St Ann Catholic-LR000831CONCRETE COMPRESSIVE STRENGTH TE , £
ElqGINEERLNG, h'qC.
a divaion
8901 Carpenter Frwy., Suite
Dall~, Tex~ 75~7
Date of Service: 08/01/20~ Report No.: 0019995 Report Date
08/31/2000
Client No.: 2310 Project No.: 94001152
Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church
Attn: Monsignor Kilian Broderick 180 Samuel Boulevard
180 Samuel Boulevard
Coppell TX 75019 Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: Centex Construction MIX I.D.: N/A
CONCRETE SUPPLIER: TXI PLACEMENT DATE: 08/01/2000 BATCHTLME: N/A
PLn~wr: 38 T~mSAMPLED: 5:20pm BY: Shane Spinks
SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Sunny, warm
STRENGTIt: 3000 psi @ 28 Days TEMPEILS, TURE (F)- AIR 101 F CONCRETE: 98 F
SLUMP: 3-5" TRUCK NO: N/A TICKETNO: N/A
AIR: N/A AIR CON'TENT (%): 2.5 UNIT WEIGtlT (pcf): N/A
TEST METHOD: ASTM C-143 PLACEMENT LOCATION':
Grade beam
ASTM C- 172 Technician Time: See Report #0019977
ASTM C-39
SAMPLE LOCATION: C-17
REPORT OF TESTS ACCL2 ,IULATIVE YARDS: 10
CYLINDER MEASURED b'£s~XIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
I I 5.00 08/08/2000 7 109620 3880
1 2 5.00 08/08/2000 7 113450 4010
Average 3950
I 3 5.00 08/29/2000 28 131890 4660
I 4 5.00 08/29/2000 28 132300 4680
Average 4670
Technician: Shane Spinks Started: Finished:
Report Distribution: g~ Inc.
(1) St. Ann's Catholic Community (1) Datum Engineering. Inc.
(l)Centex Construction (l)City of Coppell ~ Eric JT. Cleveland, P.E.
(1) City of Coppell Senior Project Engineer
(1) Alliance Architects
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
0ILL Page 1 of I
CONCRETE COMPRi. $SIVE STRENGTH TE , £
a divL'rion ofl~aff'~J~
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 08/01/2000 Report No.: 0019978 Report Date
08/31/2000
Client No.: 2310 Project No.: 94001152
Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church
Attn: Monsignor Kilian Broderick 180 Samuel Boulevard
180 Samuel Boulevard
Coppell TX 75019 Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: Centex Construction MIX I.D.: N/A
CONCRETE SUPPLIER: TXI PLACEMENT DATE: 08/01/2000 r~ATCHTIME: N/A
PLANT: 38 TI~IESAMPLED: 3:40pm aY: Shane Spinks
SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Sunny, warm
STRENGTII: 3000 psi @ 28 Days TEMPERATURE(F)- AIR 100 F CONCRETE: 92 F
SLUMP: 3-5" TRUCK rqo: N/A TICKET NO: N/A
AIR: N/A AIR CONTENT (%): 1.8 UNIT WEIGIIT (pcf): N/A
TEST METHOD: ASTM C- 143 PLACEMENT LOCATION:
Pier information and technician time: See Report ~ 19977
ASTM C-172
ASTM C-39
SAM[PLE LOCATION: 0-3, N-3, M.5-3, M-3. L.5-3
REPORT OF TESTS ACCIv*IULATIVE YARDS: 200
CYLINDER MEASURED I~LAXIML,~! COMPRESSIVE
MARKED SLU3'IP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
I I 5.25 08/08/2000 7 108530 3840
1 2 5.25 08/08/2000 7 116000 4100
Average 3970
I 3 5.25 08/29/2000 28 153700 5440
1 4 5.25 08/29/2000 28 150670 5330
Average 5390
Technician: Shane Spinks Started: Finished: ~i~~ln
Report Distribution: ' eering, Inc.
(I) St. Ann's Catholic Community (1) Datum Engineering, Inc.
(I) Centex Construction (1) City of Coppell Eric J. Cleveland, P.E.
(i) City of Copp~ll Senior Project Engineer
(I) Alliance Architects
This report is exclusively for thc use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
01LL Page I of I
CONCRETE COMPR' .$SIVE STRENGTH TEb £
a division of
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 08/01/2000 Report No.: 0019976 Report Date
08/31/2000
Client No.: 23 l0 Project No.: 94001152
Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church
Attn: Monsignor Kilian Broderick 180 Samuel Boulevard
180 Samuel Boulevard
Coppell TX 75019 Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CON-tRACTOR: Centex Construction MIX I.D.: 9506
CONCRETE SUPPLIER: TXI PLACEMENT DATE: 08/01/2000 BATCH TI3IE: 8:38am
PLANT: 41 TIME SAMPLED: 9:45am BY: Ervin Farris
SPECIFICATION REQUIREMENTS WEATIIER CONOITIO,~S: Clear
STRE~C;TH: 3000 psi @ 28 Days 'rEMPERA~VRE (F)- AIR 88 F CONCRETE: 83 F
SLC.*-IP: 5-7" TRUCK ~O: 927 TICICET N'O: 2697569
AIR: N/A AIR CON~'T (%): N/A UNIT WEIGIIT (pcf): N/A
TEST METIIOD: ASTM C- 143 PLACEMENT LOCATION:
Pier information and technician time: See Report #0019975
ASTM C-172
ASTM C-39
SAMPLE LOCATION: Q.9-6.3
REPORT OF TESTS ACCUMULATIVE YARDS: 10
CYLINDER MEASURED MAXh-'~CC~I COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
1 1 5.75 08/08/2000 7 85660 3030
1 2 5.75 08/08/2000 7 82840 2930
Average 2980
1 3 5.75 08/29/2000 28 116470 4120
1 4 5.75 08/29/2000 28 113080 4000
Average 4060
Technician: Ervin Farris Started: Finished:
Report Distribution: ring, Inc.
(I) St. Ann's Catholic Community (1) Datum Engineering, Inc.
(I) Centex Construction ( I ) City of Coppell Eric J. Cleveland, P.E.
(I) City of Copgcll Senior Project Engineer
(I) Alliance Architects
This report is exclusively for thc use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
0ILL Page 1 of 1