St Ann Catholic-LR000821CONCRETE COMPRi.3SIVE STRENGTH TE , £
~,INC.
a division of I~t-~tMI
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 07/20/2000 Report No.: 0018903 Report Date
08/21/2000
Client No.: 2310 Project No.: 94001152
Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church
Attn: Monsignor Kilian Broderick 180 Samuel Boulevard
180 Samuel Boulevard
Coppell TX 75019 Coppell. Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: Centex Construction MIX I.D.: 9506
CONCRETE SUPPLIER: TXI PLACEMENT DATE: 07/20/2000 BATCII TIME: 8:17am
PLANT: 41 TI3,1ESAMPLED: 8:50am BY: Ervin Fan-is
SPECIFICATION' REQUIREMENTS WEATHER CONDITIONS: Clear
STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F) - AIR 91 F CONCRETE: 87 F
SLUMP: 5-7" TRUCK NO: 802 TICKET NO: 2687582
AIR: N/A AIR CONTENT (%): N/A UNIT WEIGHT (pcf): N/A
TEST METHOD: ASTM C-143 PLACEMENT LOCATION:
Pier information and technician time: See Report gOO 18902
ASTM C-172
ASTM C-39
SAMPLE LOCATION: M- 19
REPORT OF TESTS ACCL~tI, JLATIVE YARDS: l0
CYLINDER .~,-IEASURED MAXEML3! COMPRESSIVE
.~L~RKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
I 1 7.00 07/27/2000 7 96430 3410
I 2 7.00 07/27/2000 7 97240 3440
Average 3430
1 3 7.00 08/17/2000 28 125690 4440
1 4 7.00 08/17/2000 28 123820 4380
Average 4410
Technician: Ervin Farris Started: Finished: ~~
Report Distribution: 'nvineerinv'~ ~
Inc.
( I ) St. Ann's Catholic Communi~, (I) Datum Engineering, Inc.
( I ) Centex Construction (I) City of Coppell Eric J. Cleveland, P.E.
( I ) City. of Coppell Senior Project Engineer
( l ) Alliance Architects
This report is exclusively for thc use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
01LL Page 1 of I