St Ann Catholic-LR000901CONCRETE COMPRi. $SIVE STRENGTH TE , £
a division of']~'"~
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 08/02/2000 Report No.: 0020107 Report Date
09/01/2000
Client No.: 2310 Project No.: 94001152
Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church
Attn: Monsignor Kilian Broderick 180 Samuel Boulevard
180 Samuel Boulevard
Coppell TX 75019 Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CON'TRACTOR: Centex Construction MIX I.D.: 9506
CONCRETE SUPPLIER: TXI PLACEMENT DATE: 08/02/2000 BATCII TIME: 8:1 lam
PLAN'r: 41 TIME SAMPLED: 8:38am BY: Ervin Farris
SPECIFICATION REQUIREMENTS WEATHER co~x~orrlo.','s: Clear
STRENGT~I: 3000 psi @ 28 Days TEMPERATURE(F)- AIR 83 F CONCRETE: 84 F
SLCrMp: 5-7" TRUC~: NO: 921 TtC~CET NO: 2698630
AIR: N/A AIR CONTENT (%): N/A UNIT WEIGIIT (pcf): N/A
TEST METIIOD: ASTM C- 143 PLACEMENT LOCATION:
Pier information and technician time: See Report #0020106
ASTM C-172
ASTM C-39
SAMPLE LOCATION: R.3-10.5
REPORT OF TESTS ACCUMULATIVE YARDS: 10
CYLINDER MEASURED MAXIMU%! COMPRESSIVE
I~LS. RKED SLUMP DATE AGE LOAD STRENGTH F~sCTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
1 I 6.00 08/09/2000 7 109700 3880
I 2 6.00 08/09/2000 7 l 10610 3910
Average 3900
I 3 6.00 08/30/2000 28 151240 5350
I 4 6.00 08/30/2000 28 150670 5330
Average 5340
Technician: Ervin Farris Started: Finished: /~gin
Report Distribution: eering, Inc.
(I) St. Ann's Catholic Community (I) Datum Engineering. Inc.
(I) Centex Construction (I) City of Coppell ~'~"'/ Eric J. Cleveland, P.E.
( I ) City of Coppell { Senior Project Engineer
(I) Alliance Architects
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering. Inc.
0ILL Page 1 of I
CONCRETE COMPR.. SSIVE STRENGTH TE , £
a division
8901 Carpenter Frwy., Suite #I00
Dallas, Texas 75247
Date of Service: 08/02/2000 Report No.: 0020123 Report Date
09/01/2000
Client No.: 2310 Project No.: 94001152
Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church
Attn: Monsignor Kilian Broderick 180 Samuel Boulevard
180 Samuel Boulevard
Coppell TX 75019 Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CON'rRACTOR: Centex Construction MIX I.D.: N/A
CONCRETE SUPPLIER: TXI PLACEMENT DATE: 08/02/2000 BATCII TIME: N/A
PLANT: 38 TIME SAMPLED: 3'15pm BY: Shane Spinks
SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Sunny, warm
STRENGTIt: 3000 psi @ 28 Days TEMPERATURE (F)- AIR 104 F CONCRETE: 97
SLUMP: 3-5" TRUCK NO: N/A TICKETNO: N/A
AIR: N/A AIR CONWENT (%): 1.3 UNIT WEIGIIT (pcf): N/A
TEST METHOD: ASTM C- 143 PLACEMENT LOCATION:
Pier information and technician time: See Report #0020122
ASTM C-172
ASTM C-39
SAMPLE LOCATION: H-2, G-2. F-2
REPORT OF TESTS ACCL IULATIVE YARDS: 10
CYLINDER MEASURED ,~,L~ Xl3I L~I COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTII FIL&CTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
1 I 4.00 08/09/2000 7 106110 3750
1 2 4.00 08/09/2000 7 108350 3830
Average 3790
1 3 4.00 08/30/2000 28 146230 5170
I 4 4.00 08/30/2000 28 141350 5000
Average 5090
Technician: Shane Spinks Started: Finished: /~
Report Distribution: ngineering, Inc.
(i) St. Ann's Catholic Community (I) Datum Engineering, Inc.
(1) Centex Construction (1) City of Coppell ~ric J. Cleveland, P.E.
(1) City of Coppell Senior Project Engineer
(I) Alliance Architects
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HDC Engineering. Inc.
0ILL Page 1 of I