Loading...
St Ann Catholic-LR000925CONCRETE COMPR',,.JSIVE STRENGTH TEL .,' a division of 8901 Carpenter grwy., Suite #100 Dallas, Texas 75247 Date of Service: 08/24/2000 Report No.: 0022224 Report Date 09/25/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRnCTOa: Centex Construction MIX I.D.: N/A CONCRETE SUPPLIER: TXI PLACEMENT DATE: 08/24/2000 BATCH TIME: N/A PLANT: 38 TIME SAMPLED: 3:00pm BY: Shane Spinks SPECIFICATION REQUIREMENTS WEATHER Co~rrIoNS: Sunny, warm STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F) - AIR 101 r CONCRETe.: 95 g SLU'MP: 3-5" TRUCK NO: N/A TICKET NO: N/A AIR: N/A AIR CON'rEN'r (%): .8 UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C- 143 PLACE,~m~'r LOCATION: Pier information and technician time: See Report #0022223 ASTM C-172 ASTM C-39 SAMPLE LOCATION: A-3.7, A-3.6, C-3.9, C-3.88 REPORT OF TESTS ACCUMULATIVE YARDS: l0 CYLINDER MEASURED MAX~IUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE I I 5.75 08/31/2000 7 76520 2710 I 2 5.75 08/31/2000 7 78300 2770 Average 2740 1 3 5.75 09/21/2000 28 105090 3720 1 4 5.75 09/21/2000 28 106570 3770 Average 3750 Technician: Shane Spinks Started.' Finished: ~n Report Distribution-- eering, Inc. (I) St. Ann's Catholic Community (1) Datum Engineering, Inc. (I) Centex Construction ( 1 ) City of Coppell Eric J. Cleveland, P.E. (I) City of Coppell Senior Project Engineer (I) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 1 of 1