St Ann Catholic-LR000825REPORT OF REINFORCING TEEL INSPECTION
ENG~EERI~, INC.
8901 Carpenter F~y.. Suit~ #100
Dallas. Texas 752~.7
Date of Service: 08/25/00 Report No.: 0022348
Client No.: 2310 Project No.: 94001152
Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church
180 Samuel Boulevard 180 Samuel Boulevard
Coppell, Texas 75019 Coppell, Texas
Services: Observe placement of reinforcing for compliance with furnished drawings.
PROJECT DATA
Drawings Utilized: Structural
Locations/Items Inspected: Grade Beam, line 4.9, lines E.5 to H.5
Test Method: Visual Observation
REPORT OF INSPECTION
ITEMS INSPECTED CORRECT INCORRECT ITEMS INSPECTED CORRECT INCORRECT ITEMS INSPECTED CORRECT INCORRECT
P!acmg Drawings Approved X Bar Length and Shape X Column Tied Properly
Bar Size X Proper Bar Placement X Ties ancl Spaces X
Bar Graoe X Properly Tied X Stin'up Spacing/Type X
Rebar Clean X Dowel Bars ~n Place X We~ded Splices
Form Clean X Prooer Bar Supports X Mechanical Sphces
NumCer of Bars X Lapped Splices X Proper Cover X
Discrepancies/Comments: No discrepancies noted at the time of inspection.
Technician: S. Spinks Stoned: 5:00 p.m. Stopped: 6:00 a.m.
ReDort Distribution: ~ Inc.
(1) St. Ann's Catholic Community (1) Datum Engineering. Inc.
( 1 ) Centex Construction ([) Ci~ of Coppell
( 1 ) Cit-), of Coppell
(l) Alliance Architects Eric J. Cleveland, P. E.
Senior Project Engineer
30gsds
Th.~s roper{ is exclusively for '.he uSe of the c,ent ~nchcated aoove and shall not be repro<Juc.~] ~n full w~tho~t written approval of HBC Englneenng. Inc.