Loading...
St Ann Catholic-LR000830· REPORT OF DRILLE , BELLED PIER INSPEL £ION a division of~fl--~COfl 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 08/25/2000 Report No.: 0022318 Report Date 08/30/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Colnmunitv Project: St. Ann's Catholic Church Attn: Monsignor Kilian Brod~rick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services; ~illed belled On this date, an HEC Engineerin~ technician arrived at zhe above referenced jcbsite as scheduled for drilled heJ.]e~ c. iar insDection. See aEtached sheet for reccrded daza. Technician Tit. e: 6:00 a.m. r_o 5:00 Technician: Shane Spinks ' ' Inc. Report Distribution: (1) St. Ann's Catholic Comlnunity ( I ) Datum I£ngiuceri,g. luc ( 1 ) Centex Construction ( I ) Cit? of Coppell Eric J. Cleveland, P.E. (I) City of Coppell Senior Project Engineer (I) Alliance Architects This report is exclusively Ibr the use of the client indicated above and shall uot be reproduced except in full without the written approval of HBC Engineering, Inc. 99DP Page I of ! ENG~eERING, ~qC. 890.1 Carpenter Frwy., Suite ~/100 Dallas, Texas 75247 Project: St. ^Fin's Catholic Church Report No.: 00223 ] 8 180 Samuel Boulevard, Coppell. Texas Date of Service:08/25/00 Project No.: 94001152 Technician: S. Spimks Driller: N.L. Schutte Page: I of 1 Pier Identification J.5-0.5 0.5-J.5 0.5-H.5 G.7-0.5 R-1 B-3.7 B-3.6 B-3.4 B-3.9 B-3 Pier Diameter (in.) 30 30 30 30 24 24 24 24 24 24 Bell Diameter (in.) 60 60 60 60 54 54 54 54 54 48 Top of Pier Elevation (ft) 97.0 97.0 97.0 97.0 97.0 97.0 97.0 97.0 97.0 97.0 Req. Depth from Exist. Grade (ft) 8.0 8.0 8.0 8.0 8.0 8.0 8.0 8.0 8.0 8.0 Initial Depth of Pier from Existing Grade (ft) 16.8 17.0 17.7 16.9 18.0 16.4 16.7 15.3 17.2 16.6 Final Depth of Pier from Existing Grade (ft) 16.9 17.2 17.7 17.0 18.3 16.5 16.8 15.5 17.2 16.6 Depth from Top of Concrete (ft) 14.9 15.2 15.7 15.0 14.3 12.5 12.8 11.5 13.2 12.6 Condition of Bottom (wet or dry) Dry Dry Dry Dry Dry Dry Dry Dry Dry Dry Plumb Within Tolerance (yes or no) Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes : Casing Diameter (in) N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Cased Depth (ft) N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Number of Vertical Bars (ea.) 6 6 6 6 6 6 6 6 6 6 Reinforcing Bar Size (#) 8 8 8 8 8 8 8 8 8 8 Length of Vertical Bars (ft.) 17.3 17.5 18.0 17.3 15.0 13.0 13.4 12.0 13.7 13.1 Time Drilling was Completed 10:40a.m. 10:20a.m. 10:00a.m. 9:40a.m. 2:00p.m. 12:45p.m. 12:30p.m. 1:00p.m. 1:15p.m. 1:30p.m. Time Concrete was Placed 2:30 p.m. 2:40 p.m. 2:50 p.m. 3:00 p.m. 3:15 p.m. 3:30 p.m. 3:40 p.m. 3:50 p.m. 4:00 p.m. 4:20 p.m. REPORT OF DRILLE . PIER INSPECTION a division of]~-~l~l 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 08/09/2000 Report No.: 0020762 Report Date 08/30/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Drilled pier inspection. On this date, an HBC Engineering technician arrived at the above referenced jobsite as scheduled for drilled pier inspection. See attached sheet for recorded data. Technician Time: 6:00 a.m. To 2:00 p.m. Technician: Shane Spinks , Inc. Report Distribution: (I) St. Ann's Catholic Community (I) Datum Engineering, Inc. (I) Centex Construction (I) City of Coppell Eric J. Cleveland, P.E. (I) City of Coppell Senior Project Engineer { i) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 99SDS Pa~e 1 of 1 ENGINEERII~, INC. 8901 Caq~enter Frwy., Suit8 100 Dallas, Texas 75247 Project: St. Ann's Catholic Church Report No.: 0020762 180 Samuel Boulevard, Coppell, Texas Oate of Service: 08/09/00 Project No.: 94001152 Technician: S. Spinks Driller: Page: 1 of l Pier Identification K-4.9 West K.6-4.9 East K.7-6 North Pier Diameter (in.) 24 24 24 Top of Ground Elevation (ft.) 97.5 97.5 97.5 Top of Pier Elevation (ft.) 94.5 94.5 94.5 Depth to Bearing Stratum from Ground (ft.) 40.3 42.0 40.6 Depth of Pier from Ground (ft.) 65.8 76.2 66.2 Required Penetration (ft.) 25.0 24.0 24.0 Actual Penetration (ft.) 25.5 24.2 25.6 Depth from Top of Concrete (ft.) 63.8 74.2 64.2 Condition of Bottom (wet or dry) Dry Dry Dry Plumb Within Tolerance (yes or no) Yes Yes Yes Casing Diameter (in.) 26 26 26 Cased Depth (ft.) 41.0 40.0 41.0 Number of Vertical Bars (ea.) 6 6 6 Reinforcing Bar Size (#) 8 8 8 Length of Vertical Bars (ft.) 68.0 79.5 70.2 Time Drilling was Completed 7:45 a.m. 8:30 a.m. 12:00 p.m. Time Concrete was Placed 10:00 a.m. 10:40 a.m. 2:00 p.m.