Loading...
St Ann Catholic-LR001003CONCRETE COMPRESSIVE STRENGTH TE . £ a divL~ion of']~tl"~ 8901 Carpenter Frwy., Suite #100 DnlIn% Texas 75247 Date of Service: 09/01/2000 Report No.: 0023000 Report Date 10/03/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian B roderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Centex Construction MIX I.D.: N/A CONCRETE SUPPLIER: TXI PLACEMENT DATE: 09/01/2000 BATCH TIME: N/A PLANT: 38 TnVmSAMPLED: 2:00pm BY: Shane Spinks SPECIFICATION REQUIREMENTS WEATHER CON~DITIONS: Sunny, warm STREN(;TH: 3000 psi @ 28 Days TEMPEaATURE (~3- Am 103 g CONCRETe: 98 g SLUblP: 3-5" TRUCK NO: N/A TICKET NO: N/A AIR: N/A AIR CO~r~NT (%): 1.2 uNrr WEIGHT (pcf): N/A TEST METHOD: ASTM C- 143 PLACEMEt~r LOCATION: Pier information and technician time: Sec Report g0022999 ASTM C-172 ASTM C-39 SAMPLE LOCATION: B-I.5. D-i.5, E-I.5 REPORT OF TESTS ACCL iULATIVE YARDS: 10 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 I 6.25 09/08/2000 7 95250 3370 1 2 6.25 09/08/2000 7 91980 3250 Average 3310 I 3 6.25 09/29/2000 28 108910 3850 1 4 6.25 09/29/2000 28 110110 3890 Average 3870 Technician: Shane Spinks Started: Finished: ~~ngin Report Distribution: eering, Inc. (I) St. Ann's Catholic Community (I) Datum Engineering, Inc. (1) Centex Construction (I) City of Coppell "~ Er~c J. Cleveland, P.E. (1) City of Coppcll Senior Project Engineer (1) Alliance Architects This report is exclusively for the usc of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 1 of 1 'CONCRETE COMPR',.3SIVE STRENGTH ~NGINF_.ERLX~, INC. a division of'l~--~glgl 8901 Carpenter Frwy., Suite #100 , Dallan, Texas 75247 Date of Service: 08/31/2000 Report No.: 0022852 Report Date 10/03/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Centex Construction MIX I.D.: N/A CONCRETE SUPPLIER: TXI PLACEMENT DATE: 08/3 1/2000 BATCH TIME: N/A PLANT: 38 TIME SAMPLED: 6:35am BY: Shane Spinks SPECIFICATION REQUIREMEN~rs WEATHER CONDITIONS: Clear STRENG~: 3000 psi @ 28 Days TEMPERATURE (V) - AIR 81 V CONCP~: 79 F SLL~P: 3-5" TRUCK NO: N/A TICKET NO: N/A AIR: N/A AIR CONTENT (%): 1.9 UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C-143 PLACEMENT LOCATION: Slab-on-grade ASTM C- 172 ASTM C-39 SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 30 CYLINDER MEASURED MAXLMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 N/A 09/07/2000 7 94140 3330 1 2 N/A 09/07/2000 7 97300 3440 Average 3390 I 3 N/A 09/28/2000 28 104750 3700 1 4 N/A 09/28/2000 28 104880 37 l0 Average 3710 Sample location: 20' N x 10' E of SW corner of slab-on-grade This report is exclusively for thc use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 1 of 2 · CONCRETE COMPRLSSIVE STRENGTH a division of'lrmmmn 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 08/31/2000 Report No.: 0022852 Report Date 10/03/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Centex Construction MIX I.D.: N/A CONCRETE SUPPLIER: TXI PLACEMENT DATE: 08/31/2000 BATCH TIME: N/A PLANT: 38 T~tE SA.~n'LED: 10:30am BY: Shane Spinks SPECIFICATION' REQUIREMENTS V(EATHER CONDITIONS: Sunny, warm STRENGTm 3000 psi @ 28 Days TESU'ERAT-ORE (F) -AIR 87 F CON'CRETw: 85 F SLUMP: 3-5" TRUCK NO: N/A TICKET NO: N/A AIR: N/A AIR CoN~rEwr (%): N/A UNIT WEIGHT (pcf): N/A TEST METIIOD: ASTM C- 143 PLACEMENT LOCATION: See page 1 ASTM C- 172 ASTM C-39 SAMPLE LOCATION': See below REPORT OF TESTS ACCUMULATIVE YARDS: 1 10 CYLINDER MEASURED MAXIML%I COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 2 1 6.00 09/07/2000 7 107300 3790 2 2 6.00 09/07/2000 7 105120 3720 Average 3760 2 3 6.00 09/28/2000 28 114750 4060 2 4 6.00 09/28/2000 28 114880 4060 Average 4060 Sample location: 20' S x 10' W of NE corner slab-on-grade Technician: ShaneSpinks Started: 5:00am Finished: 12:00pm ~ Report Distribution: ngineering, Inc. (I) St. Ann's Catholic Community (1) Datum Engineering, Inc. (1) Centex Construction (1) City of Coppell Eric J. Cleveland, P.E. (1) City of Coppell Senior Project Engineer (1) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 2 of 2