St Ann Catholic-LR000925CONCRETE COMPR',,.JSIVE STRENGTH TEL .,'
a division of
8901 Carpenter grwy., Suite #100
Dallas, Texas 75247
Date of Service: 08/24/2000 Report No.: 0022224 Report Date
09/25/2000
Client No.: 2310 Project No.: 94001152
Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church
Attn: Monsignor Kilian Broderick 180 Samuel Boulevard
180 Samuel Boulevard
Coppell TX 75019 Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRnCTOa: Centex Construction MIX I.D.: N/A
CONCRETE SUPPLIER: TXI PLACEMENT DATE: 08/24/2000 BATCH TIME: N/A
PLANT: 38 TIME SAMPLED: 3:00pm BY: Shane Spinks
SPECIFICATION REQUIREMENTS WEATHER Co~rrIoNS: Sunny, warm
STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F) - AIR 101 r CONCRETe.: 95 g
SLU'MP: 3-5" TRUCK NO: N/A TICKET NO: N/A
AIR: N/A AIR CON'rEN'r (%): .8 UNIT WEIGHT (pcf): N/A
TEST METHOD: ASTM C- 143 PLACE,~m~'r LOCATION:
Pier information and technician time: See Report #0022223
ASTM C-172
ASTM C-39
SAMPLE LOCATION: A-3.7, A-3.6, C-3.9, C-3.88
REPORT OF TESTS ACCUMULATIVE YARDS: l0
CYLINDER MEASURED MAX~IUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
I I 5.75 08/31/2000 7 76520 2710
I 2 5.75 08/31/2000 7 78300 2770
Average 2740
1 3 5.75 09/21/2000 28 105090 3720
1 4 5.75 09/21/2000 28 106570 3770
Average 3750
Technician: Shane Spinks Started.' Finished: ~n
Report Distribution-- eering, Inc.
(I) St. Ann's Catholic Community (1) Datum Engineering, Inc.
(I) Centex Construction ( 1 ) City of Coppell Eric J. Cleveland, P.E.
(I) City of Coppell Senior Project Engineer
(I) Alliance Architects
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
01LL Page 1 of 1