Loading...
St Ann Catholic-LR000919"CONCRETE COMPR _3SIVE STRENGTH TE a division ofl[art-~zon 8901 Carpenter Frwy., Suite #I00 Dallan, Texas 75247 Date of Service: 08/31/2000 Report No.: 0022852 Report Date 09/19/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Centex Construction MIX I.D.: N/A CONCRETE SUPPLIER: TXI PLACEMENT DATE: 08/31/2000 BATCH TIME: N/A PLANT: 38 TE%.IE SAMPLED: 6:35am BY: Shane Spinks SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear STRENGTH: 3000 psi @ 28 Days TEMPERAiXIRE (F). AIR 81 F CONCRETe.: 79 F SLU~-fP: 3-5" TRUCK NO: N/A TICKET NO: N/A AIR: N/A AIR CONTENT (%): 1.9 UNIT WEIGIIT (pcf): N/A TEST METIIOD: ASTM C-143 PLACEMENT LOCATION: S lab-on-grade ASTM C- 172 ASTM C-39 SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 30 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FILz, CTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE I 1 N/A 09/07/2000 7 94140 3330 1 2 N/A 09/07/2000 7 97300 3440 Average 3390 I 3 N/A 09/28/2000 28 1 4 N/A 09/28/2000 28 Sample location: 20' N x 10' E of SW corner of slab-on-grade This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 1 of 2 'CONCRETE COMPRL.-/SIVE STRENGTH TEL a division of I~=fr"~ZI~ 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 08/31/2000 Report No.: 0022852 Report Date 09/19/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Centex Construction MIX I.D.: N/A CONCRETE SUPPLIER: TXI PLACEMENT DATE: 08/31/2000 BATCH TIblE: N/A PLANT: 38 TrME SAMPLED: 10:30am aY: Shane Spinks SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Sunny, warm STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F)- AIR 87 F CONCRETE: 85 F SLLIblP: 3-5" TRUCK NO: N/A TICKET NO: N/A AIR: N/A AIR CONTENT (%): N/A UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C- 143 PLACEMEN'T LOCATION: See page 1 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: See below REPORT OF TESTS ACCU*'IULATIVE YARDS: 1 l0 CYLINDER MEASURED MAXIMUM COMPRESSIVE bLS, RI(ED SLUblP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 2 1 6.00 09/07/2000 7 107300 3790 2 2 6.00 09/07/2000 7 105120 3720 Average 3760 2 3 6.00 09/28/2000 28 2 4 6.00 09/28/2000 28 Sample location: 20' S x 10' W of NE corner slab-on-grade Technician: ShaneSpinks Started: 5:00am Finished: 12:00pm /~~e Report Distribution: ering, Inc. (1) St. Ann's Catholic Community (1) Datum Engineering, Inc. (I) Centex Construction (1) City of Coppell Eri~ J. Cleveland, P.E. (I) City of Coppell Senior Project Engineer (I) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc, 01LL Page 2 of 2