Loading...
St Ann Catholic-LR000825REPORT OF REINFORCING TEEL INSPECTION ENG~EERI~, INC. 8901 Carpenter F~y.. Suit~ #100 Dallas. Texas 752~.7 Date of Service: 08/25/00 Report No.: 0022348 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church 180 Samuel Boulevard 180 Samuel Boulevard Coppell, Texas 75019 Coppell, Texas Services: Observe placement of reinforcing for compliance with furnished drawings. PROJECT DATA Drawings Utilized: Structural Locations/Items Inspected: Grade Beam, line 4.9, lines E.5 to H.5 Test Method: Visual Observation REPORT OF INSPECTION ITEMS INSPECTED CORRECT INCORRECT ITEMS INSPECTED CORRECT INCORRECT ITEMS INSPECTED CORRECT INCORRECT P!acmg Drawings Approved X Bar Length and Shape X Column Tied Properly Bar Size X Proper Bar Placement X Ties ancl Spaces X Bar Graoe X Properly Tied X Stin'up Spacing/Type X Rebar Clean X Dowel Bars ~n Place X We~ded Splices Form Clean X Prooer Bar Supports X Mechanical Sphces NumCer of Bars X Lapped Splices X Proper Cover X Discrepancies/Comments: No discrepancies noted at the time of inspection. Technician: S. Spinks Stoned: 5:00 p.m. Stopped: 6:00 a.m. ReDort Distribution: ~ Inc. (1) St. Ann's Catholic Community (1) Datum Engineering. Inc. ( 1 ) Centex Construction ([) Ci~ of Coppell ( 1 ) Cit-), of Coppell (l) Alliance Architects Eric J. Cleveland, P. E. Senior Project Engineer 30gsds Th.~s roper{ is exclusively for '.he uSe of the c,ent ~nchcated aoove and shall not be repro<Juc.~] ~n full w~tho~t written approval of HBC Englneenng. Inc.