Loading...
St Ann Catholic-LR000831CONCRETE COMPRESSIVE STRENGTH TE , £ ElqGINEERLNG, h'qC. a divaion 8901 Carpenter Frwy., Suite Dall~, Tex~ 75~7 Date of Service: 08/01/20~ Report No.: 0019995 Report Date 08/31/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Centex Construction MIX I.D.: N/A CONCRETE SUPPLIER: TXI PLACEMENT DATE: 08/01/2000 BATCHTLME: N/A PLn~wr: 38 T~mSAMPLED: 5:20pm BY: Shane Spinks SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Sunny, warm STRENGTIt: 3000 psi @ 28 Days TEMPEILS, TURE (F)- AIR 101 F CONCRETE: 98 F SLUMP: 3-5" TRUCK NO: N/A TICKETNO: N/A AIR: N/A AIR CON'TENT (%): 2.5 UNIT WEIGtlT (pcf): N/A TEST METHOD: ASTM C-143 PLACEMENT LOCATION': Grade beam ASTM C- 172 Technician Time: See Report #0019977 ASTM C-39 SAMPLE LOCATION: C-17 REPORT OF TESTS ACCL2 ,IULATIVE YARDS: 10 CYLINDER MEASURED b'£s~XIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE I I 5.00 08/08/2000 7 109620 3880 1 2 5.00 08/08/2000 7 113450 4010 Average 3950 I 3 5.00 08/29/2000 28 131890 4660 I 4 5.00 08/29/2000 28 132300 4680 Average 4670 Technician: Shane Spinks Started: Finished: Report Distribution: g~ Inc. (1) St. Ann's Catholic Community (1) Datum Engineering. Inc. (l)Centex Construction (l)City of Coppell ~ Eric JT. Cleveland, P.E. (1) City of Coppell Senior Project Engineer (1) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 1 of I CONCRETE COMPRi. $SIVE STRENGTH TE , £ a divL'rion ofl~aff'~J~ 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 08/01/2000 Report No.: 0019978 Report Date 08/31/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Centex Construction MIX I.D.: N/A CONCRETE SUPPLIER: TXI PLACEMENT DATE: 08/01/2000 r~ATCHTIME: N/A PLANT: 38 TI~IESAMPLED: 3:40pm aY: Shane Spinks SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Sunny, warm STRENGTII: 3000 psi @ 28 Days TEMPERATURE(F)- AIR 100 F CONCRETE: 92 F SLUMP: 3-5" TRUCK rqo: N/A TICKET NO: N/A AIR: N/A AIR CONTENT (%): 1.8 UNIT WEIGIIT (pcf): N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Pier information and technician time: See Report ~ 19977 ASTM C-172 ASTM C-39 SAM[PLE LOCATION: 0-3, N-3, M.5-3, M-3. L.5-3 REPORT OF TESTS ACCIv*IULATIVE YARDS: 200 CYLINDER MEASURED I~LAXIML,~! COMPRESSIVE MARKED SLU3'IP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE I I 5.25 08/08/2000 7 108530 3840 1 2 5.25 08/08/2000 7 116000 4100 Average 3970 I 3 5.25 08/29/2000 28 153700 5440 1 4 5.25 08/29/2000 28 150670 5330 Average 5390 Technician: Shane Spinks Started: Finished: ~i~~ln Report Distribution: ' eering, Inc. (I) St. Ann's Catholic Community (1) Datum Engineering, Inc. (I) Centex Construction (1) City of Coppell Eric J. Cleveland, P.E. (i) City of Copp~ll Senior Project Engineer (I) Alliance Architects This report is exclusively for thc use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page I of I CONCRETE COMPR' .$SIVE STRENGTH TEb £ a division of 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 08/01/2000 Report No.: 0019976 Report Date 08/31/2000 Client No.: 23 l0 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CON-tRACTOR: Centex Construction MIX I.D.: 9506 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 08/01/2000 BATCH TI3IE: 8:38am PLANT: 41 TIME SAMPLED: 9:45am BY: Ervin Farris SPECIFICATION REQUIREMENTS WEATIIER CONOITIO,~S: Clear STRE~C;TH: 3000 psi @ 28 Days 'rEMPERA~VRE (F)- AIR 88 F CONCRETE: 83 F SLC.*-IP: 5-7" TRUCK ~O: 927 TICICET N'O: 2697569 AIR: N/A AIR CON~'T (%): N/A UNIT WEIGIIT (pcf): N/A TEST METIIOD: ASTM C- 143 PLACEMENT LOCATION: Pier information and technician time: See Report #0019975 ASTM C-172 ASTM C-39 SAMPLE LOCATION: Q.9-6.3 REPORT OF TESTS ACCUMULATIVE YARDS: 10 CYLINDER MEASURED MAXh-'~CC~I COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 5.75 08/08/2000 7 85660 3030 1 2 5.75 08/08/2000 7 82840 2930 Average 2980 1 3 5.75 08/29/2000 28 116470 4120 1 4 5.75 08/29/2000 28 113080 4000 Average 4060 Technician: Ervin Farris Started: Finished: Report Distribution: ring, Inc. (I) St. Ann's Catholic Community (1) Datum Engineering, Inc. (I) Centex Construction ( I ) City of Coppell Eric J. Cleveland, P.E. (I) City of Copgcll Senior Project Engineer (I) Alliance Architects This report is exclusively for thc use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 1 of 1