St Ann Catholic-LR000912'CONCRETE COMPRL 4SIVE STRENGTH TEb ,'
ENGINEF_RING, INC.
a division ofl[n~c~
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 08/30/2000 Report No.: 0022751 Report Date
09/12/2000
Client No.: 2310 Project No.: 94001152
Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church
Attn: Monsignor Kilian Broderick 180 Samuel Boulevard
180 Samuel Boulevard
Coppell TX 75019 Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: Centex Construction MIX I.D.: N/A
CONCRETE SUPPLIER: TXI PLACEMENT OATE: 08/30/2000 haTCH TIME: N/A
PLANT: 38 TIME SAMPLED: 4:00pm nY: Shane Spinks
SPECIFICATION REQUIREMEN'rs WEATHER CONDITIONS: Sunny, warm
STRENI;TII: 3000 psi @ 28 Days TEMPEi~TUm~ (F). AIR 105 F CONCRETE: 99 F
SLUMP: 3-5" TRUCKNO: N/A TICKETNO: N/A
AIR: N/A AIR CONTENT (%): 1.5 UNIT WEIGHT (pcO: N/A
TEST METIIOD: ASTM C- 143 PLACEMENT LOCATION:
Pier information and technician time: See Reixm n0022750
ASTM C-172
ASTM C-39
SAMPLE LOCATION: B.2-1. B.3-1, B.4-1
REPORT OF TESTS ACCmWLATIV . YA S: 10
CYLINDER MEASURED MAXLMUM COMPRESSIVE
I~tARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
1 1 5.50 09/06/2000 7 91120 3220
I 2 5.50 09/06/2000 7 89050 3150
Average 3190
1 3 5.50 09/27/2000 28
I 4 5.50 09/27/2000 28
Technician: Shane Spinks Started: Finished: ~e
Report Distribution: erlng, Inc.
(1) St. Ann's Catholic Community (I) Datum Engineering, Inc.
(1) Centex Construction (I) City of Coppell Eric J. Cleveland, P.E.
(1) City of Coppell Senior Project Engineer
(1) Alliance Architects
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
0ILL Page 1 of I
:CONCRETE COMPRi 3SIVE STRENGTH TEL
a division of l~a'r"~l:ori
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 08/29/2000 Report No.: 0022635 Report Date
09/12/2000
Client No.: 2310 Project No.: 94001152
Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church
Attn: Monsignor Kilian Broderick 180 Samuel Boulevard
180 Samuel Boulevard
Coppell TX 75019 Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: Centex Construction MIX I.D.: N/A
CONCRETE SUPPLIER: TXI PLACEMENT DATE: 08/29/2000 BATCI! TLME: 3:45pm
PLANq': 38 TIME SAMPLED: 4:30pm BY: Shane Spinks
SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Sunny, warm
STRENGTH: 3000 psi @ 28 Days TEMPEIL~,.TURE (F)- AIR 104 F CONCRETE: 97 E
SLUMP: 3-5" TRUCK NO: N/A TICKET NO: N/A
AIR: N/A AIR CONTENT (%): 1.3 UNIT WEIGItT (pcf): N/A
TEST METllOD: ASTM C- 143 PLACEMENT LOCATION:
Pier information and technician time: See Report #0022634
ASTM C-172
ASTM C-39
SAMPLE LOCATION: L.8-1.5, K-1.5,M.5-1.5
REPORT OF TESTS ACCUMULATIVE YARDS: 10
CYLINDER MEASURED ~NLa, X I~lU3'I COMPRESSIVE
MARKED SLUMP DATE AGE LOAD SIRENGTIt FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
I I 5.50 09/05/2000 7 97890 3460
I 2 5.50 09/05/2000 7 100000 3540
Average 3500
I 3 5.50 09/26/2000 28
1 4 5.50 09/26/2000 28
Technician: Shane Spinks Started: Finished: ~~ginee
Report Distribution: ~ ngineering, Inc.
(1) St. Ann's Catholic Community (I) Datum Engineering, Inc.
(I) Centex Construction (I) City of Coppell . nd, P.E.
(I) Cit3' of Coppell Senior Project Engineer
(I) Alliance Architects
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
OILI~ Page 1 of 1
:CONCRETE COMPR, 3SIVE STRENGTH TE . £
a division of]~nac_nn
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 08/29/2000 Report No.: 0022646 Report Date
09/12/2000
Client No.: 2310 Project No.: 94001152
Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church
Attn: Monsignor Kilian Broderick 180 Samuel Boulevard
180 Samuel Boulevard
Coppell TX 75019 Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
Co;¥rRACTOR: Centex Construction MIX I.D.: N/A
CONCRETE SUPPLIER: TXI PLACEMENT DATE: 08/29/2000 ~ATCH TI.TIE: N/A
I'I~ANT: 38 TIME SAMPLED: 4:00pm ~Y: Shane Spinks
SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Sunny, warm
STREN(;TII: 4000 psi @ 28 Days TEMPERATURE (F)-AIR 104 V CONCRETE: 98 r
SLUMP: 3-5" TRUCK NO: N/A TICKET NO: N/A
AIR: N/A AIR CONTENT (%): 1. l UNIT WEIGIIT (pcf): N/A
TEST METHOD: ASTM C-143 PLACEMENT LOCATION:
Shear wall
ASTM C-172
ASTM C-39
SAMPLE LOCATION: G.5-17
REPORT OF TESTS ACCUMULATIVI';YARDS: 10
CYLINDER MEASURED MAXD, IUM COMPRESSIVE
~.LS. RKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
I I 6.00 09/05/2000 7 91620 3240
I 2 6.00 09/05/2000 7 96830 3420
Average 3330
I 3 6.00 09/26/2000 28
I 4 6.00 09/26/2000 28
Technician:Report Distribution:Shane Spinks Started: 3:30pm Finished: 5:00pm '~ng, Inc.
(1) St_ Ann's Catholic Community (I) Datum Engineering, Inc.
(1) Centex Construction (!) City of Coppell Eric J. Cleveland, P.E.
(l) City of Coppell Senior Project Engineer
(1) Alliance Architects
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
0ILL Page 1 of 1
'CONCRETE COMPRL3SIVE STRENGTH TEL .'
a division of'lkwt-'~c~
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 08/28/2000 Report No.: 0022495 Report Date
09/12/2000
Client No.: 2310 Project No.: 94001152
Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church
Attn: Monsignor Kilian Broderick 180 Samuel Boulevard
180 Samuel Boulevard
Coppell TX 75019 Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: Centex Construction MIX I.D.: N/A
CONCRETE SUPPLIER: TXI PLACEMENT DATE: 08/28/2000 BATCIt TIME: N/A
PLA.'~r: 41 TIMESAMI~LED: 3:45pm BY: Shane Spinks
SPECIFICATION REQUIREMENTS WF~&THER CO,¥OITIONS: Sunny, warm
STRENGTn: 3000 psi @ 28 Days TEMPERATURE (F) - AIR 103 F CONCRETE: 95 F
SLtmlP: 3-5" TRUCK NO: N/A TICICET NO: N/A
AIR: N/A AIR CONTENT (%): 1.8 UNIT WEIGIII (pcB: N/A
TEST METHOD: ASTM C- 143 PLACEMENT LOCATION:
Pier information and technician time: See Report #0022494
ASTM C-172
ASTM C-39
SAMPLE I,OCATION: P-I, 0.9-1, N.5-1
REPORT OF TESTS ACCU.~IUL:mvz YAm~S: 10
CYLINDER MEASURED MAXI~IUM COMPRESSIVE
MARKED SLIJMP DATE AGE LOAD STRENGTII FI~&CTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
I I 5.25 09/04/2000 7 101750 3600
1 2 5.25 09/04/2000 7 102330 3620
Average 3610
1 3 5.25 09/25/2000 28
1 4 5.25 09/25/2000 28
Technician: Shane Spinks Started: Finished: ~r
Report Distribution: lng, Inc.
(1) St. Ann's Catholic Community (1) Datum Engineering. Inc.
(1) Centex Construction (1) City of Coppcll Eric J. Cleveland, P.E.
(I) City of Copper Senior Project Engineer
( ! ) Alliance Architects
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
0ILL Page 1 of I
'CONCRETE COMPR..SSIVE STRENGTH TE , 4'
F_iXlGINF_~ERI~, I~.
a division ofl~'-~laarl
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 08/25/2000 Report No.: 0022349 Report Date
09/12/2000
Client No.: 2310 Project No.: 94001152
Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church
Attn: Monsignor Kilian Broderick 180 Samuel Boulevard
180 Samuel Boulevard
Coppell TX 75019 Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: Centex Construction MIX I.D.: N/A
CONCRETE SUPPLIER: TXI PLACEMENT DATE: 08/25/2000 BATCHTIME: 3:00pm
PLANT: 38 TIME SAMPLED: 3:30pm aY: Shane Spinks
SPECIFICATION REQUIREMENTS WEATHER CONOITIONS: Sunny, warm
STRENGTII: 3000 psi @ 28 Days TEMPERATURE (F)- AIR 101 v CONCRETE: 93 V
SLUMP: 3-5" TRUCK NO: N/A TICKET NO: N/A
AIR: N/A AIR CONTENT (q~): 1.4 UNIT WEIGHT (pcf): N/A
TEST METHOD: ASTM C- 143 PLACEMENT LOCATION:
Pier information and technician time: See Report 00022318
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: H-0.5,H.5-0.5.1.5-0.5
REPORT OF TESTS ACCUMULATIVE YARDS: 10
CYLINDER MEASURED MAXI3-1U~-! COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
1 1 5.00 09/01/2000 7 109560 3870
1 2 5.00 09/01/2000 7 113360 4010
Average 3940
I 3 5.00 09/22/2000 28
I 4 5.00 09/22/2000 28
Technician: Shane Spinks Started: Finished: j~ngin
Report Distribution: eering, Inc.
(i) St. Ann's Catholic Community (I) Datum Engineering, Inc.
( I ) Centex Construction ( I ) City of Coppell Eric J. Cleveland. P.E.
(I) City of Coppell Senior Project Engineer
(!) Alliance Architects
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the w~itten approval of HBC Engineering, inc.
01LL Page I of I
CONCRETE COMPRI oSIVE STRENGTH
a division of
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 08/24/2000 Report No.: 0022224 Report Date
09/12/2000
Client No.: 2310 Project No.: 94001152
Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church
Attn: Monsignor Kilian Broderick 180 Samuel Boulevard
180 Samuel Boulevard
Coppell TX 75019 Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: Centex Construction MIX I.D.: N/A
CONCRETE SUPPLIER: TXI PLACEMENT DATE: 08/24/2000 BATClI TI.TIE: N/A
PLAN'r: 38 TIME SAMPLEO: 3:00pm BY: Shane Spinks
SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Sunny, warm
SXm~NaTH: 3000 psi @ 28 Days TEMPERATURE (V)- AIR 101 F CO,~CRETE: 95 g
SLUMP: 3-5" TRUCK NO: N/A TICK~T,~O: N/A
AIR: N/A AIR CONTENT (~/¢): .8 UNITWEIGIFF(pcf): N/A
TEST METIIOD: ASTM C- 143 PLACEMEN~I' LOCATION:
Pier information and technician time: See Report g0022223
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: A-3.7, A-3.6, C-3.9, C-3.88
REPORT OF TESTS ACCU -IL'LATIVE YARDS: l0
CYLINDER MEASURED .X~s, X LX UU3-1 COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
I 1 5.75 08/31/2000 7 76520 2710
1 2 5.75 08/31/2000 7 78300 2770
Average 2740
I 3 5.75 09/21/2000 28
I 4 5.75 09/21/2000 28
Technician: Shane Spinks Started: Finished: ~n
· ·
Report Distribution: eerlng, Inc.
(I) St. Ann's Catholic Community (l) Datum Engineering, Inc.
(1 } Centex Construction (1) City of Coppell Eric J. Cleveland, P.E.
(1) City of Coppell Senior Project Engineer
(I) Alliance Architects
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
01LL Page I of I