Loading...
St Ann Catholic-LR000822cONCRETE COMPR..,SSIVE STRENGTH TE , £ a division of'~'~l:~ 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 07/21/2000 Report No.: 0019023 Report Date 08/22/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA Co~rRACTOR: Centex Construction MIX I.D.: 9506 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 07/21/2000 BATCH TIME: 8:34am PLANT: 4 ! TIME SAMPLED: 9:20am BY: Ervin Fan-is SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear STREN(;TH: 3000 psi @ 28 Days TE~IPEt~TURE (F)- AIR 89 F CONCRETE: 88 F SLb.-u,: 5-7" TRUCK NO: 38 TICKET NO: 2688824 AIR: N/A AIR CONTENT (%): N/A UNIT WEIGItT (pc0: N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Pier information and technician time: See Report g0019022 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: E.6-11.4 REPORT OF TESTS ACCUMULATIVE YARDS: 10 CYLINDER MEASURED MAXD, IUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE I I 6.75 07/28/2000 7 85540 3020 1 2 6.75 07/28/2000 7 87910 3110 Average 3070 1 3 6.75 08/18/2000 28 132020 4670 I 4 6.75 08/18/2000 28 131730 4660 Average 4670 Technician: Ervin Fan-is Started: Finished: ~'4-!Af~/n Report Distribution: eering, Inc. (1) St. Ann's Catholic Community (I) Datum Engineering, Inc. (1) Centex Construction (1) CiO' of Coppell Eric J. Cleveland, P.E. (I) City of Coppell Senior Project Engineer (1) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 1 of I 'CONCRETE COMPRESSIVE STRENGTH TE , £ a division of'l~tl-~lart 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 07/24/2000 Report No.: 0019186 Report Date 08/22/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Centex Construction MIX I.D.: 9506 CONCRETE SUPPLIER: TXI PLACEM. ENT DATE: 07/24/2000 BATCH TIME: 8:28am PLANT: 37 TIME SAMPLED: 9:25am BY: Ervin Farris SPECIFICATION REQUIREMENTS WEATHER CONOITIONS: Clear STRENGTH: 3000 psi @ 28 Days TEMPEILS, TURE (F)- AIR 87 F CONCRETE: 83 F SLUMP: 5-7" TRUCK N'O: 37 TICKET NO: 2689825 AIR: N/A AIR CONTENT (%): N/A UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION': Pier information and technician time: See Report gO019185 ASTM C-172 ASTM C-39 SAMPLE LOCATION: C.6-10.5 REPORT OF TESTS ACCUMULATIVE YARDS: 10 C~LNDER MEASURED .MA XR~ITv3! COI~fPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE I I 6.50 07/31/2000 7 98100 3470 1 2 6.50 07/31/2000 7 93880 3320 Average 3400 1 3 6.50 08/21/2000 28 142810 5050 1 4 6.50 08/21/2000 28 141060 4990 Average 5020 Technician: Ervin Farris Started: Finished: Report Distribution: ineering, Inc. (I) St. Ann's Catholic Community (1) Datum Engineering, Inc. (i) Centex Construction (1) City of Coppell e,~ - E/'ic J. Cleveland, P.E. ( 1 ) City of Coppell Senior Project Engineer (1) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 1 of 1 · tFJPORT OF DRILLF ' PIER INSPECTION "" ~-NGINEERING, LNC. a division of'ffl~ll-'~l:l~ 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 08/08/2000 Report No.: 0020639 Report Date 08/22/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Drilled pier inspection. On this date, an HBC Engineering technician arrived at the above referenced jobsite as scheduled for drilled pier inspection. See attached sheet for recorded data. Technician Time: 6:00 a.m. to 3:30 p.m. Technician: Ervin Farris /I'~/~~0eering, Inc. Report Distribution: (I) St. Ann's Catholic Community (I) Datum Engineering. Inc. (1) Centex Construction (I) Cit)= of Coppell Eric J. Cleveland, P.E. (I) City of Coppell Senior Project Engineer (I) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 99SDS Pa~e 1 of 1 REPORT OF DRILLED PIERS 8901 Carpenter Frwy., Suite 100 Dallas, Texas 75247 Project: St. Ann's Catholic Church - Remedial Piers - Bell Tower Report No.: 0020639 180 Samuel Boulevard, Coppell, Texas Date of Service: 08/08/00 Project No.: 94001152 Technician: E. Fawis Driller: Page: I of I Pier Identification F.5/4.9 F.9/4.9 Pier Diameter (in.) 24 24 Top of Ground Elevation (ft.) N/A N/A Top of Pier Elevation (ft.) N/A N/A Depth to Bearing Stratum from Ground (ft.) 41.0 40.25 Depth of Pier from Ground (ft.) 66.33 75.18 Required Penetration (ft.) 25 34 Actual Penetration (ft.) 25.33 34.92 Depth from Top of Concrete (ft.) 65.33 74.18 Condition of Bottom (wet or dry) Dry Dry Plumb Within Tolerance (yes or no) Yes Yes Casing Diameter (in.) 26 26 Cased Depth (ft.) 45.0 45.0 Number of Vertical Bars (ea.) 6 6 Reinforcing Bar Size (#) 8 8 Length of Vertical Bars (ft.) 71.0 79.33 Time Drilling was Completed 10:21 a.m. 9:38 a.m. Time Concrete was Placed 1:18 p.m. 1:48 p.m. REPORT OF REINFORCING STEEL INSPECTION Date of Service: 08/22/00 Report No.: 0021976 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Observe placement of reinforcing for compliance with furnished drawings. PROJECT DATA Drawings Utilized: Locations/Items Inspected: Grade Beam on Grid line 11.1, lines C.6 to D.6; line C.6, lines l 1.1 to 10.5; line 10.5, lines Ato C.6; line A, lines 8.4 to 10.5; line 8.4, lines A to B; line B, lines 6.~ to 8.4; and line 6.8, lines B to D8 Test Method: Visual Obsep,,ation REPORT OF INSPECTION ITEMS INSPECTED CORRECT INCORRECT ITEMS INSPECTED CORRECT INCORRECT ITEMS INSPECTED CORRECT INCORRECT Placing Drawings A~oproved X Bar Length and S[qape X Column Tied P~oOerLv Bar S,ze X Proper Bar Placement X T~es and Spaces Bar Grade X Properly Tied X Stirrup Spacing/Type Rebar Clean X Dowe~ Bars in Place X We!~le~ Sp~ces Form Clean X Proper Bar Supports X Mechanical Sp,~'~es Number of Bars X Lap~l SpI~S X Proper Cover X Discrepancies/Comments: No discrepancies noted at the time of inspection. Technician: M. Villanueva Started: 12:00 p.m. Stopped: 1:00 p.m. (1) St. Ann's Catholic Community (1) Datum Engineering. Inc. (1) Centex Construction (1) City of Coppell (1) City of Coppell (1) Alliance Architects Et'JC J. Cleveland, P.E. Senior Prqiect Engineer 30edp Thts repot[ ~s excluswely i'or the use of the chent ind,cated above and shall not be reproduced w~lout w,nt~en approval of HBC Englneenng mc