St Ann Catholic-LR000926"REPORT OF DRILLEo BELLED PIER INSPE, TION a division 8901 Carpenter Frwy., Suite #10~ Dallas, Texas 7524' Date of Service: 08/30/2000 Report No.: 0022750 Report Date 09/26/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Brodcrick 180 Samuel Boulevard 180 Samuel Boulevard Coppeli TX 75019 Coppell, Texas Services: Drilled belled pier inspection. On this date, an HBC Engineering technician arrived at the above referenced jobsite as scheduled for drilled belled pier inspection. See attached sheet for recorded data. Technician Time: 6:00 a.m. to 6:00 p.m. Report Distribution: ( I ) St. Ann's Catholic Community (I) Datum Engineering, Inc. ( I ) Centex Construction (I) City of Coppell Eric J. Cleveland, P.E. (I) City of Coppell Senior Project Engineer (!) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 99SDS PaRe 1 of 1 ~NGINEERING, INC. 8901 Caq~ate-F~/y.. Suite #100 Dallas, Texas 75247 Project:St. ^nn's Catholic Church Report No.: 0022750 180 Samuel Boulevard, Coppell, Texas Date of Service: 08/30/00 Project So.: 94001152 Technician:S. Spinks Driller: N.L. Schutte Page: 1 of 1 Pier Identification B.2-1 B.3-1 B.4-1 8.5-1 H-1 A-1.4 A-1.7 A.9-1.7 A.9-1.5 ] Pier Diameter (in.) 30 30 30 30 30 24 24 18 18 Bell Diameter (in.) 66 66 66 66 66 54 54 48 48 Top of Pier Elevation (ft) 97,0 97,0 97.0 97.0 97,0 97,0 97.0 97.0 97,0 Req. Depth from Exist. Grade (ft) 8.0 8.0 8.0 8.0 8.0 8.0 8.0 8.0 8.0 Initial Depth of Pier from Existing Grade (ft) 16.9 17.0 17.5 17.0 16.0 17.0 16.2 17.8 17.6 Final Depth of Pier from Existing Grade (ft) 17.3 17.2 17.5 17.0 16.1 17.3 16.2 17.8 17.7 Depth from Top of Concrete (ft) 15.3 15.2 15.5 15.0 14.1 15.3 14.2 15.8 15.7 Condition of Bottom (wet or dry) Dry Dry Dry Dry Dry Dry Dry Dry Dry Plumb Within Tolerance (yes or no) Yes Yes Yes Yes Yes Yes Yes Yes Yes Casing Diameter (in) N/A N/A N/A N/A N/A N/A N/A N/A N/A Cased Depth (ft) N/A N/A N/A N/A N/A N/A N/A N/A N/A Number of Vertical Bars (ea.) 6 6 6 6 6 6 6 6 6 Reinforcing Bar Size (#) 7 7 7 7 7 7 7 7 7 Length of Vertical Bars (ft.) 14.8 14.7 15.0 14.5 13.6 14.8 14.2 15.3 15.2 Time Drilling was Completed 12:00p.m. 12:45p.m. 1:30p.m. 2:00p.m. 2:15p.m. 9:45a.m. 10:20a.m. 11:00a.m. 11:30a..m. Time Concrete was Placed 3:00 p.m. 3:15 p.m. 3:45 p.m. 4:00 p.m. 4:15 p.m. 4:30 p.m. 4:45 p.m. 5:00 p.m. 5:30 p.m. CONCRETE COMPR. SSIVE STRENGTH TE , £ a division 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 08/25/2000 Report No.: 0022349 Report Date 09/26/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Centex Construction MIX I.D.: N/A CONCRETE SUPPLIER: TXI PLACEMENT DATE: 08/25/2000 BATCII TIME: 3:00pm PLANT: 38 TIME SAMPLED: 3:30pm BY: Shane Spinks SPECIFICATION REQUIREMENTS WEATIIER CONDITIONS: Sunny, warm STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F)- AIR 101 F CONCRETE: 93 F SLUMP: 3-5" TRUCK NO: N/A TICKET NO: N/A AIR: N/A AIR CONTENT (%): 1.4 UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Pier information and technician time: See Report gO022318 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: H-0.5,H.5-0.5, 1.5-0.5 REPORT OF TESTS ACCUMULATIVE YARDS: 10 CYLLNDER MEASURE. I) 5Ls, XIML~,! COMPRESSIVE I~LARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE I 1 5.00 09/01/2000 7 109560 3870 1 2 5.00 09/01/2000 7 113360 4010 Average 3940 1 3 5.00 09/22/2000 28 128500 4540 1 4 5.00 09/22/2000 28 132780 4700 Average 4620 Technician: Shane Spinks Started: Finished: Report Distribution.' Inc. (I) St. Ann's Catholic Community (I) Datum Engineering, Inc. (I) Centex Construction (I) City of Coppell Eric J. Cleveland, P.E. (I) City of Coppell Senior Project Engineer (I) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 1 of I CONCRETE COMPI ,SSIVE STRENGTH TEo F a division of 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 08/25/2000 Report No.: 0022319 Report Date 09/26/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Centex Construction MIX I.D.: 9506 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 08/25/2000 BATCH TLXIE: N/A PLANT: 41 TIME SAMPLED: 3:30pm BY: Shane Spinks SPECIFICATION REQUIREMEN'FS WEATHER CONDITIONS: Sunny, warm STRENGTIt: 3000 psi @ 28 Days TEMPERATURE (F) - AIR 103 F CONCRETE: 95 F SLUMP: 3-5" TRUCK NO: N/A TICKET NO: N/A AIR: N/A AIR CONTENT (%): 1.3 UNIT WEIGIIT (pcf): N/A TEST METIIOD: ASTM C- 143 PLACEMENT LOCATION: Pier information and technician time: See Report #0022318 ASTM C-172 ASTM C-39 SAMPLE LOCATION: J.5-.5, 1.5-.5, H.5-5 REPORT OF TESTS ACCL.'.%IULATIVE YARDS: 10 CYLINDER MEASURED i~LS, XIM bq~l COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FP~.s, CTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 I 4.75 09/01/2000 7 107390 3800 1 2 4.75 09/01/2000 7 109680 3880 Average 3840 1 3 4.75 09/22/2000 28 151540 5360 1 4 4.75 09/22/2000 28 150110 5310 Average 5340 Technician: Shane Spinks Started: Finished: ~l~ ~'~ Report Distribution: (1) St. Ann's Catholic Community (1) Datum Engineering, Inc. (!) Centex Construction (1) City of Coppell Eric J. Cleveland, P.E. (!) City of Coppell Senior Project Engineer (I) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without Ihe written approval of HBC Engineering, Inc. 01LL Page 1 of 1 REPORT OF DRILLE BELLED PIER INSPE . FION a division of ~lff'dC~ 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 08/23/2000 Report No.: 0022100 Report Date 09/26/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Drilled belled pier inspection. On this date, an HBC Engineering technician arrived at the above referenced jobsite as scheduled for drilled belled pier inspection. See attached sheet for recorded data. Technician Time: 6:00 a.m. to 5:00 p.m. Technician: Shane Spinks ~E~~ng, Inc. Report Distribution: (1) St. Ann's Catholic Community (1) Datum Engineering. Inc. (1) Centex Construction (1) City of Coppell Eric J. Cleveland, P.E. (1) City of Coppell Senior Project Engineer (1) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering. Inc. 99SDS Pa~e 1 of I ENGINEERING, INC. 8901 Cat~n~' Frwy.. Suite #100 Dallas, Texas 75247 Project: SI:. Anrt's C;~I:ho]ic ChUl'ch Report No.: 0022[00 180 Samuel Boulevard, Coppell, Texas Date of Service: 08/23/00 projeetuo.: 94001152 Technician: S. Spinks Driller: N.L. Schutte Page: I of 1 Pierldentification R-I. O.0- I Pier Diameter (in.) 30 30 30 30 24 ' Bell Diameter (in.) 60 60 60 66 54 Top of Pier Elevation (ft) 97.0 97.0 97.0 97.0 97.0 Req. Depth from Exist. Grade (ft) 8.0 8.0 8.0 8.0 8.0 Initial Depth of Pier from Existing Grade (ft) 16.3 16.3 16.3 16.3 16.4 Final Depth of Pier from Existing Grade (ft) 16.3 16.4 16.3 16.4 16.4 Depth from Top of Concrete (ft) 14.3 14.4 14.3 14.4 14.4 Condition of Bottom (wet or dry) Dry Dry Dry Dry Dry Plumb Within Tolerance (yes or no) Yes Yes Yes Yes Yes Casing Diameter (in) N/A N/A N/A N/A N/A Cased Depth (ft) N/A N/A N/A N/A N/A Number of Vertical Bars (ea.) 6 6 6 6 6 Reinforcing Bar Size (#) 8 8 8 8 8 Length of Vertical Bars (ft.) 16.5 16.5 16.5 16.5 16.5 Time Drilling was Completed 11:40 a.m. 1:00 p.m. 1:30 p.m. 2:40 p.m. 3:00 p.m. Time Concrete was Placed 2:50 p.m. 2:55 p.m. 3:00 p.m. 3:05 p.m. 3:30 p.m.