Loading...
St Ann Catholic-LR001002CONCRETE COMPR 'SIVE STRENGTH TES'-' a division 8901 Carpenter Frwy., Suite #100 Dallas, Texa~ 75247 Date of Service: 08/30/2000 Report No.: 0022751 Report Date 10/02/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Centex Construction snx I.D.: N/A CONCRETE SUPPLIER: TXI PLACEMEN~r DATE: 08/30/2000 BATCH TL~IE: N/A pLa:xrr: 38 TR~,IE SAMPLED: 4:00pm BY: Shane Spinks SPECIFICATION REQUIRESIEN'rS WEATHER CONDITIONS: Sunny, warm STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F). AIR 105 F CONCRETE: 99 g SLL3.IP: 3-5" TRUCK NO: N/A TICKET NO: N/A AIR: N/A AIR CONTENT (%): 1.5 L';'NIT WEIGHT (pc/): N/A TEST METHOD: ASTM C- 143 PLACE,'~IE,¥r LOCATION: Pier information and technician time: See Report 00022750 ASTM C-172 ASTM C-39 SA.~LPLE LOCATION: B.2-1, B.3-1, B.4-1 REPORT OF TESTS ACCIw%IULATIVE YARDS: 10 CYLINDER NIEASURED MAXIMI~WI COMPRESSIVE MARKED SLL~IP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE I 1 5.50 09/06/2000 7 91120 3220 1 2 5.50 09/06/2000 7 89050 3150 Average 3190 1 3 5.50 09/27/2000 28 125960 4450 I 4 5.50 09/27/2000 28 117180 4140 Average 4300 Technician: Shane Spinks Started: Finished: '/~~~gi~neerin Report Distribution: g~ Inc. (I) St. Ann's Catholic Community. { 1) Datum Engineering, Inc. ( 1 ) Centex Construction (1) Cit).' of Coppell Eric J. Cleveland, P.E. ( 1 ~ CiO' of Coppell Senior Project Engineer ( 1 ) Alliance Architects This report is exclusively for the use of thc client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 1 of 1 CONCRETE COMPI $SIVE STRENGTH TE ,.,t a division of ] ~ 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 08/29/2000 Report No.: 0022646 Report Date 10/02/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Centex Construction MIX I.D.: N/A CONCRETE SUPPLIER: TXI PLACEMENT DATE: 08/29/2000 BATCH T~IE: N/A PLANT: 38 TIME SAMPLED: 4:00pm BY: Shane Spinks SPECIFICATION REQUIREMEN~I'S WEATHER CONDITIONS: Sunny, warm STRENGTH: 4000 psi @ 28 Days TEMPERATURE (F)- AIR 104 F CONCRETE: 98 F SLU3,iP: 3-5" TRUCK NO: N/A TICKET NO: N/A AIR: N/A AIR CONTENT (%): I. 1 UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C-143 PLACEMENT LOCATION: Shear wall ASTM C-172 ASTM C-39 SAMPLE LOCATION: G.5-17 REPORT OF TESTS ACCU.MULATIVE YARDS: 10 CYLINDER MEASURED $-L~. XI~-IUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTIt FILa. CTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 6.00 09/05/2000 7 91620 3240 1 2 6.00 09/05/2000 7 96830 3420 Average 3330 1 3 6.00 09/26/2000 28 141470 5000 1 4 6.00 09/26/2000 28 140210 4960 Average 4980 Technician: Shane Spinks Started: 3:30pm Finished: 5:00pm -'~ Report Distribution: /..~/ .Engineering, Inc. (1) St. Ann's Catholic Community (1) Datum Engineering, Inc. ~""~'~_' ~-'~,,." (1) Centex Construction (I) City of Coppell "~ Eric J. Cleveland, P.E. (1) City of Coppell Senior Project Engineer (1) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering. Inc. 01LL Page 1 of I CONCRETE COMPR,_$SIVE STRENGTH TEL £ a division of'l~ 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 08/29/2000 Report No.: 0022635 Report Date 10/02/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Centex Construction MIX I.D.: N/A CONCRETE SUPPLIER: TXI PLACEMENT DATE: 08/29/2000 BATCH TIME: 3:45pm PLANT: 38 TIME SAMPLED: 4:30pm BY: Shane Spinks SPECIFICATION REQUIREMENTS WEATHER CONOITIOSS: Sunny, warm STRESGTI& 3000 psi @ 28 Days T£MPERA~t~RE (F)- AIR 104 F CONCRETV,: 97 F SLUMP: 3-5" TRUCK NO: N/A TICKET NO: N/A AIR: N/A AIR CONTENT (%): 1.3 UNIT WEIGHT (pcf): N/A TEST METIIOD: ASTM C-143 PLACEMENT LOCATION: Pier information and technician time: See Report #0022634 ASTM C-172 ASTM C-39 SAMPLE LOCATION: L.8-1.5, K-I.5,M.5-1.5 REPORT OF TESTS ACCUMULATIVE YARDS: 10 CYLINDER MEASURED ~XE~CU ..%I COMPRESSIVE ~L.~RKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 I 5.50 09/05/2000 7 97890 3460 1 2 5.50 09/05/2000 7 100000 3540 Average 3500 1 3 5.50 09/26/2000 28 136340 4820 1 4 5.50 09/26/2000 28 135970 4810 Average 4820 Technician: Shane Spinks Started: Finished: gineering, Inc. Report Distribution: ~_..~'/ 'L~- L" (1) St. Ann's Catholic Community (1) Datum Engineering, Inc. ~ (1) Centex Construction (1) City of Coppell Eric J. Cleveland, P.E. ( 1 ) City of Coppeli Senior Project Engineer ( 1 ) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wrinen approval of HBC Engineering, Inc. 0ILL Page 1 of 1