Loading...
St Ann Catholic-LR000824CONCRETE COMPRESSIVE STRENGTH TE , a division 8901 Carpenter Frwy., Suite #100 Dallas, Texas 7~247 Date of Service: 07/25/2000 Report No.: 0019315 Report Date 08/24/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CON~rP, ACTOR: Centex Construction MIX I.D.: 9506 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 07/25/2000 BATCH TIME: 9:25am PLANT: 41 TIME SAMPLED: 10:10am BY: Ervin Fan-is SPECIFICATION REQUIREI~tENTS WEATHER CONDITIONS: Cloudy STRENGTlt: 3000 psi @ 28 Days TEMPERATURE (F)- AIR 87 F CONCRETE: 83 F SLLrMp: 5-7" TRUCK NO: 716 TICKET NO: 2691109 AIR: N/A AIR CONTENT (%): N/A UNIT WEIGHT (pct'): N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION': Pier information and technician time: See Report gOO 19314 ASTM C-172 ASTM C-39 SAMPLE LOCATION: X-8.1 REPORT OF TESTS ACCUM'ULATIVE YARDS: 10 CYLINDER MEASURED MAXIMU3! COMPRESSIVE MARKED SLU31P DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 I 6.00 08/01/2000 7 103660 3670 1 2 6.00 08/01/2000 7 107480 3800 Average 3740 I 3 6.00 08/22/2000 28 143390 5070 1 4 6.00 08/22/2000 28 141350 5000 Average 5040 Technician: Ervin Farris Started: Finished: Report Distribution: ring, Inc. (1) St. Ann's Catholic Community (I) Datum Engineering, Inc. (1) Centex Construction (I) Cit3' of Coppell ~.~e.~ Eric J. Cleveland, P.E. (1) City of Coppell Senior Project Engineer (1) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page I of I CONCRETE COMPI 3SIVE STRENGTH TEL-£ a division 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 08/15/:2000 Report No.: 0021292 Report Date 08/24/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTIL~CTOR: Centex Construction MIX I.D.: 8205 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 08/15/2000 BATCH Tiara: 12:49pm PLANT: 31 TII~mSAMPLED: l:45pm BY: Eric Garcia SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear STRENGTH: 4000 psi @ 28 Days TEMPERATURE (F). AIR 97 F CONCRETE: 91 F SLL~-IP: 3-5" TRUCK NO: 630 TICKET NO: 2701338 AIR: N/A AIR CONTENT (%): N/A UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C- 143 PLACEI~IENT LOCATION: Wall ~ Line K, 12.4-16 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: Middle layer of wall REPORT OF TESTS ACCUMULATIVE YARDS: 40 CYLINDER MEASURED ,~,LAXLMUM COMPRESSIVE MARKED SL~ DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 5.00 08/22/2000 7 102000 36 !0 1 2 5.00 08/22/2000 7 100070 3540 Average 3580 1 3 5.00 09/12/2000 28 1 4 5.00 09/12/2000 28 Technician: Eric Garcia Started: 12:00pm Finished: 2:30pm ~e Report Distribution: erlng, Inc. (l) St. Ann's Catholic Community (1) Datum Engineering. Inc. (I) Centex Construction ( 1 ) City. of Coppell Eric J. Cleveland, P.E. (1) City of Coppell Senior Project Engineer ( ! ) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 1 of I