St Ann Catholic-LR001002CONCRETE COMPR 'SIVE STRENGTH TES'-'
a division
8901 Carpenter Frwy., Suite #100
Dallas, Texa~ 75247
Date of Service: 08/30/2000 Report No.: 0022751 Report Date
10/02/2000
Client No.: 2310 Project No.: 94001152
Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church
Attn: Monsignor Kilian Broderick 180 Samuel Boulevard
180 Samuel Boulevard
Coppell TX 75019 Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: Centex Construction snx I.D.: N/A
CONCRETE SUPPLIER: TXI PLACEMEN~r DATE: 08/30/2000 BATCH TL~IE: N/A
pLa:xrr: 38 TR~,IE SAMPLED: 4:00pm BY: Shane Spinks
SPECIFICATION REQUIRESIEN'rS WEATHER CONDITIONS: Sunny, warm
STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F). AIR 105 F CONCRETE: 99 g
SLL3.IP: 3-5" TRUCK NO: N/A TICKET NO: N/A
AIR: N/A AIR CONTENT (%): 1.5 L';'NIT WEIGHT (pc/): N/A
TEST METHOD: ASTM C- 143 PLACE,'~IE,¥r LOCATION:
Pier information and technician time: See Report 00022750
ASTM C-172
ASTM C-39
SA.~LPLE LOCATION: B.2-1, B.3-1, B.4-1
REPORT OF TESTS ACCIw%IULATIVE YARDS: 10
CYLINDER NIEASURED MAXIMI~WI COMPRESSIVE
MARKED SLL~IP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
I 1 5.50 09/06/2000 7 91120 3220
1 2 5.50 09/06/2000 7 89050 3150
Average 3190
1 3 5.50 09/27/2000 28 125960 4450
I 4 5.50 09/27/2000 28 117180 4140
Average 4300
Technician: Shane Spinks Started: Finished: '/~~~gi~neerin
Report Distribution: g~ Inc.
(I) St. Ann's Catholic Community. { 1) Datum Engineering, Inc.
( 1 ) Centex Construction (1) Cit).' of Coppell Eric J. Cleveland, P.E.
( 1 ~ CiO' of Coppell Senior Project Engineer
( 1 ) Alliance Architects
This report is exclusively for the use of thc client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
01LL Page 1 of 1
CONCRETE COMPI $SIVE STRENGTH TE ,.,t
a division of ] ~
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 08/29/2000 Report No.: 0022646 Report Date
10/02/2000
Client No.: 2310 Project No.: 94001152
Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church
Attn: Monsignor Kilian Broderick 180 Samuel Boulevard
180 Samuel Boulevard
Coppell TX 75019 Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: Centex Construction MIX I.D.: N/A
CONCRETE SUPPLIER: TXI PLACEMENT DATE: 08/29/2000 BATCH T~IE: N/A
PLANT: 38 TIME SAMPLED: 4:00pm BY: Shane Spinks
SPECIFICATION REQUIREMEN~I'S WEATHER CONDITIONS: Sunny, warm
STRENGTH: 4000 psi @ 28 Days TEMPERATURE (F)- AIR 104 F CONCRETE: 98 F
SLU3,iP: 3-5" TRUCK NO: N/A TICKET NO: N/A
AIR: N/A AIR CONTENT (%): I. 1 UNIT WEIGHT (pcf): N/A
TEST METHOD: ASTM C-143 PLACEMENT LOCATION:
Shear wall
ASTM C-172
ASTM C-39
SAMPLE LOCATION: G.5-17
REPORT OF TESTS ACCU.MULATIVE YARDS: 10
CYLINDER MEASURED $-L~. XI~-IUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTIt FILa. CTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
1 1 6.00 09/05/2000 7 91620 3240
1 2 6.00 09/05/2000 7 96830 3420
Average 3330
1 3 6.00 09/26/2000 28 141470 5000
1 4 6.00 09/26/2000 28 140210 4960
Average 4980
Technician: Shane Spinks Started: 3:30pm Finished: 5:00pm -'~
Report Distribution: /..~/ .Engineering, Inc.
(1) St. Ann's Catholic Community (1) Datum Engineering, Inc. ~""~'~_' ~-'~,,."
(1) Centex Construction (I) City of Coppell "~ Eric J. Cleveland, P.E.
(1) City of Coppell Senior Project Engineer
(1) Alliance Architects
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering. Inc.
01LL Page 1 of I
CONCRETE COMPR,_$SIVE STRENGTH TEL £
a division of'l~
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 08/29/2000 Report No.: 0022635 Report Date
10/02/2000
Client No.: 2310 Project No.: 94001152
Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church
Attn: Monsignor Kilian Broderick 180 Samuel Boulevard
180 Samuel Boulevard
Coppell TX 75019 Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: Centex Construction MIX I.D.: N/A
CONCRETE SUPPLIER: TXI PLACEMENT DATE: 08/29/2000 BATCH TIME: 3:45pm
PLANT: 38 TIME SAMPLED: 4:30pm BY: Shane Spinks
SPECIFICATION REQUIREMENTS WEATHER CONOITIOSS: Sunny, warm
STRESGTI& 3000 psi @ 28 Days T£MPERA~t~RE (F)- AIR 104 F CONCRETV,: 97 F
SLUMP: 3-5" TRUCK NO: N/A TICKET NO: N/A
AIR: N/A AIR CONTENT (%): 1.3 UNIT WEIGHT (pcf): N/A
TEST METIIOD: ASTM C-143 PLACEMENT LOCATION:
Pier information and technician time: See Report #0022634
ASTM C-172
ASTM C-39
SAMPLE LOCATION: L.8-1.5, K-I.5,M.5-1.5
REPORT OF TESTS ACCUMULATIVE YARDS: 10
CYLINDER MEASURED ~XE~CU ..%I COMPRESSIVE
~L.~RKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
1 I 5.50 09/05/2000 7 97890 3460
1 2 5.50 09/05/2000 7 100000 3540
Average 3500
1 3 5.50 09/26/2000 28 136340 4820
1 4 5.50 09/26/2000 28 135970 4810
Average 4820
Technician: Shane Spinks Started: Finished: gineering, Inc.
Report Distribution: ~_..~'/ 'L~- L"
(1) St. Ann's Catholic Community (1) Datum Engineering, Inc. ~
(1) Centex Construction (1) City of Coppell Eric J. Cleveland, P.E.
( 1 ) City of Coppeli Senior Project Engineer
( 1 ) Alliance Architects
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wrinen approval of HBC Engineering, Inc.
0ILL Page 1 of 1