St Ann Catholic-LR000927CONCRETE COMPR.JSSIVE STRENGTH TE,_,.£
EIqCiLNF_Y_.RLx~, ING
a division of~"-~
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 08/28/2000 Report No.: 0022495 Report Date
09/27/2000
Client No.: 2310 Project No.: 94001152
Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church
Attn: Monsignor Kilian Broderick 180 Samuel Boulevard
180 Samuel Boulevard
Coppell TX 75019 Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: Centex Construction MIX I.D.: N/A
CONCRETE SUPPLIER: TXI PLACEMENT DATE: 08/28/2000 BATCH TIME: N/A
PLANT: 41 Tl~m SAMPLED: 3:45pm BY: Shane Spinks
SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Sunny, warm
STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F)- AIR 103 V CONCRETE: 95 V
SLUMP: 3-5" TRUCK NO: N/A TICKET NO: N/A
AIR: N/A AIR CONTENT (%): 1.8 UNIT WEIGIlT (pcf): N/A
TEST METHOD: ASTM C-143 PLACEMENT LOCATION:
Pier information and technician time: Sec Report #0022494
ASTM C~172
ASTM C-39
SAMPLE LOCATION: P-l, 0.9-1, N.5-1
REPORT OF TESTS ACCUMULATIVE YARDS: 10
CYLINDER MEASURED MAXD, IUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
I I 5.25 09/04/2000 7 101750 3600
1 2 5.25 09/04/2000 7 102330 3620
Average 3610
I 3 5.25 09/25/2000 28 118200 4180
I 4 5.25 09/25/2000 28 115250 4080
Average 4130
Technician: Shane Spinks Started: Finished:
Report Distribution: eering, Inc.
(I) St. Ann's Catholic Community (l) Datum Engineering. Inc.
(I) Centex Construction (1) City of Coppell Eric J. Cleveland, P.E.
(I) City of Coppell Senior Project Engineer
(I) Alliance Architects
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
0ILL Page 1 of 1