Loading...
St Ann Catholic-LR000901CONCRETE COMPRi. $SIVE STRENGTH TE , £ a division of']~'"~ 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 08/02/2000 Report No.: 0020107 Report Date 09/01/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CON'TRACTOR: Centex Construction MIX I.D.: 9506 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 08/02/2000 BATCII TIME: 8:1 lam PLAN'r: 41 TIME SAMPLED: 8:38am BY: Ervin Farris SPECIFICATION REQUIREMENTS WEATHER co~x~orrlo.','s: Clear STRENGT~I: 3000 psi @ 28 Days TEMPERATURE(F)- AIR 83 F CONCRETE: 84 F SLCrMp: 5-7" TRUC~: NO: 921 TtC~CET NO: 2698630 AIR: N/A AIR CONTENT (%): N/A UNIT WEIGIIT (pcf): N/A TEST METIIOD: ASTM C- 143 PLACEMENT LOCATION: Pier information and technician time: See Report #0020106 ASTM C-172 ASTM C-39 SAMPLE LOCATION: R.3-10.5 REPORT OF TESTS ACCUMULATIVE YARDS: 10 CYLINDER MEASURED MAXIMU%! COMPRESSIVE I~LS. RKED SLUMP DATE AGE LOAD STRENGTH F~sCTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 I 6.00 08/09/2000 7 109700 3880 I 2 6.00 08/09/2000 7 l 10610 3910 Average 3900 I 3 6.00 08/30/2000 28 151240 5350 I 4 6.00 08/30/2000 28 150670 5330 Average 5340 Technician: Ervin Farris Started: Finished: /~gin Report Distribution: eering, Inc. (I) St. Ann's Catholic Community (I) Datum Engineering. Inc. (I) Centex Construction (I) City of Coppell ~'~"'/ Eric J. Cleveland, P.E. ( I ) City of Coppell { Senior Project Engineer (I) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering. Inc. 0ILL Page 1 of I CONCRETE COMPR.. SSIVE STRENGTH TE , £ a division 8901 Carpenter Frwy., Suite #I00 Dallas, Texas 75247 Date of Service: 08/02/2000 Report No.: 0020123 Report Date 09/01/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CON'rRACTOR: Centex Construction MIX I.D.: N/A CONCRETE SUPPLIER: TXI PLACEMENT DATE: 08/02/2000 BATCII TIME: N/A PLANT: 38 TIME SAMPLED: 3'15pm BY: Shane Spinks SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Sunny, warm STRENGTIt: 3000 psi @ 28 Days TEMPERATURE (F)- AIR 104 F CONCRETE: 97 SLUMP: 3-5" TRUCK NO: N/A TICKETNO: N/A AIR: N/A AIR CONWENT (%): 1.3 UNIT WEIGIIT (pcf): N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Pier information and technician time: See Report #0020122 ASTM C-172 ASTM C-39 SAMPLE LOCATION: H-2, G-2. F-2 REPORT OF TESTS ACCL IULATIVE YARDS: 10 CYLINDER MEASURED ,~,L~ Xl3I L~I COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTII FIL&CTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 I 4.00 08/09/2000 7 106110 3750 1 2 4.00 08/09/2000 7 108350 3830 Average 3790 1 3 4.00 08/30/2000 28 146230 5170 I 4 4.00 08/30/2000 28 141350 5000 Average 5090 Technician: Shane Spinks Started: Finished: /~ Report Distribution: ngineering, Inc. (i) St. Ann's Catholic Community (I) Datum Engineering, Inc. (1) Centex Construction (1) City of Coppell ~ric J. Cleveland, P.E. (1) City of Coppell Senior Project Engineer (I) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HDC Engineering. Inc. 0ILL Page 1 of I