St Ann Catholic-LR000911CONCRETE COMPRi.J3SIVE STRENGTH TEb;
a division
8901 Carpenter Frwy., Suite #I00
Dallas, Texas 75247
Date of Service: 08/09/2000 Report No.: 0020784 Report Date
09/11/2000
Client No.: 2310 Project No.: 94001152
Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church
Attn: Monsignor Kilian Broderick 180 Samuel Boulevard
180 Samuel Boulevard
Coppell TX 75019 Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: Centex Construction MIX I.D.: N/A
CONCRETE SUPPLIER: T×I PLACEMENT DATE: 08/09/2000 BATCII TI3IE: N/A
m.A,xrr: N/A TIME SAMPLED: 3' 15pm !~¥: Shane Spinks
SPECIFICATION REQUIREMENTS WEATIIER CONDITIONS: Sunny, warm
STRENaTm 4000 psi @ 28 Days TEMPERATURE (B- AIR 10 F CONCRETE: 97 F
SLU3IP: 3-5" TRUCK NO: N/A TICKET NO: N/A
AIR: N/A AIR CONTENT (%): 1.7 UNIT WEIGHT (pcf): N/A
TEST METHOD: ASTM C- 143 PLACEMENT LOCATION:
Retaining wall
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: G- 10 to G-I 1.5 bottom 3'
REPORT OF TESTS ACCIJMULATIVE YARDS: 10
CYLLNDER MEASURED .XL~, XD, tUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTII FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
I I N/A 08/16/2000 7 101410 3590
1 2 N/A 08/16/2000 7 96550 3410
Average 3500
I 3 N/A 09/06/2000 28 125570 4440
I 4 N/A 09/06/2000 28 122400 4330
Average 4390
Technician: Shane Spinks Started: 3:00pm Finished: 4:00pm ~'~~~~g
Report Distribution: ~ Iflc.
(I) St. Ann's Catholic Community (1) Datum Engineering, Inc.
(I) Centex Construction (1) City of Coppell Eric J. Cleveland, P.E.
( I ) City of Coppell Senior Project Engineer
(I) Alliance Architects
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
0ILL Page 1 of 1
CONCRETE COMPRL$SIVE STRENGTH TE , .'
a division of
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 08/09/2000 Report No.: 0020763 Report Date
09/11/2000
Client No.: 2310 Project No.: 94001152
Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church
Attn: Monsignor Kilian Broderick 180 Samuel Boulevard
180 Samuel Boulevard
Coppell TX 75019 Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: Centex Construction MIX I.D.: N/A
CONCRETE SUPPLIER: TXI PLACEMEN'TDATE: 08/09/2000 BATCIITI3,IE: 9:20am
PLANT: 38 TIME SAMPLED: 10:40am BY: Shane Spinks
SPECIFICATION ILEQUIREMENTS WEATIIERCONDITIONS: Partly cloudy, warm
STRENGTIh 3000 psi @ 28 Days TEMPERATURE (F)-AIR 95 F CONCRETE: 93 F
SLUMP: 3-5" TRUCK NO: N/A TICKET NO: N/A
AIR: N/A AIR CONTENT (%): 2.0 UNIT WEIGIIT (pcf): N/A
TEST METHOD: ASTM C-143 PLACEMENT LOCATION:
Pier RFI
ASTM C-172
ASTM C-39
SAMPLE LOCATION: K-4.9
REPORT OF TESTS ACCWMULATIVE YARDS: l0
CYLINDER MEASURED MAXIMUM COMPRESSIVE
biARKED SLUMP DATE AGE LOAD STRENGTII FR~XCTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
1 1 5.25 08/16/2000 7 111960 3960
I 2 5.25 08/16/2000 7 110040 3890
Average 3930
I 3 5.25 09/06/2000 28 139830 4940
I 4 5.25 09/06/2000 28 141630 5010
Average 4980
Technician: Shane Spinks Started: 12:00pm Finished: 2:00pm ~t~eering, Inc.
Report Distribution:
(1) St. Ann's Catholic Community (I) Datum Engineering, Inc.
( 1 ) Centex Construction (I) City of Coppell ~ Eric J. Cleveland, P.E.
(I) City of Coppell Senior Project Engineer
(I) Alliance Architects
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering. Inc.
01LL Page 1 of 1
CONCRETE COMPR $SIVE STRENGTH £
a division
8901 Carpenter Frwy., Suite gl00
Dallas, Texas 75247
Date of Service: 08/08/2000 Report No.: 0020640 Report Date
09/11/2000
Client No.: 2310 Project No.: 94001152
Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church
Attn: Monsignor Kilian Broderick 180 Samuel Boulevard
180 Samuel Boulevard
Coppell TX 75019 Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: Centex Construction MIX I.D.: 9506
CONCRETE SUPPLIER: TXI PLACEMENrF DATE: 08/08/2000 BATCII TI~Xm: 1 l:39am
PLn~',~r: 41 TIME SAMPLED: l:00pm ~V: Ervin Farris
SPECIFICATION REQUIREMENTS WEn'FIlER CONDI~rIONS: Clear
STRENGTH: 3000 psi @ 28 Days T~MPE~,T~RE (F)- AIR 89 F CONCRETE: 90 F
SLC.'*IP: 5-7" TRUCK NO: 641 T~C~:ET,~O: 2704052
AIR: N/A AIR CONTENT (%): N/A cNrr WEIGHT (pcf'): N/A
TEST METItOD: ASTM C-143 PLACEMENT LOCATION:
Pier information and technician time: See Report #0020639
ASTM C-172
ASTM C-39
SAMPLE LOCATION: F.5-4.9
REPORT OF TESTS ACCUMULATIVE YARDS: 10
CYLINDER MEASURED MAXE~gL~I COMPRESSIVE
MARKED SLU3'IP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
I I 6.50 08/15/2000 7 78450 2770
1 2 6.50 08/15/2000 7 84810 3000
Average 2890
1 3 6.50 09/05/2000 28 121840 4310
1 4 6.50 09/05/2000 28 122400 4330
Average 4320
Technician: Ervin Farris Started: Finished: E~ ~l~J~ igineering, Inc.
Report Distribution:
(1) St. Ann's Catholic Community (1) Datum Engineering, Inc.
(1) Centex Construction (1) City of Coppell Eric J. Cleveland, P.E.
( 1 ) City of Coppell Senior Project Engineer
(I) Alliance Architects
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full withou! the written approval of HBC Engineering, Inc.
01LL Page 1 of I