Loading...
St Ann Catholic-LR000912'CONCRETE COMPRL 4SIVE STRENGTH TEb ,' ENGINEF_RING, INC. a division ofl[n~c~ 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 08/30/2000 Report No.: 0022751 Report Date 09/12/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Centex Construction MIX I.D.: N/A CONCRETE SUPPLIER: TXI PLACEMENT OATE: 08/30/2000 haTCH TIME: N/A PLANT: 38 TIME SAMPLED: 4:00pm nY: Shane Spinks SPECIFICATION REQUIREMEN'rs WEATHER CONDITIONS: Sunny, warm STRENI;TII: 3000 psi @ 28 Days TEMPEi~TUm~ (F). AIR 105 F CONCRETE: 99 F SLUMP: 3-5" TRUCKNO: N/A TICKETNO: N/A AIR: N/A AIR CONTENT (%): 1.5 UNIT WEIGHT (pcO: N/A TEST METIIOD: ASTM C- 143 PLACEMENT LOCATION: Pier information and technician time: See Reixm n0022750 ASTM C-172 ASTM C-39 SAMPLE LOCATION: B.2-1. B.3-1, B.4-1 REPORT OF TESTS ACCmWLATIV . YA S: 10 CYLINDER MEASURED MAXLMUM COMPRESSIVE I~tARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 5.50 09/06/2000 7 91120 3220 I 2 5.50 09/06/2000 7 89050 3150 Average 3190 1 3 5.50 09/27/2000 28 I 4 5.50 09/27/2000 28 Technician: Shane Spinks Started: Finished: ~e Report Distribution: erlng, Inc. (1) St. Ann's Catholic Community (I) Datum Engineering, Inc. (1) Centex Construction (I) City of Coppell Eric J. Cleveland, P.E. (1) City of Coppell Senior Project Engineer (1) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 1 of I :CONCRETE COMPRi 3SIVE STRENGTH TEL a division of l~a'r"~l:ori 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 08/29/2000 Report No.: 0022635 Report Date 09/12/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Centex Construction MIX I.D.: N/A CONCRETE SUPPLIER: TXI PLACEMENT DATE: 08/29/2000 BATCI! TLME: 3:45pm PLANq': 38 TIME SAMPLED: 4:30pm BY: Shane Spinks SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Sunny, warm STRENGTH: 3000 psi @ 28 Days TEMPEIL~,.TURE (F)- AIR 104 F CONCRETE: 97 E SLUMP: 3-5" TRUCK NO: N/A TICKET NO: N/A AIR: N/A AIR CONTENT (%): 1.3 UNIT WEIGItT (pcf): N/A TEST METllOD: ASTM C- 143 PLACEMENT LOCATION: Pier information and technician time: See Report #0022634 ASTM C-172 ASTM C-39 SAMPLE LOCATION: L.8-1.5, K-1.5,M.5-1.5 REPORT OF TESTS ACCUMULATIVE YARDS: 10 CYLINDER MEASURED ~NLa, X I~lU3'I COMPRESSIVE MARKED SLUMP DATE AGE LOAD SIRENGTIt FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE I I 5.50 09/05/2000 7 97890 3460 I 2 5.50 09/05/2000 7 100000 3540 Average 3500 I 3 5.50 09/26/2000 28 1 4 5.50 09/26/2000 28 Technician: Shane Spinks Started: Finished: ~~ginee Report Distribution: ~ ngineering, Inc. (1) St. Ann's Catholic Community (I) Datum Engineering, Inc. (I) Centex Construction (I) City of Coppell . nd, P.E. (I) Cit3' of Coppell Senior Project Engineer (I) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. OILI~ Page 1 of 1 :CONCRETE COMPR, 3SIVE STRENGTH TE . £ a division of]~nac_nn 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 08/29/2000 Report No.: 0022646 Report Date 09/12/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA Co;¥rRACTOR: Centex Construction MIX I.D.: N/A CONCRETE SUPPLIER: TXI PLACEMENT DATE: 08/29/2000 ~ATCH TI.TIE: N/A I'I~ANT: 38 TIME SAMPLED: 4:00pm ~Y: Shane Spinks SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Sunny, warm STREN(;TII: 4000 psi @ 28 Days TEMPERATURE (F)-AIR 104 V CONCRETE: 98 r SLUMP: 3-5" TRUCK NO: N/A TICKET NO: N/A AIR: N/A AIR CONTENT (%): 1. l UNIT WEIGIIT (pcf): N/A TEST METHOD: ASTM C-143 PLACEMENT LOCATION: Shear wall ASTM C-172 ASTM C-39 SAMPLE LOCATION: G.5-17 REPORT OF TESTS ACCUMULATIVI';YARDS: 10 CYLINDER MEASURED MAXD, IUM COMPRESSIVE ~.LS. RKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE I I 6.00 09/05/2000 7 91620 3240 I 2 6.00 09/05/2000 7 96830 3420 Average 3330 I 3 6.00 09/26/2000 28 I 4 6.00 09/26/2000 28 Technician:Report Distribution:Shane Spinks Started: 3:30pm Finished: 5:00pm '~ng, Inc. (1) St_ Ann's Catholic Community (I) Datum Engineering, Inc. (1) Centex Construction (!) City of Coppell Eric J. Cleveland, P.E. (l) City of Coppell Senior Project Engineer (1) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 1 of 1 'CONCRETE COMPRL3SIVE STRENGTH TEL .' a division of'lkwt-'~c~ 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 08/28/2000 Report No.: 0022495 Report Date 09/12/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Centex Construction MIX I.D.: N/A CONCRETE SUPPLIER: TXI PLACEMENT DATE: 08/28/2000 BATCIt TIME: N/A PLA.'~r: 41 TIMESAMI~LED: 3:45pm BY: Shane Spinks SPECIFICATION REQUIREMENTS WF~&THER CO,¥OITIONS: Sunny, warm STRENGTn: 3000 psi @ 28 Days TEMPERATURE (F) - AIR 103 F CONCRETE: 95 F SLtmlP: 3-5" TRUCK NO: N/A TICICET NO: N/A AIR: N/A AIR CONTENT (%): 1.8 UNIT WEIGIII (pcB: N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Pier information and technician time: See Report #0022494 ASTM C-172 ASTM C-39 SAMPLE I,OCATION: P-I, 0.9-1, N.5-1 REPORT OF TESTS ACCU.~IUL:mvz YAm~S: 10 CYLINDER MEASURED MAXI~IUM COMPRESSIVE MARKED SLIJMP DATE AGE LOAD STRENGTII FI~&CTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE I I 5.25 09/04/2000 7 101750 3600 1 2 5.25 09/04/2000 7 102330 3620 Average 3610 1 3 5.25 09/25/2000 28 1 4 5.25 09/25/2000 28 Technician: Shane Spinks Started: Finished: ~r Report Distribution: lng, Inc. (1) St. Ann's Catholic Community (1) Datum Engineering. Inc. (1) Centex Construction (1) City of Coppcll Eric J. Cleveland, P.E. (I) City of Copper Senior Project Engineer ( ! ) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 1 of I 'CONCRETE COMPR..SSIVE STRENGTH TE , 4' F_iXlGINF_~ERI~, I~. a division ofl~'-~laarl 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 08/25/2000 Report No.: 0022349 Report Date 09/12/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Centex Construction MIX I.D.: N/A CONCRETE SUPPLIER: TXI PLACEMENT DATE: 08/25/2000 BATCHTIME: 3:00pm PLANT: 38 TIME SAMPLED: 3:30pm aY: Shane Spinks SPECIFICATION REQUIREMENTS WEATHER CONOITIONS: Sunny, warm STRENGTII: 3000 psi @ 28 Days TEMPERATURE (F)- AIR 101 v CONCRETE: 93 V SLUMP: 3-5" TRUCK NO: N/A TICKET NO: N/A AIR: N/A AIR CONTENT (q~): 1.4 UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Pier information and technician time: See Report 00022318 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: H-0.5,H.5-0.5.1.5-0.5 REPORT OF TESTS ACCUMULATIVE YARDS: 10 CYLINDER MEASURED MAXI3-1U~-! COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 5.00 09/01/2000 7 109560 3870 1 2 5.00 09/01/2000 7 113360 4010 Average 3940 I 3 5.00 09/22/2000 28 I 4 5.00 09/22/2000 28 Technician: Shane Spinks Started: Finished: j~ngin Report Distribution: eering, Inc. (i) St. Ann's Catholic Community (I) Datum Engineering, Inc. ( I ) Centex Construction ( I ) City of Coppell Eric J. Cleveland. P.E. (I) City of Coppell Senior Project Engineer (!) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the w~itten approval of HBC Engineering, inc. 01LL Page I of I CONCRETE COMPRI oSIVE STRENGTH a division of 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 08/24/2000 Report No.: 0022224 Report Date 09/12/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Centex Construction MIX I.D.: N/A CONCRETE SUPPLIER: TXI PLACEMENT DATE: 08/24/2000 BATClI TI.TIE: N/A PLAN'r: 38 TIME SAMPLEO: 3:00pm BY: Shane Spinks SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Sunny, warm SXm~NaTH: 3000 psi @ 28 Days TEMPERATURE (V)- AIR 101 F CO,~CRETE: 95 g SLUMP: 3-5" TRUCK NO: N/A TICK~T,~O: N/A AIR: N/A AIR CONTENT (~/¢): .8 UNITWEIGIFF(pcf): N/A TEST METIIOD: ASTM C- 143 PLACEMEN~I' LOCATION: Pier information and technician time: See Report g0022223 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: A-3.7, A-3.6, C-3.9, C-3.88 REPORT OF TESTS ACCU -IL'LATIVE YARDS: l0 CYLINDER MEASURED .X~s, X LX UU3-1 COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE I 1 5.75 08/31/2000 7 76520 2710 1 2 5.75 08/31/2000 7 78300 2770 Average 2740 I 3 5.75 09/21/2000 28 I 4 5.75 09/21/2000 28 Technician: Shane Spinks Started: Finished: ~n · · Report Distribution: eerlng, Inc. (I) St. Ann's Catholic Community (l) Datum Engineering, Inc. (1 } Centex Construction (1) City of Coppell Eric J. Cleveland, P.E. (1) City of Coppell Senior Project Engineer (I) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page I of I