St Ann Catholic-LR000905CONCRETE COMPR IVE STRENGTH TES'-'
Im-'NCdN~, INC.
a division of~afi--~EEql
8901 Carpenter Fr~.-., Suite #100
~ Texas 75247
Date of Service: 08/22/2000 Report No.: 0021977 Report Date
09/05/2000
Client No.: 2310 Project No.: 94001152
Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church
Atto: Monsignor Kilian Brod~rick 180 Samuel Boulevard
180 Samuel Boulevard
Coppell TX 75019 Coppeli, Texas
Services: Obmm samples of fresh concrete at the placement locations: perform required field test and cast compressive
strength samples.
PROJECT DATA
CONXR-sc'roa: Centex Construction MiX ED.: 8205
CONCRETE SUPPLIER: TXI PLACEMENT DATE: 08/22/2000 B.¥rcn TIME: 12:43pm
PI,ANT: 41 'r~ME SAMPLED: 1: 18pm BY: Marlo Viilanueva
SP~:IFICATION REQUIREMENTS WEATHER CONDITIONS: FaulT' cloudy
sxR~x(;'rn: 4000 psi -~ 28 Days TEMPF,~nTURE ~)-nm 99 F CONCRETE: 93 V
' -" ~716419
SI.I'MP: 3-D TRUCK~O: 642 TICKETNO: _
AIR: 3-6% AIR CONTENT (%): 4.7 I-N~'r WEIGHT (~0: N/A
TEST NIETIIOI): ASTM C- 143 PLACEMENT L~:A'r[ox:
~a~ ~am on Lines 11. I C.6-D. 6. 10.5-11. I C.6. 10.5 A~.6. 8.4-10.5 .~ 8.4 .¥B.
ASTM C-172 6.~-s.n:r~. 6.~.-'B-O.~
ASTM C-39
SAMPI,E I,(~:ATION: Grid I,ine I 1.1/C.6-D.6
REPORT OF TESTS ACCI_'.XlI_-LATIVE YARDS: 10
CYLINDER .MEASURED MAXlNIUM (X)_M PRESSIVE
I~L~RKED SLUMP DATE AGE LOAD ST RENGTll F RA£.~I' U RI".
SET NO. (inche~) TESTED (days) Obs. force) (psi) TYPE
I I 5.50 08/29/2000 7 75270 2660
I 2 5.50 08/29/2000 7 84200 2980
Average 2820
I 3 5.50 09/19/2000 28
I 4 5.50 09/19/2000 28
Technician: Mario Villanueva Started: l:00pm Finished: 3:30pm /~~
Report Distribution: agineering, Inc.
( i ) st..Ann's Catholic Community ( I ) Datum Engincerin~ Inc.
(i) Centex Conslruaion (I) City of Coppell Eric J. Cleveland. P.E.
(I) City of Coppell Senior Project Engineer
(I) :Mliance .-Architects
This report is exclusively for the use of the client indicated alxwe and shall not be reproduced except in full x~ithout the wrilten approval of IIBC Engineering. Inc.
0ILL Page I of I
CONCRETE COMPRE3SIVE STRENGTH TES.'
ct division
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 08/18/2000 Report No.: 0021631 Report Date
09/05/2000
Client No.: 2310 Project No.: 94001152
Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church
Attn: Monsignor Kilian Broderick 180 Samuel Boulevard
180 Samuel Boulevard
Coppell TX 75019 Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: Centex Construction MtX I.D.: 8205
CONCRETE SUPPLIER: TXI PLACEMENT DATE: 08/18/2000 BATCH TIME: l:l lpm
PLANT: 41 TIME SAMPLED: 2:00pm BY: Greg Dimock
SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear
STRENGTH: 4000 psi @ 28 Days TEMPERATURE (F)- AIR 98 F CONCRETE: 96 F
SLL~-IP: 5.0" Max TRUCK NO: 715 TICKET NO: 2714303
AIR: 3-5% AIR CONTENT (%): 3.9 UNIT WEIGIIT (pcf):
TEST METIIOD: ASTM C- 143 PLACEMENT LOCATION:
Columns. basement to ground
ASTM C-172 level Ill 1,12,13 & basement wall [/10-K/12.5
ASTM C-39
Sampled from truck.
SAMPLE LOCATION: Colrnn Ill I
REPORT OF TESTS ACCUI~IULATIVE YARDS: 10
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTII FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
I I 5.50 08/25/2000 7 83930 2970
1 2 5.50 08/25/2000 7 84810 3000
Average 2990
1 3 5.50 09/15/2000 28
I 4 5.50 09/15/2000 28
Technician: Greg Dimock Started: l l:00am Finished: 3:30pm
Report Distribution: glneerlng~ Inc.
(1) st. Ann's Catholic Community (I) Datum Engineering, Inc.
(1) Centex Construction (I) City of Coppell Eric J. Cleveland, P.E.
( I ) City of Coppell Senior Project Engineer
( I ) Alliance Architects
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering. Inc.
0ILL Page 1 of 1
CONCRETE COMPRL3SIVE STRENGTH TE _ £
a division
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 08/18/2000 Report No.: 0021631 Report
Date
09/05/2000
Client No.: 2310 Project No.: 94001152
Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church
Attn: Monsignor Kilian Broderick 180 Samuel Boulevard
180 Samuel Boulevard
Coppell TX 75019 Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: Centex Construction MIX I.D.: 8205
CONCRETE SUPPLIER: TXI PLACEMENT DATE: 08/18/2000 BATCH TIME: 1: I lpm
PLANT: 41 TIbIESAMPLED: 2:00pm aY: GregDimock
SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear
STRENGTH: 4000 psi @ 28 Days TEr, U'ERATVRE (F)- AIR 98 F CONCRETE: 96 F
SLUbiP: 5.0" Max TRUCK NO: 715 TICKET NO: 2714303
AIR: 3-5% AIR CONTENT (%): 3.9 UNIT WEIGIIT (pcf): N/A
TEST METHOD: ASTM C- 143 PLACEMENT LOCATION:
Columns, basement to ground
ASTM C-172 level Fl 1,12.13 & basement wall 1/10-K/12.5
ASTM C-39
Sampled from truck.
SAMPLE LOCATION: Colmn I/11
REPORT OF TESTS ACCLi~,IULATIVE YARDS: 10
CYLINDER MEASURED MAXLMU~-I COMPRESSIVE
MARKED SLUbIP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
1 I 5.50 08/25/2000 7 83930 2970
1 2 5.50 08/25/2000 7 84810 3000
Average 2990
I 3 5.50 09/15/2000 28 144740 5120
1 4 5.50 09/15/2000 28 140240 4960
Average 5040
Technician: GregDimock Started: l l:00am Finished: 3:30pm ~~n
Report Distribution: eering, Inc.
(1) St. Ann's Catholic Community (1) Datum Engineering, Inc.
(I) Centex Construction (1) City of Coppell -- /-"' Eric J. Cleveland, P E
(1) City of Coppell Senior Project Engineer
(1) Alliance Architects
This report is exclusively for the use of the client indicated above and shall not be reprogtuced except in full without the written approval of HBC Engineering, Inc.
0ILL Page 1 of I
CONCRETE COMPR . SIVE STRENGTH TEb
I:NGLNEERLNG, INC.
a division of]~afg"~C~
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 08/03/2000 Report No.: 0020215 Report Date
09/05/2000
Client No.: 2310 Project No.: 94001152
Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church
Attn: Monsignor Kilian Broderick 180 Samuel Boulevard
180 Samuel Boulevard
Coppell TX 75019 Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: Centex Construction MIX I.D.: 9506
CO~CRET~ZS~JePLIER: TXI PLACEMENT DATE: 08/03/2000 BATCItTIME: 8:40am
PLAk-r: 41 TIME SAMPLED: 9:40am BY: Ervin Farris
SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear
STRE~{;TII: 3000 psi @ 28 Days TEMPERATURE(F)- AIR 83 F CONCRETE: 87 F
s~,w~P: 5 to 7" TRttCK.~O: 928 TICKET ~O: 2699818
AIR: N/A AIR CON-rENT (%): N/A UNIT WEIGHT (pcf): N/A
TEST METItOD: ASTM C- 143 PLACEMENT LOCATION:
Pier information and technician time: See Report g0020214
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: Q9-8.5
REPORT OF TESTS ACCUMULATIVE YARDS: 10
CYLINDER MEASURED S-L-~ X~,I/,~ l COMPRESSIVE
I~L~.RKED SLUMP DATE AGE LOAD STRENGTII FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
I 1 7.00 08/I0/2000 7 82860 2930
I 2 7.00 08/10/2000 7 87260 3090
Average 3010
1 3 7.00 08/31/2000 28 I 16050 4100
I 4 7.00 08/31/2000 28 117320 4150
Average 4130
Technician: Ervin Farris Started: Finished: ~e
Report Distribution: ' ering, Inc.
( I ) St. Ann's Catholic Community ( I ) Datum Engineering. Inc.
(I) Centex Construction (I) City of Coppell Eric J. Cleveland, P.E.
(I) City of Coppcll Senior Project Engineer
( I ) Alliance Architects
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering. Inc.
0ILL Page 1 of I
CONCRETE COMPRESSIVE STRENGTH TES 2
a division of'l~l'l~C~
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
Date of Service: 08/03/2000 Report No.: 0020229
09/05/2000
Client No.: 2310 Project No.: 94001152
Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church
Attn: Monsignor Kilian Broderick 180 Samuel Boulevard
180 Samuel Boulevard
Coppell TX 75019 Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: Centex Construction MIX I.D.: N/A
CONCRETE SUPPLIER: TXI PLnCl~MENT DATE: 08/03/2000 BATCh TIME: N/A
PLANT: 38 TIME SAMPLED: 3:40pm BY: Shane Spinks
SPECIFICATION REQUIREMEN'TS WEATHER CO~'mTIOXS: Sunny, warm
STRENGTIt: 3000 psi @ 28 Days TEMPEP, ATURE (F)- AIR 98 F CONCRETE: 94 F
SLUMP: 3-5" TRUCK NO: N/A IICKET NO: N/A
AIR: N/A AIR CONTENT (%): N/A UNIT WEIGHT {pcf): N/A
TEST METHOD: ASTM C-143 PLACEMENT LOCATION:
Piers
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: 0-5.4,0-5.2,0-5
REPORT OF TESTS ACC *WLATIVEV, m S: 10
CYLINDER MEASURED MAXLMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
I I 5.00 08/10/2000 7 62180 2200
1 2 5.00 08/10/2000 7 66660 2360
Average 2280
1 3 5.00 08/31/2000 28 93140 3290
1 4 5.00 08/31/2000 28 89050 3150
Average 3220
Technician: Shane Spinks Started: 3:30pm Finished: 4:00pm ~ ]~g~ngineering, Inc.
Report Distribution:
(I) St. Ann's Catholic Community (1) Datum Engineering, Inc.
(1) Centex Construction ( I ) City of Coppell Eric J. Cleveland, P.E.
~,1) City of Coppell Senior h'oject Engineer
(1) Alliance Architects
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of i-IBC Engineering. Inc.
0ILL Page I of I
CONCRETE COMPR ,.aSIVE STRENGTH TEL.
a division
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 08/03/2000 Report No.: 0020233 Report Date
09/05/2000
Client No.: 2310 Project No.: 94001152
Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church
Attn: Monsignor Kilian Broderick 180 Samuel Boulevard
180 Samuel Boulevard
Coppell TX 75019 Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: Centex Construction MLXI.D.: N/A
CONCRETE SUPPLIER: TXI PLACEMENT OAtE: 08/03/2000 BATCH T~XIE: N/A
PLANT: N/A TIME SAMPLED: 2:50pm BY: Shane Spinks
Sl'ECIFICATION REQUIREMENTS WEATHER CONDITIONS: Sunny, warm
STRENGTm 4000 psi @ 28 Days TEMPERATURE (F)- AIR 97 V CONCRETE: 94 F
SLUMP: 3-5" TRUCK NO: N/A TIClOZT NO: N/A
AIR: N/A AIR CONTENT (%): 2.3 UNIT WEIGIIT (pct'): N/A
TEST METHOD: ASTM C- 143 PLACEMENT LOCATION':
Grade beams
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: F- 19
REPORT OF TESTS ACCUMULATIVE YAP. OS: 10
CYLINDER MEASURED MAXLML31 COMPRESSIVE
MARKED SLL%IP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
1 I 5.00 08/10/2000 7 96690 3420
1 2 5.00 08/10/2000 7 95540 3380
Average 3400
I 3 5.00 08/31/2000 28 148700 5260
I 4 5.00 08/31/2000 28 145020 5 ! 30
Average 5200
Technician: Shane Spinks Started: 2:30pm Finished: 3:30pm E~--"/~~ lgineering, Inc.
Report Distribution:
(1) St_ Ann's Catholic Community (1) Datum Engineering, Inc.
(I) Centex Construction (I) City of Coppell Eric J. Cleveland, P.E.
(I) City of Coppcll Senior Project Engineer
( I )AIliancc Architects
This report is exclusively for the usc of thc client indicated above and shall not be reproduced except in full without thc written approval of HBC Engineering, Inc.