St Ann Catholic-LR000914CONCRETE COMPRLoSIVE STRENGTH TEE
09-20-00A09:45 RCVD adivisionofl~rl-~l=on
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 09/01/2000 Report No.: 0023000 Report Date
09/14/2000
Client No.: 2310 Project No.: 94001152
Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church
Attn: Monsignor Kilian Broderick 180 Samuel Boulevard
180 Samuel Boulevard
Coppell TX 75019 Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: Centex Construction MIX I.D.: N/A
CONCRETE SUPPLIER: TXI PLACEMENT DATE: 09/01/2000 BATC}~ TIME: N/A
PLANT: 38 TI3,1ESAMPLED: 2:00pm BY: Shane Spinks
SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Sunny, warm
STRENC, Tm 3000 psi @ 28 Days TEMPE~O, TUP~
SLUMP: 3-5" TRUCK NO: N/A TICKET NO: N/A
AIR: N/A .AIR CONTERT (~): 1.2 UNIT WEIGHT (pcf): N/A
TESI METIiOD: ASTM C- 143 PLACEMENT LOCATION:
Pier information and technician time: See Report #0022999
ASTM C-172
ASTM C-39
SAMPLE LOCATION: B-I.5. D-I.5. E-I.5
REPORT OF TESTS ACCUMULATIVE YARDS: l0
CYLINDER MEASURED MAXIMLIM COMPRESSIVE
MARKED SLU%'IP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
I 1 6.25 09/08/2000 7 95250 3370
I 2 6.25 09/08/2000 7 91980 3250
Average 3310
I 3 6.25 09/29/2000 28
I 4 6.25 09/29/2000 28
Technician: Shane Spinks Started: Finished: ~r
Report Distribution: ' ing, Inc.
(1) St. Ann's Catholic Community (1) Datum Engineering. Inc.
(1) Centex Construction (1) Ci~' of Coppell Eric J. Cleveland, P.E.
(1) City of Coppell Senior Project Engineer
( 1 ) Alliance Architects
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.