... l -800-369-9328