Loading...
St Ann Catholic-LR000905CONCRETE COMPR IVE STRENGTH TES'-' Im-'NCdN~, INC. a division of~afi--~EEql 8901 Carpenter Fr~.-., Suite #100 ~ Texas 75247 Date of Service: 08/22/2000 Report No.: 0021977 Report Date 09/05/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Atto: Monsignor Kilian Brod~rick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppeli, Texas Services: Obmm samples of fresh concrete at the placement locations: perform required field test and cast compressive strength samples. PROJECT DATA CONXR-sc'roa: Centex Construction MiX ED.: 8205 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 08/22/2000 B.¥rcn TIME: 12:43pm PI,ANT: 41 'r~ME SAMPLED: 1: 18pm BY: Marlo Viilanueva SP~:IFICATION REQUIREMENTS WEATHER CONDITIONS: FaulT' cloudy sxR~x(;'rn: 4000 psi -~ 28 Days TEMPF,~nTURE ~)-nm 99 F CONCRETE: 93 V ' -" ~716419 SI.I'MP: 3-D TRUCK~O: 642 TICKETNO: _ AIR: 3-6% AIR CONTENT (%): 4.7 I-N~'r WEIGHT (~0: N/A TEST NIETIIOI): ASTM C- 143 PLACEMENT L~:A'r[ox: ~a~ ~am on Lines 11. I C.6-D. 6. 10.5-11. I C.6. 10.5 A~.6. 8.4-10.5 .~ 8.4 .¥B. ASTM C-172 6.~-s.n:r~. 6.~.-'B-O.~ ASTM C-39 SAMPI,E I,(~:ATION: Grid I,ine I 1.1/C.6-D.6 REPORT OF TESTS ACCI_'.XlI_-LATIVE YARDS: 10 CYLINDER .MEASURED MAXlNIUM (X)_M PRESSIVE I~L~RKED SLUMP DATE AGE LOAD ST RENGTll F RA£.~I' U RI". SET NO. (inche~) TESTED (days) Obs. force) (psi) TYPE I I 5.50 08/29/2000 7 75270 2660 I 2 5.50 08/29/2000 7 84200 2980 Average 2820 I 3 5.50 09/19/2000 28 I 4 5.50 09/19/2000 28 Technician: Mario Villanueva Started: l:00pm Finished: 3:30pm /~~ Report Distribution: agineering, Inc. ( i ) st..Ann's Catholic Community ( I ) Datum Engincerin~ Inc. (i) Centex Conslruaion (I) City of Coppell Eric J. Cleveland. P.E. (I) City of Coppell Senior Project Engineer (I) :Mliance .-Architects This report is exclusively for the use of the client indicated alxwe and shall not be reproduced except in full x~ithout the wrilten approval of IIBC Engineering. Inc. 0ILL Page I of I CONCRETE COMPRE3SIVE STRENGTH TES.' ct division 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 08/18/2000 Report No.: 0021631 Report Date 09/05/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Centex Construction MtX I.D.: 8205 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 08/18/2000 BATCH TIME: l:l lpm PLANT: 41 TIME SAMPLED: 2:00pm BY: Greg Dimock SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear STRENGTH: 4000 psi @ 28 Days TEMPERATURE (F)- AIR 98 F CONCRETE: 96 F SLL~-IP: 5.0" Max TRUCK NO: 715 TICKET NO: 2714303 AIR: 3-5% AIR CONTENT (%): 3.9 UNIT WEIGIIT (pcf): TEST METIIOD: ASTM C- 143 PLACEMENT LOCATION: Columns. basement to ground ASTM C-172 level Ill 1,12,13 & basement wall [/10-K/12.5 ASTM C-39 Sampled from truck. SAMPLE LOCATION: Colrnn Ill I REPORT OF TESTS ACCUI~IULATIVE YARDS: 10 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTII FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE I I 5.50 08/25/2000 7 83930 2970 1 2 5.50 08/25/2000 7 84810 3000 Average 2990 1 3 5.50 09/15/2000 28 I 4 5.50 09/15/2000 28 Technician: Greg Dimock Started: l l:00am Finished: 3:30pm Report Distribution: glneerlng~ Inc. (1) st. Ann's Catholic Community (I) Datum Engineering, Inc. (1) Centex Construction (I) City of Coppell Eric J. Cleveland, P.E. ( I ) City of Coppell Senior Project Engineer ( I ) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering. Inc. 0ILL Page 1 of 1 CONCRETE COMPRL3SIVE STRENGTH TE _ £ a division 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 08/18/2000 Report No.: 0021631 Report Date 09/05/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Centex Construction MIX I.D.: 8205 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 08/18/2000 BATCH TIME: 1: I lpm PLANT: 41 TIbIESAMPLED: 2:00pm aY: GregDimock SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear STRENGTH: 4000 psi @ 28 Days TEr, U'ERATVRE (F)- AIR 98 F CONCRETE: 96 F SLUbiP: 5.0" Max TRUCK NO: 715 TICKET NO: 2714303 AIR: 3-5% AIR CONTENT (%): 3.9 UNIT WEIGIIT (pcf): N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Columns, basement to ground ASTM C-172 level Fl 1,12.13 & basement wall 1/10-K/12.5 ASTM C-39 Sampled from truck. SAMPLE LOCATION: Colmn I/11 REPORT OF TESTS ACCLi~,IULATIVE YARDS: 10 CYLINDER MEASURED MAXLMU~-I COMPRESSIVE MARKED SLUbIP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 I 5.50 08/25/2000 7 83930 2970 1 2 5.50 08/25/2000 7 84810 3000 Average 2990 I 3 5.50 09/15/2000 28 144740 5120 1 4 5.50 09/15/2000 28 140240 4960 Average 5040 Technician: GregDimock Started: l l:00am Finished: 3:30pm ~~n Report Distribution: eering, Inc. (1) St. Ann's Catholic Community (1) Datum Engineering, Inc. (I) Centex Construction (1) City of Coppell -- /-"' Eric J. Cleveland, P E (1) City of Coppell Senior Project Engineer (1) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reprogtuced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 1 of I CONCRETE COMPR . SIVE STRENGTH TEb I:NGLNEERLNG, INC. a division of]~afg"~C~ 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 08/03/2000 Report No.: 0020215 Report Date 09/05/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Centex Construction MIX I.D.: 9506 CO~CRET~ZS~JePLIER: TXI PLACEMENT DATE: 08/03/2000 BATCItTIME: 8:40am PLAk-r: 41 TIME SAMPLED: 9:40am BY: Ervin Farris SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear STRE~{;TII: 3000 psi @ 28 Days TEMPERATURE(F)- AIR 83 F CONCRETE: 87 F s~,w~P: 5 to 7" TRttCK.~O: 928 TICKET ~O: 2699818 AIR: N/A AIR CON-rENT (%): N/A UNIT WEIGHT (pcf): N/A TEST METItOD: ASTM C- 143 PLACEMENT LOCATION: Pier information and technician time: See Report g0020214 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: Q9-8.5 REPORT OF TESTS ACCUMULATIVE YARDS: 10 CYLINDER MEASURED S-L-~ X~,I/,~ l COMPRESSIVE I~L~.RKED SLUMP DATE AGE LOAD STRENGTII FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE I 1 7.00 08/I0/2000 7 82860 2930 I 2 7.00 08/10/2000 7 87260 3090 Average 3010 1 3 7.00 08/31/2000 28 I 16050 4100 I 4 7.00 08/31/2000 28 117320 4150 Average 4130 Technician: Ervin Farris Started: Finished: ~e Report Distribution: ' ering, Inc. ( I ) St. Ann's Catholic Community ( I ) Datum Engineering. Inc. (I) Centex Construction (I) City of Coppell Eric J. Cleveland, P.E. (I) City of Coppcll Senior Project Engineer ( I ) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering. Inc. 0ILL Page 1 of I CONCRETE COMPRESSIVE STRENGTH TES 2 a division of'l~l'l~C~ 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date Date of Service: 08/03/2000 Report No.: 0020229 09/05/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Centex Construction MIX I.D.: N/A CONCRETE SUPPLIER: TXI PLnCl~MENT DATE: 08/03/2000 BATCh TIME: N/A PLANT: 38 TIME SAMPLED: 3:40pm BY: Shane Spinks SPECIFICATION REQUIREMEN'TS WEATHER CO~'mTIOXS: Sunny, warm STRENGTIt: 3000 psi @ 28 Days TEMPEP, ATURE (F)- AIR 98 F CONCRETE: 94 F SLUMP: 3-5" TRUCK NO: N/A IICKET NO: N/A AIR: N/A AIR CONTENT (%): N/A UNIT WEIGHT {pcf): N/A TEST METHOD: ASTM C-143 PLACEMENT LOCATION: Piers ASTM C- 172 ASTM C-39 SAMPLE LOCATION: 0-5.4,0-5.2,0-5 REPORT OF TESTS ACC *WLATIVEV, m S: 10 CYLINDER MEASURED MAXLMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE I I 5.00 08/10/2000 7 62180 2200 1 2 5.00 08/10/2000 7 66660 2360 Average 2280 1 3 5.00 08/31/2000 28 93140 3290 1 4 5.00 08/31/2000 28 89050 3150 Average 3220 Technician: Shane Spinks Started: 3:30pm Finished: 4:00pm ~ ]~g~ngineering, Inc. Report Distribution: (I) St. Ann's Catholic Community (1) Datum Engineering, Inc. (1) Centex Construction ( I ) City of Coppell Eric J. Cleveland, P.E. ~,1) City of Coppell Senior h'oject Engineer (1) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of i-IBC Engineering. Inc. 0ILL Page I of I CONCRETE COMPR ,.aSIVE STRENGTH TEL. a division 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 08/03/2000 Report No.: 0020233 Report Date 09/05/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Centex Construction MLXI.D.: N/A CONCRETE SUPPLIER: TXI PLACEMENT OAtE: 08/03/2000 BATCH T~XIE: N/A PLANT: N/A TIME SAMPLED: 2:50pm BY: Shane Spinks Sl'ECIFICATION REQUIREMENTS WEATHER CONDITIONS: Sunny, warm STRENGTm 4000 psi @ 28 Days TEMPERATURE (F)- AIR 97 V CONCRETE: 94 F SLUMP: 3-5" TRUCK NO: N/A TIClOZT NO: N/A AIR: N/A AIR CONTENT (%): 2.3 UNIT WEIGIIT (pct'): N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION': Grade beams ASTM C- 172 ASTM C-39 SAMPLE LOCATION: F- 19 REPORT OF TESTS ACCUMULATIVE YAP. OS: 10 CYLINDER MEASURED MAXLML31 COMPRESSIVE MARKED SLL%IP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 I 5.00 08/10/2000 7 96690 3420 1 2 5.00 08/10/2000 7 95540 3380 Average 3400 I 3 5.00 08/31/2000 28 148700 5260 I 4 5.00 08/31/2000 28 145020 5 ! 30 Average 5200 Technician: Shane Spinks Started: 2:30pm Finished: 3:30pm E~--"/~~ lgineering, Inc. Report Distribution: (1) St_ Ann's Catholic Community (1) Datum Engineering, Inc. (I) Centex Construction (I) City of Coppell Eric J. Cleveland, P.E. (I) City of Coppcll Senior Project Engineer ( I )AIliancc Architects This report is exclusively for the usc of thc client indicated above and shall not be reproduced except in full without thc written approval of HBC Engineering, Inc. 0ILL Page 1 of I