St Ann Catholic-LR000824CONCRETE COMPRESSIVE STRENGTH TE ,
a division
8901 Carpenter Frwy., Suite #100
Dallas, Texas 7~247
Date of Service: 07/25/2000 Report No.: 0019315 Report Date
08/24/2000
Client No.: 2310 Project No.: 94001152
Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church
Attn: Monsignor Kilian Broderick 180 Samuel Boulevard
180 Samuel Boulevard
Coppell TX 75019 Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CON~rP, ACTOR: Centex Construction MIX I.D.: 9506
CONCRETE SUPPLIER: TXI PLACEMENT DATE: 07/25/2000 BATCH TIME: 9:25am
PLANT: 41 TIME SAMPLED: 10:10am BY: Ervin Fan-is
SPECIFICATION REQUIREI~tENTS WEATHER CONDITIONS: Cloudy
STRENGTlt: 3000 psi @ 28 Days TEMPERATURE (F)- AIR 87 F CONCRETE: 83 F
SLLrMp: 5-7" TRUCK NO: 716 TICKET NO: 2691109
AIR: N/A AIR CONTENT (%): N/A UNIT WEIGHT (pct'): N/A
TEST METHOD: ASTM C- 143 PLACEMENT LOCATION':
Pier information and technician time: See Report gOO 19314
ASTM C-172
ASTM C-39
SAMPLE LOCATION: X-8.1
REPORT OF TESTS ACCUM'ULATIVE YARDS: 10
CYLINDER MEASURED MAXIMU3! COMPRESSIVE
MARKED SLU31P DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
1 I 6.00 08/01/2000 7 103660 3670
1 2 6.00 08/01/2000 7 107480 3800
Average 3740
I 3 6.00 08/22/2000 28 143390 5070
1 4 6.00 08/22/2000 28 141350 5000
Average 5040
Technician: Ervin Farris Started: Finished:
Report Distribution: ring, Inc.
(1) St. Ann's Catholic Community (I) Datum Engineering, Inc.
(1) Centex Construction (I) Cit3' of Coppell ~.~e.~ Eric J. Cleveland, P.E.
(1) City of Coppell Senior Project Engineer
(1) Alliance Architects
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
0ILL Page I of I
CONCRETE COMPI 3SIVE STRENGTH TEL-£
a division
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 08/15/:2000 Report No.: 0021292 Report Date
08/24/2000
Client No.: 2310 Project No.: 94001152
Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church
Attn: Monsignor Kilian Broderick 180 Samuel Boulevard
180 Samuel Boulevard
Coppell TX 75019 Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTIL~CTOR: Centex Construction MIX I.D.: 8205
CONCRETE SUPPLIER: TXI PLACEMENT DATE: 08/15/2000 BATCH Tiara: 12:49pm
PLANT: 31 TII~mSAMPLED: l:45pm BY: Eric Garcia
SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear
STRENGTH: 4000 psi @ 28 Days TEMPERATURE (F). AIR 97 F CONCRETE: 91 F
SLL~-IP: 3-5" TRUCK NO: 630 TICKET NO: 2701338
AIR: N/A AIR CONTENT (%): N/A UNIT WEIGHT (pcf): N/A
TEST METHOD: ASTM C- 143 PLACEI~IENT LOCATION:
Wall ~ Line K, 12.4-16
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: Middle layer of wall
REPORT OF TESTS ACCUMULATIVE YARDS: 40
CYLINDER MEASURED ,~,LAXLMUM COMPRESSIVE
MARKED SL~ DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
1 1 5.00 08/22/2000 7 102000 36 !0
1 2 5.00 08/22/2000 7 100070 3540
Average 3580
1 3 5.00 09/12/2000 28
1 4 5.00 09/12/2000 28
Technician: Eric Garcia Started: 12:00pm Finished: 2:30pm ~e
Report Distribution: erlng, Inc.
(l) St. Ann's Catholic Community (1) Datum Engineering. Inc.
(I) Centex Construction ( 1 ) City. of Coppell Eric J. Cleveland, P.E.
(1) City of Coppell Senior Project Engineer
( ! ) Alliance Architects
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
0ILL Page 1 of I