Loading...
St Ann Catholic-LR000828CONCRETE COMPRT3SIVE STRENGTH TE .'"F a division of 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 07/26/2000 Report No.: 0019431 Report Date 08/28/2000 Client No,: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CON'TRACTOR: Centex Construction MIX I.D.: 9506 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 07/26/2000 BATCIt XE~m: 8:47am PLA,WI': 41 TIME SAMPLED: 9:26am BY: Ervin Fan-is SPECIFICATION' REQUIREMENTS WEATHER CONDITIONS: Cloudy STRENGTIt: 3000 psi @ 28 Days TEMPERATURE (F) - AIR 91 F CONCRETE: 87 SLUMP: 5-7" TRUCK NO: 453 TICKET NO: 2692292 AIR: N/A AIR CONTENT (~c): N/A UNITWEIGIIT(pcf): N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Pier information and technician time: See Report ~)019430 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: E.5-8.5 REPORT OF TESTS ACCUIYUULATIVE YARDS: l0 CYLINDER MEASURED MAXIM~:%I COMPRESSIVE MARKED SLL%'IP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE I I 6.25 08/02/2000 7 93630 3310 I 2 6.25 08/02/2000 7 89840 3180 Average 32~0 1 3 6.25 08/23/2000 28 137560 4860 I 4 6.25 08/23/2000 28 137390 4860 Average 4860 Technician: Ervin Fan-is Started: Finished: Report Distribution: d~71~gineering, Inc. (1) St. Ann's Catholic Community (1) Datum Engineering. Inc. (1) Centex Construction (1) City of Coppell Eric J. Cleveland, P.E. (1) City of Coppell Senior Project Engineer (1) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page I of I cONCRETE COMPI $SIVE STRENGTH ElqGINEERI~, R~C. a division 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 07/26/2000 Report No.: 0019446 Report Date 08/28/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick ! 80 Samuel Boulevard 180 Samuel Boulevard Coppeil TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Centex Construction MIX I.D.: N/A CONCRETE SUPPLIER: TXI PLACEMENT DATE: 07/26/2000 BATCII TLME: N/A PLANT: 38 TIME SAMPLED: 3:00pm BY: Shane Spinks SPECIFICATION REQUIREMENTS WEATItER CON-DITIONS: Warm STm~NGTII: 3000 psi @ 28 Days TEMPERAX~JRE (F) - AIR 101 F CONCRETE: 97 F SLUMP: 3-5" TRUCK NO: N/A TICKET NO: N/A AIR: N/A AIR CONTENT (%): 1.9 UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C-143 PLACEMENT LOCATION: Piers under water fountain area ASTM C-172 ASTM C-39 SAMPLE LOCATION: J-4. I-4, SE. 1-4 S. J-4 SW REPORT OF TESTS ACCU3'IULATIVE YARDS: 10 CYLINDER MEASURED MAXL~IL%! COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTIt FP~S, CTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE I 1 4.75 08/02/2000 7 97590 3450 1 2 4.75 08/02/2000 7 94840 3350 Average 3400 I 3 4.75 08/23/2000 28 155200 5490 I 4 4.75 08/23/2000 28 160570 5680 Average 5590 Technician.' Shane Spinks Started: 2:00pm Finished: 4:00pm ~~~..~ Report Distribution: ~~ineering, Inc. (I) St. Ann's Catholic Community (1) Datum Engineering, Inc. (I) Centex Construction ( 1 ) CiD' of Coppell ~/Erid J. Cie veland, P.E. ( I ) City of Coppell Senior Project Engineer ( I ) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page I of 1 CONCRETE COMPR._.SSIVE STRENGTH TE .£ a division of'l~afl-d~la 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 07/27/2000 Report No.: 0019598 Report Date 08/28/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTIL~,CTOR: Centex Construction MIX I.D.: N/A CONCRETE SUPPLIER: TXI PLACEMEN'T DATE: 07/27/2000 BATCH TIME: 3:45pm PLANT: 31 TIME SAMPLED: 4:30pm BY: Shane Spinks SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Sunny, cool STRENGTH: 3000 psi @ 28 Days TEMPEILS, TURE (F)- AIR 102 F CONCRETE: 98 F SLUMP: 3-5" TRUCK NO: N/A TICKET NO: N/A AIR: N/A AIR eONTENT (%): 1.9 UNIT WEIGIIT (pet'): N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Piers ASTM C-172 ASTM C-39 SAMPLE LOCATION: 0.9-3.2. 0.9-3.4, 0.9-3.5, 0.9-3.6 REPORT OF TESTS ACCL'MULATIVE YARDS: 10 CYLINDER MEASURED ~L&XD, IUM COMPRESSIVE MARKED SLUblP DATE AGE LOAD STRENGTll FIL~*,CTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 I 5.25 08/03/2000 7 90450 3200 I 2 5.25 08/03/2000 7 96360 3410 Average 3310 I 3 5.25 08/24/2000 28 102550 3630 I 4 5.25 08/24/2000 28 100070 3540 Average 3590 Technician: Shane Spinks Started: 4:00pm Finished: 6:30pm /y~ Report Distribution: ngineering, Inc. (l) St. Ann's Catholic Community (1) Datum Engineering, Inc. (1) Centex Construction (l)City of Coppel, c.~ / E[i_c_.J_. Cleveland, P.E. (I) City of Coppell Senior Project Engineer (!) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page I of I CONCRETE COMPR._$SIVE STRENGTH TE . £ a cli~,i.~ion of'lrarracun 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 07/27/2000 Report No.: 0019572 Report Date 08/28/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Centex Construction MIX I.D.: 9506 CONCRETE SUPPLIER: TXI PLACEMEN-FDATE: 07/27/2000 BATCHTIME: 9:02am PLANT: 43 TIME SAMPLED: 9:40am BY: Ervin Fan-is SPECIFICATION' REQUIREMENTS WEATIIER CONDITIONS: Cloudy STRENGTIt: 3000 psi @ 28 Days TEMPERATURE(F)- AIR 88 F CONCRETE: 83 SLtn~.lP: 5-7" TRUCK NO: 837 TICKET N'O: 2693683 AIR: N/A AIR CONTENT (%): N/A UNIT WEIGHT (pcB: N/A TEST METHOD: ASTM C-143 PLACEMENT LOCATION: Pier information and technician time: See Report #001957 I ASTM C- 172 ASTM C-39 SAMPLE LOCATION: B-4.5 REPORT OF TESTS ACCU.'~I-LILATIVE YARDS: 10 CYLINDER MEASURED I~L~,XLMUM COMPRESSIVE MARKED SLU31P DATE AGE LOAD STRENGTIt FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 6.00 08/03/2000 7 78180 2760 I 2 6.00 08/03/2000 7 82040 2900 Average 2830 I 3 6.00 08/24/2000 28 117170 4140 1 4 6.00 08/24/2000 28 116470 4120 Average 4130 Technician: Ervin Farris Started: Finished: ~/f>~/I-l~ ~~n Report Distribution: eerlng, Inc. (i) St. Ann's Catholic Community (I) Datum Engineering, Inc. (!) Centex Construction (I) City of Coppell Eric J. Cleveland, P.E. ( 1 ) city of Coppell Senior Project Engineer (1) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 1 of 1