Loading...
St Ann Catholic-LR000821CONCRETE COMPRi.3SIVE STRENGTH TE , £ ~,INC. a division of I~t-~tMI 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 07/20/2000 Report No.: 0018903 Report Date 08/21/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell. Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Centex Construction MIX I.D.: 9506 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 07/20/2000 BATCII TIME: 8:17am PLANT: 41 TI3,1ESAMPLED: 8:50am BY: Ervin Fan-is SPECIFICATION' REQUIREMENTS WEATHER CONDITIONS: Clear STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F) - AIR 91 F CONCRETE: 87 F SLUMP: 5-7" TRUCK NO: 802 TICKET NO: 2687582 AIR: N/A AIR CONTENT (%): N/A UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C-143 PLACEMENT LOCATION: Pier information and technician time: See Report gOO 18902 ASTM C-172 ASTM C-39 SAMPLE LOCATION: M- 19 REPORT OF TESTS ACCL~tI, JLATIVE YARDS: l0 CYLINDER .~,-IEASURED MAXEML3! COMPRESSIVE .~L~RKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE I 1 7.00 07/27/2000 7 96430 3410 I 2 7.00 07/27/2000 7 97240 3440 Average 3430 1 3 7.00 08/17/2000 28 125690 4440 1 4 7.00 08/17/2000 28 123820 4380 Average 4410 Technician: Ervin Farris Started: Finished: ~~ Report Distribution: 'nvineerinv'~ ~ Inc. ( I ) St. Ann's Catholic Communi~, (I) Datum Engineering, Inc. ( I ) Centex Construction (I) City of Coppell Eric J. Cleveland, P.E. ( I ) City. of Coppell Senior Project Engineer ( l ) Alliance Architects This report is exclusively for thc use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 1 of I