Loading...
St Ann Catholic-LR000911CONCRETE COMPRi.J3SIVE STRENGTH TEb; a division 8901 Carpenter Frwy., Suite #I00 Dallas, Texas 75247 Date of Service: 08/09/2000 Report No.: 0020784 Report Date 09/11/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Centex Construction MIX I.D.: N/A CONCRETE SUPPLIER: T×I PLACEMENT DATE: 08/09/2000 BATCII TI3IE: N/A m.A,xrr: N/A TIME SAMPLED: 3' 15pm !~¥: Shane Spinks SPECIFICATION REQUIREMENTS WEATIIER CONDITIONS: Sunny, warm STRENaTm 4000 psi @ 28 Days TEMPERATURE (B- AIR 10 F CONCRETE: 97 F SLU3IP: 3-5" TRUCK NO: N/A TICKET NO: N/A AIR: N/A AIR CONTENT (%): 1.7 UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Retaining wall ASTM C- 172 ASTM C-39 SAMPLE LOCATION: G- 10 to G-I 1.5 bottom 3' REPORT OF TESTS ACCIJMULATIVE YARDS: 10 CYLLNDER MEASURED .XL~, XD, tUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTII FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE I I N/A 08/16/2000 7 101410 3590 1 2 N/A 08/16/2000 7 96550 3410 Average 3500 I 3 N/A 09/06/2000 28 125570 4440 I 4 N/A 09/06/2000 28 122400 4330 Average 4390 Technician: Shane Spinks Started: 3:00pm Finished: 4:00pm ~'~~~~g Report Distribution: ~ Iflc. (I) St. Ann's Catholic Community (1) Datum Engineering, Inc. (I) Centex Construction (1) City of Coppell Eric J. Cleveland, P.E. ( I ) City of Coppell Senior Project Engineer (I) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 1 of 1 CONCRETE COMPRL$SIVE STRENGTH TE , .' a division of 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 08/09/2000 Report No.: 0020763 Report Date 09/11/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Centex Construction MIX I.D.: N/A CONCRETE SUPPLIER: TXI PLACEMEN'TDATE: 08/09/2000 BATCIITI3,IE: 9:20am PLANT: 38 TIME SAMPLED: 10:40am BY: Shane Spinks SPECIFICATION ILEQUIREMENTS WEATIIERCONDITIONS: Partly cloudy, warm STRENGTIh 3000 psi @ 28 Days TEMPERATURE (F)-AIR 95 F CONCRETE: 93 F SLUMP: 3-5" TRUCK NO: N/A TICKET NO: N/A AIR: N/A AIR CONTENT (%): 2.0 UNIT WEIGIIT (pcf): N/A TEST METHOD: ASTM C-143 PLACEMENT LOCATION: Pier RFI ASTM C-172 ASTM C-39 SAMPLE LOCATION: K-4.9 REPORT OF TESTS ACCWMULATIVE YARDS: l0 CYLINDER MEASURED MAXIMUM COMPRESSIVE biARKED SLUMP DATE AGE LOAD STRENGTII FR~XCTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 5.25 08/16/2000 7 111960 3960 I 2 5.25 08/16/2000 7 110040 3890 Average 3930 I 3 5.25 09/06/2000 28 139830 4940 I 4 5.25 09/06/2000 28 141630 5010 Average 4980 Technician: Shane Spinks Started: 12:00pm Finished: 2:00pm ~t~eering, Inc. Report Distribution: (1) St. Ann's Catholic Community (I) Datum Engineering, Inc. ( 1 ) Centex Construction (I) City of Coppell ~ Eric J. Cleveland, P.E. (I) City of Coppell Senior Project Engineer (I) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering. Inc. 01LL Page 1 of 1 CONCRETE COMPR $SIVE STRENGTH £ a division 8901 Carpenter Frwy., Suite gl00 Dallas, Texas 75247 Date of Service: 08/08/2000 Report No.: 0020640 Report Date 09/11/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Centex Construction MIX I.D.: 9506 CONCRETE SUPPLIER: TXI PLACEMENrF DATE: 08/08/2000 BATCII TI~Xm: 1 l:39am PLn~',~r: 41 TIME SAMPLED: l:00pm ~V: Ervin Farris SPECIFICATION REQUIREMENTS WEn'FIlER CONDI~rIONS: Clear STRENGTH: 3000 psi @ 28 Days T~MPE~,T~RE (F)- AIR 89 F CONCRETE: 90 F SLC.'*IP: 5-7" TRUCK NO: 641 T~C~:ET,~O: 2704052 AIR: N/A AIR CONTENT (%): N/A cNrr WEIGHT (pcf'): N/A TEST METItOD: ASTM C-143 PLACEMENT LOCATION: Pier information and technician time: See Report #0020639 ASTM C-172 ASTM C-39 SAMPLE LOCATION: F.5-4.9 REPORT OF TESTS ACCUMULATIVE YARDS: 10 CYLINDER MEASURED MAXE~gL~I COMPRESSIVE MARKED SLU3'IP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE I I 6.50 08/15/2000 7 78450 2770 1 2 6.50 08/15/2000 7 84810 3000 Average 2890 1 3 6.50 09/05/2000 28 121840 4310 1 4 6.50 09/05/2000 28 122400 4330 Average 4320 Technician: Ervin Farris Started: Finished: E~ ~l~J~ igineering, Inc. Report Distribution: (1) St. Ann's Catholic Community (1) Datum Engineering, Inc. (1) Centex Construction (1) City of Coppell Eric J. Cleveland, P.E. ( 1 ) City of Coppell Senior Project Engineer (I) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full withou! the written approval of HBC Engineering, Inc. 01LL Page 1 of I