Loading...
St Ann Catholic-LR000907CONCRETE COMPRJ- SSIVE STRENGTH £ ~'NGLN'EERL'~, ~C. a division ofl~ ~901 Carpenter Frwy., Suite Dall~, Tex~ Date of Service: 08/25/2000 Report No.: 0022319 Report Date 09/07/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Centex Construction MIX I.D.: 9506 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 08/25/2000 BATCII Tiara: N/A PLANT: 41 TIME SAMPLED: 3:30pm nY: Shane Spinks SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Sunny, warm STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F)- AIR 103 r CONCRETE: 95 r SLUMP: 3-5" TRUCK NO: N/A TICKET NO: N/A AIR: N/A AIR CONTENT (%): !.3 UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Pier information and technician time: See Report #0022318 ASTM C-172 ASTM C-39 SAMPLE LOCATION: J.5-.5, 1.5-.5, H.5-5 REPORT OF TESTS ACCC*-I ATIVE VAleS: 10 CYLINDER MEASURED I~Ls, XIML.~! COMPRESSIVE l~LS, RKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE I I 4.75 09/01/2000 7 107390 3800 I 2 4.75 09/01/2000 7 109680 3880 Average 3840 I 3 4.75 09/29_/2000 28 1 4 4.75 09/22/2000 28 Technician: Shane Spinks Started: Finished: .//~~r Report Distribution: ing, Inc. (I) St. Ann's Catholic Community (I) Datum Engineering. Inc. (I) Centex Construction (1) City of Coppell ~ C,' Eric J. Cleveland P E (I) City of Coppell Senior Project Engineer (1) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 1 of 1