Loading...
St Ann Catholic-LR000921 cONCRETE COMPR SIVE STRENGTH TE ' a division 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 09/13/2000 Report No.: 0023946 Report Date 09/21/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Centex Construction MIX I.D.: 8205 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 09/13/2000 BATCH TI3,1E: PLANT: 41 TIblE SAMPLED: l:50p BY: Roy MontgomeD' SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear STRENGTH: 4000 psi @ 28 Days TEMPERATURE (F) - AIR 90 F CONCRETE: 90 F SLUMP: 3-5" TRUCKNO: 937 TICKETNO: 2733626 AIR: N/A AIR CONTENT (%): N/A UNIT WEIGHT (pc0: N/A TEST METHOD: ASTM C-143 PLACEMENT LOCATION: Grade Beams at line 4.7, lines A-B; line 10.5, lines Y-A: line A, lines 8.4-10..5; line Y, ASTM C-172 lines 8.8-10.5: line X, lines 7-8.8; line 7. lines X-A; line A. lines 8.4-4.7 and line B, lines ASTM C-39 4.3-6.8 SAMPLE LOCATION: Grid line B/4.5 REPORT OF TESTS ACCU%'IULAT[VE YA"I)S: CYLINDER MEASURED MAXDAUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 5.50 09/20/2000 7 99940 3530 1 2 5.50 09/20/2000 7 102280 3620 Average 3580 I 3 5.50 10/11/2000 28 I 4 5.50 10/11/2000 28 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01SDS Page 1 of 2 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 09/13/2000 Report No.: 0023946 Report Date 09/21/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA COIN'TRACTOR: Centex Construction MIX I.D.: 8205 CONCRETE SUPPLIER: TX! PLACEMENT DATE: 09/13/2000 BATCH TrME: 3:08p PLANT: 41 TIME SAMPLED: 3:50p BY: Roy Montgomery SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear STRENGTIt: 4000 psi @ 28 Days TEMPERATURE (F)- AIR 90 F CONCRETE: 91 F SLU'blP: 3-5" TRUCK NO: N/A TICKET NO: N/A AIR: N/A AIR CONTENT (%): N/A UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Sec page I ASTM C-172 ASTM C-39 SAMPLE LOCATION: Grid line A/9 REPORT OF TESTS ACCUMULATIYE YARDS: 100 CYLINDER MEASURED MAXD, IL~I COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FIL~,CTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 2 1 6.00 09/20/2000 7 97170 3440 2 2 6.00 09/20/2000 7 92280 3260 Average 3350 2 3 6.00 10/11/2000 28 2 4 6.00 10/11/2000 28 Roy Montgomery Started: 12:00p Finished: 4:30p ~~~Engi Technician: Report Distribution: neerino,~ Inc. (i) St. Ann's Catholic Community (1) Datum Engineering, Inc. ( i ) Centex Construction (1) City of Coppell Eric J. Cleveland, P.E. (i) City of Coppell Senior Project Engi neet (I) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01SDS Page 2 of 2 CONCRETE COMPRi $SIVE STRENGTH TE , .' ~LNF_Y_RLxl3, II~C. a division of'l~--~lll 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 08/23/2000 Report No.: 0022101 Report Date 09/21/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Centex Construction MIX I.D.: 9506 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 08/23/2000 BATClI TIME: l:55pm PLANT: 41 TIME SAMPLEO: 3:05pm l~Y: Shane Spinks SPECIFICATION REQUIREMENTS WEATHER CO~ITIONS: Sunny, warm STREN(;'m: 3000 psi @ 28 Days TEMPERATURE (r)- AIR 104 r CONCRETe: 93 r SLIJ3iP: 3-5" TRUCK NO: 803 TICKET ~'O: 27175 77 AIR: N/A AIR CONTENT (%): 1.9 UNIT WEIGIIT (pcf): N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Piers ASTM C-172 ASTM C-39 SAMPLE LOCATION: R-I.5,R-1.8, P-3, 0.9-3 REPORT OF TESTS ACCt~UL:LATIVE YARDS: 10 CYLINDER MEASURED I~L~ XIML'.%I COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE I 1 4.50 08/30/2000 7 93420 3300 1 2 4.50 08/30/2000 7 90740 3210 Average 3260 1 3 4.50 09/20/2000 28 132870 4700 1 4 4.50 09/20/2000 28 135130 4780 Average 4740 Technician: Shane Spinks Started: 3:00pm Finished: 4:30pm ~neering, Inc. Report Distribution: ( 1 ) St. Ann's Catholic Community (I) Datum Engineering, Inc. (1) Centex Construction (1) City of Coppell Eric J. Cleveland, P.E. (1) City of Coppcll Senior Project Engineer ( I ) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 1 of 1 CONCRETE COMPRL. JSIVE STRENGTH TES l' a division of '[ 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 08/22/2000 Report No.: 0021977 Report Date 09/21/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Centex Construction MIX I.D.: 8205 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 08/22/2000 BATCHTIME: 12:43pm PLANT: 41 TIME SAMPLED: l:lSpm BY: Marlo Villanueva SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Partly cloudy STRENGTH: 4000 psi @ 28 Days TEMPERATURE (F)- AIR 99 F CONCRETE: 93 ~' SLt~tP: 3-5" TgUCK NO: 642 TICKET NO: 2716419 AIR: 3-6% AIR CONTENT (%): 4.7 VNIT WEIGIIT (pcf): N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Grade beam on Lines 11.1/C.6-D6, 10.5-11 .I/C.6. 10.5/A-C.6, 8.4-10.5/A, 8.4/A-B. ASTM C- 172 6.8-8.4/B, 6.8/B-D.8 ASTM C-39 SAMPLE LOCATION: Grid Line 11.1/C.6-D.6 REPORT OF TESTS ACCL~fL'LATIVE YARDS: l0 CYLINDER MEASURED MAXLM-u%I COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 5.50 08/29/2000 7 75270 2660 1 2 5.50 08/29/2000 7 84200 2980 Average 2820 1 3 5.50 09/19/2000 28 117930 4170 I 4 5.50 09/19/2000 28 117320 4150 Average 4160 Technician: MarioVillanueva Started: l:00pm Finished: 3:30pm '~-~~ng' Report Distribution: meering, Inc. ( 1 ) St. Ann's Catholic Community (1) Datum Engineering. Inc. (1) Centex Construction (1) City of Coppell Eric J. Cleveland, P.E. (1) City of Coppell Senior Project Engineer (!) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 1 of I