Loading...
St Ann Catholic-LR000914CONCRETE COMPRLoSIVE STRENGTH TEE 09-20-00A09:45 RCVD adivisionofl~rl-~l=on 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 09/01/2000 Report No.: 0023000 Report Date 09/14/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Centex Construction MIX I.D.: N/A CONCRETE SUPPLIER: TXI PLACEMENT DATE: 09/01/2000 BATC}~ TIME: N/A PLANT: 38 TI3,1ESAMPLED: 2:00pm BY: Shane Spinks SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Sunny, warm STRENC, Tm 3000 psi @ 28 Days TEMPE~O, TUP~ SLUMP: 3-5" TRUCK NO: N/A TICKET NO: N/A AIR: N/A .AIR CONTERT (~): 1.2 UNIT WEIGHT (pcf): N/A TESI METIiOD: ASTM C- 143 PLACEMENT LOCATION: Pier information and technician time: See Report #0022999 ASTM C-172 ASTM C-39 SAMPLE LOCATION: B-I.5. D-I.5. E-I.5 REPORT OF TESTS ACCUMULATIVE YARDS: l0 CYLINDER MEASURED MAXIMLIM COMPRESSIVE MARKED SLU%'IP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE I 1 6.25 09/08/2000 7 95250 3370 I 2 6.25 09/08/2000 7 91980 3250 Average 3310 I 3 6.25 09/29/2000 28 I 4 6.25 09/29/2000 28 Technician: Shane Spinks Started: Finished: ~r Report Distribution: ' ing, Inc. (1) St. Ann's Catholic Community (1) Datum Engineering. Inc. (1) Centex Construction (1) Ci~' of Coppell Eric J. Cleveland, P.E. (1) City of Coppell Senior Project Engineer ( 1 ) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page I of 1